Tariff Orders

Filter on   

S. No. Petition No Party Name Subject Order Date View
1 2076/2023 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Petition for review of Commissions Order dated 02.12.2022 passed in the Petition No.2028/22 for Truing up of ARR for FY 2018-19 to FY 2020-21 for CSCTPP Units 5 and 6 30/05/2023
2 2096/2023 Rajasthan Rajya Vidyut Prasaran Nigam Ltd. Petition for Review of the Commission Order dated 01.12.2022 passed in Petition No.1978/22 25/05/2023
3 2069/2022 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Truing up of ARR of FY 2021-22 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 12/05/2023
4 2065/2022 Rajasthan State Load Despatch Centre of RVPN In the matter of approval of true up for FY 2021-22 and Annual Revenue requirement and SLDC Charges for FY 2023-24 of State Load Despatch Centre 03/05/2023
5 608/2016 and 609/2016 Barmer Lignite Mining Company Limited IA No. 01- Application seeking directions for obtaining Laboratory figures of lignite, and seeking information about the actual payments made by Petitioner to the MDO towards mining expenses, besides the mining expenses incurred by the MDO (SWML) and IA No. 02- Application seeking confirmation of the principles governing determination of final transfer price of lignite in petition No. 608/2016 and 609/2016. 21/04/2023
6 2066/2022 Jaipur Vidyut Vitran Nigam Ltd. In the matter of approval of True up for FY 2021-22 and Aggregate Revenue Requirement, Tariff and Investment Plan for FY 2023-24. 31/03/2023
7 2067/2022 Ajmer Vidyut Vitran Nigam Ltd. In the matter of approval of True up for FY 2021-22 and Aggregate Revenue Requirement, Tariff and Investment Plan for FY 2023-24. 31/03/2023
8 2068/2022 Jodhpur Vidyut Vitran Nigam Ltd. In the matter of approval of True up for FY 2021-22 and Aggregate Revenue Requirement, Tariff and Investment Plan for FY 2023-24. 31/03/2023
9 608/2016 and 609/2016 Barmer Lignite Mining Company Limited Application seeking directions for listing and hearing petition Nos. 608 and 609 of 2016 along with petition no. 593 of 2016, 966 of 2016, 1285 of 2017, 1510 of 2019, 1473 and 1474 of 2019, 1584 of 2019, 1846 of 2020 and 1965 of 2021. 24/01/2023
10 2020/2022 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. In the matter of Petition filed by Rajasthan Rajya Vidyut Utpadan Nigam Ltd. for In-Principle Approval of additional capital expenditure before incurring additional capital expenditure after cut-off date for CSCTPP unit 5 and 6. 24/01/2023
11 2045/2022 Rajasthan Urja Vikas Nigam Ltd To seek approval for procurement of 1200 MW power on long term basis i.e.25 years from solar power projects with committed power supply from Energy Storage Systems for at least six hours during the peak demand period 23/01/2023
12 2028/2022 Rajasthan Rajya Vidyut Utpadan Nigam Ltd In the matter of Truing up of Aggregate Revenue Requirement for FY 2018-19 to FY 2020-21 for Chhabra Super Critical Thermal Power Project (CSCTPP) (Units 5 and 6)of Rajasthan Rajya Vidyut Utpadan Nigam Ltd. 02/12/2022
13 1978/2022 Rajasthan Rajya Vidyut Prasaran Nigam Ltd. In the matter of approval of Investment Plan for Rajasthan Rajya Vidyut Prasaran Nigam Limited FY 2022-23. 01/12/2022
14 2032/2022 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Review of Commissions Order dated 23.06.2022 passed in the Petition No. 1985/2022 for determination of ARR and Tariff for CSCTPP unit 5and6 for FY 2022-23 09/11/2022
15 2031/2022 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Petition for review of Commissions Order dated 23.06.2022 passed in the Petition No. 1980/22 for True up for FY 2020-21 and ARR and tariff for FY 2022-23 09/11/2022
16 2041/2022 Rajasthan Rajya Vidyut Prasaran Nigam Ltd. Petition for Review of the Commissions Order dated 13.07.2022 passed in Petition No 1979/22 09/11/2022
17 2011/2022 Jaipur Vidyut Vitran Nigam Ltd Aggregate Revenue Requirement, Tariff Petition and Investment Plan FY 2022-23 01/09/2022
18 2012/2022 Ajmer Vidyut Vitran Nigam Ltd. Aggregate Revenue Requirement, Tariff Petition and Investment Plan FY 2022-23 01/09/2022
19 2013/2022 Jodhpur Vidyut Vitran Nigam Ltd. Aggregate Revenue Requirement, Tariff Petition and Investment Plan FY 2022-23 01/09/2022
20 1991/2022 Jaipur Vidyut Vitran Nigam Ltd. In the matter of approval of true up for FY 2020-21 14/07/2022
21 1993/2022 Ajmer Vidyut Vitran Nigam Ltd. In the matter of approval of true up for FY 2020-21 14/07/2022
22 2001/2022 Jodhpur Vidyut Vitran Nigam Ltd. In the matter of approval of true up for FY 2020-21 14/07/2022
23 1979/2022 Rajasthan Rajya Vidyut Prasaran Nigam Ltd. In the matter of approval of true up for FY 2020-21 and ARR and Tariff for FY 2022-23 of Transmission and SLDC 13/07/2022
24 1980/2022 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Determination of ARR for FY 2022-23 and true up for FY 2020-21 23/06/2022
25 1985/2022 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Determination of ARR and Tariff for FY 2022-23 for Chhabra Super Critical Thermal Power Project (CSCTPP) (Units 5 and 6) 23/06/2022
26 2014/2022 Suo Motu Generic Tariff for Biomass, Biogas and Biomass Gasifier based power plants getting commissioned in the State during FY 2022-23 06/06/2022
27 1988/2022 Rajasthan Rajya Vidyut Prasaran Nigam Limited Petition for review of Commissions Order dated 23.12.2021 24/05/2022
28 1972/2021 Rajasthan Rajya Vidyut Prasaran Nigam Limited Petition for Review of the Commissions Order dated 22.11.2021 24/05/2022
29 1928/2021, 1940/2021, 1974/2021, 1955/2021, 1942/2021, 1975/2021 Discoms Petition for review of order dated 27.01.2021 and 07.09.2021 for true-up of 18-19 and 19-20 24/05/2022
30 1990/2022 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Petition for review of Order dated 28.12.2021 issued by the Commission 23/05/2022
31 1981/2022 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Petition filed for Aggregate Revenue Requirement (ARR) and Tariff for FY 2022-23 for DCCPP (330MW) 28/04/2022
32 2009/2022 Suo Motu Direction issued by the State Government u/s 108(1) of Electricity Act, 2003 with regard to consider the tariff for Tourism and Hospitality Sector in Industrial category instead of the present rate of Non Domestic tariff. 01/04/2022
33 1956/2021 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Review of Commissions Order dated 04.10.2021 passed in the Petition No. 1880/21 31/03/2022
34 1987/2022 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Review of Commissions Order dated 15.12.2021 passed in the Petition No. 1872/21 31/03/2022
35 1879/2021 Rajasthan Vidyut Utpadan Nigam Ltd. Determination of Final Capital Cost and Aggregate Revenue Requirement (ARR) and Tariff for FY 2018-19 to FY 2021-22 for Chhabra Super Critical Thermal Power Project (CSCTPP) (Units 5 and 6) 28/12/2021
36 1875/2021 Rajasthan Rajya Vidyut Prasaran Nigam Ltd. Approval of true up for FY 2019-20 and Annual Revenue Requirement and Tariff for FY 2021-22 of Transmission and SLDC 23/12/2021
37 1872/2021 Rajasthan Vidyut Utpadan Nigam Ltd. In the matter of Truing up of ARR FY 2019-20 and ARR and Tariff for FY 2021-22 15/12/2021
38 1841/2020, 1842/2020, 1843/2020, 1627/2020, 1625/2020, 1626/2020, 1596/2019, 1799/19 Discoms In the matter of approval of Multi Year Aggregate Revenue Requirement, Tariff Petition and investment plan of Jaipur Vidyut Vitran Nigam Ltd. (JVVNL), Ajmer Vidyut Vitran Nigam Ltd. (AVVNL) and Jodhpur Vidyut Vitran Nigam Ltd. (JdVVNL) for FY 2020-21 to FY 2023-24. 24/11/2021
39 1878/2021 Rajasthan Vidyut Utpadan Nigam Ltd. Determination of Annual Revenue Requirement (ARR) and Tariff for FY 2020-21 for Dholpur Combined Cycle Power Plant (DCCPP) 22/11/2021
40 1852/2020 Rajasthan Rajya Vidyut Prasaran Nigam Ltd. Approval of Investment Plan FY 2021-22 22/11/2021
41 1479/2019 M/s Rollz Material Handling Systems Pvt. Ltd. In the matter of determination of project specific tariff of Municipal Solid Waste to Energy plant under Section 62 and 86 of the Electricity Act, 2003. 21/10/2021
42 1760/2020 Sh. Mohan Lal Prajapat Petition filed for review of Commissions order dated 06.02.2020 passed in the matter of determination of ARR and tariff of JVVNL, AVVNL and JdVVNL for FY 2019 20 04/10/2021
43 1880/2021 Rajasthan Vidyut Utpadan Nigam Ltd. Approval of true-up of ARR for FY 2014-15 to FY 2019-20 and determination of ARR and tariff for FY 2021-22 KaTPP Unit 1 and 2 04/10/2021
44 1844/2020, 1862/2020, 1847/2020 JVVNL AVVNL JdVVNL Approval of true up for FY 2019-20 07/09/2021
45 1876/2021 Rajasthan Rajya Vidyut Prasaran Nigam Ltd Review of Commission Order dated 12.10.2020 23/07/2021
46 1854/2020 Rajasthan Rajya Vidyut Prasaran Nigam Ltd. Review of Commission Order dated 08.10.2020 14/07/2021
47 593/2016 Barmer Lignite Mining Company Limited In the matter of determination of transfer price of lignite from Kapurdi and Jalipa mines for FY 2012 to FY 2020 26/03/2021
48 1881/2021 Suo Motu Determination of Generic Tariff for sale of electricity from Biomass, Biogas and Biomass Gasifier based power plants getting commissioned in the State during FY 2020-21 and FY 2021-22 23/03/2021
49 1818/2020 Rajasthan Vidyut Utpadan Nigam Ltd. Review of Commission Order dated 11.09.2020 22/03/2021
50 1665/2020 Sh. D.P. Chirania and Ors. In the matter of review of Commission order dated 06.02.2020 03/03/2021
51 1612/2020 Rajasthan Vidyut Utpadan Nigam Ltd. Determination of Provisional Capital Cost,ARR and Provisional Tariff for Units 7and 8 of Suratgarh Super Critical Thermal Power Station for FY 2019-20 and FY 2020-21 03/02/2021
52 1599/2020 Jaipur Vidyut Vitran Nigam Ltd. Approval of True-up of ARR for FY 2018-19 27/01/2021
53 1600/2020 Ajmer Vidyut Vitran Nigam Ltd. Approval of True-up of ARR for FY 2018-19 27/01/2021
54 1613/2020 Jodhpur Vidyut Vitran Nigam Ltd. Approval of True-up of ARR for FY 2018-19 27/01/2021
55 1744/2020 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Review of Commission Order dated 12.05.2020 passed in the Petition No. 1515/19 18/01/2021
56 1587/2020 Rajasthan Vidyut Prasaran Nigam Ltd. In the matter of approval of true up for FY 2018-19 and ARR and Tariff for FY 2020-21 of Transmission and SLDC 12/10/2020
57 1590/2019 Rajasthan Vidyut Utpadan Nigam Ltd. Approval of True up of ARR for FY 2018-19 and Determination of ARR and Tariff for FY 2020-21 for RVUN power stations 11/09/2020
58 1579/2019 Rajasthan Vidyut Prasaran Nigam Ltd. Approval of Additional Expenditure for FY 2018-19 11/09/2020
59 1586/19 Giral Lignite Power Limited In the matter of APR for FY 2018-19 and approval of ARR and Tariff for FY 2020-21 for Giral Lignite Power Limited (GLPL) (Units 1-2) 17/08/2020
60 1591/19 Rajasthan Vidyut Utpadan Nigam Ltd. Determination of ARR and Tariff for FY 2020-21 for Kalisindh Thermal Power Project (Units 1 and 2) 11/08/2020
61 1581/19 Rajasthan Vidyut Utpadan Nigam Ltd. Approval of Additional Capitalization for up-gradation of C and I system of Stage I Unit 2 of Suratgarh Thermal Power Station 21/07/2020
62 1611/20 Rajasthan Vidyut Utpadan Nigam Ltd. In-principle approval of additional capitalization for up-gradation of HMI servers of Gas Turbine and HMI workstation of Max DNA system of Dholpur Combined Cycle Power Plant 21/07/2020
63 593/16 Barmer Lignite Mining Company Ltd. determination of transfer price of lignite from Kapurdi and Jalipa mines for FY 2011-12 to FY 2019-20 09/07/2020
64 1546/19 RVUNL Approval of APR for FY 2013-14 to FY 2017-18 for Chhabra Thermal Power Project Units 3 and 4 27/05/2020
65 1515/2019 RVUNL Determination of Final Capital Cost and ARR and Tariff for FY 2014-15 to FY 2019-20 for Kalisindh Thermal Power Project (Unit 1 and 2) 12/05/2020
66 - Sou-motu Tariff for sale of power from Wind and Biomass power projects 29/04/2020
67 I.A. No. 2 of 2020 in Petition No. 1583/19 M/s JSW Energy (Barmer) Ltd. Interim tariff for FY 2020-21 23/04/2020
68 1590/19 RUVNL Interim tariff for Chhabra Super Critical Thermal Power Plant Unit (5-6) for FY 2020-21 23/04/2020
69 1517/19 Giral Lignite Power Ltd. Determination of ARR and Tariff for GLPL Unit 1 and 2 for FY 2019-20 25/02/2020
70 - Suo-Motu Determination of pre-fixed levellised tariff for sale of power from power projects set up under Component-A and C of the PM KUSUM Scheme of GoI to the State Discoms. 11/02/2020
71 1541/19, 1542/19, 1543/19 JVVNL AVVNL JdVVNL Approval of ARR and Tariff Petition of Discoms for FY 2019-20. 06/02/2020
72 1539/19 RVPN Approval of true up of ARR for FY 2017-18 and ARR and Tariff for FY 2020 of Transmission and SLDC 31/01/2020
73 - Suo-Motu Determination of generic tariff for Biomass, Biogas and Biomass Gasifier based power plants for FY 2019-20 and revised variable charges of the Biomass power plants. 15/01/2020
74 1594/19 RUVNL Adoption of tariff for 6800 MW solar power under Section 63 of the Act. 08/01/2020
75 1516/19 RVUN Approval of ARR and provisional Tariff for Chhabra Super Critical Thermal Power Plant Units 5 and 6 for FY 2020 06/01/2020
76 1415/2018 1421/2018 1418/2018 JVVNL AVVNL JdVVNL Approval of True-up of ARR for FY 2017-18 31/12/2019
77 1417/2018 1423/2018 1420/18 JVVNL AVVNL JdVVNL Approval of Investment Plan for FY 2019-20 31/12/2019
78 1549/19 Rajasthan Urja Vikas Nigam Ltd. Adoption of tariff for 750 MW solar power under Section 63 of the Act. 20/12/2019
79 1514/19 RVUNL In the matter of approval of ARR and determination of tariff for FY 2020 for Power Stations of Rajasthan Rajya Vidyut Utpadan Nigam Ltd. 18/12/2019
80 1485/19 RVUNL Approval of APR for FY 2013-14 to FY 2017-18 for RGTPP Stage-III (160 MW) 21/10/2019
81 1458/19 RVUNL Seeking in principle approval of additional capitalization at Kota Super Thermal Power Station (Unit 1 to 7) 22/08/2019
82 1441/2018 RVUNL True up of ARR for FY 2017-18 05/08/2019
83 1442/2018 Giral Lignite Power Ltd. True-up of ARR for Units 1 and 2 for FY 2017-18 30/07/2019
84 1439/2018 RVUNL Approval of provisional Capital Cost, ARR and Tariff for Chhabra Super Critical Tharmal Power Plant Unit 5 and 6 for FY 2018-19 30/07/2019
85 1478/19 RVUNL Review of Commission’s order dated 08.03.2019 issued in the matter of determination of final capital cost, ARR and Tariff for CTPP Unit 3 and 4 for FY 13-14 to 18-19 03/07/2019
86 966/16 (I.A. No. 13 of 2018) M/s Barmer Lignite Mining Company Ltd. Determination of Transfer Price of Lignite for FY 2017-18 from Kapurdi and Jalipa mines 24/06/2019
87 1286/17 M/s JSW Energy (Barmer) Ltd. Determination of ARR and tariff for FY 2018-19 13/06/2019
88 1286/17 (I.A. No. 1 of 2019) M/s JSW Energy (Barmer) Ltd. Interim tariff for FY 2019-20 01/05/2019
89 1439/18 (I.A. No. 3 of 2019) RVUNL Interim tariff for CTPP Unit 5 and 6 for FY 2019-20 01/05/2019
90 1334/18 RVUNL Determination of final Capital cost and ARR for FY 2013-14 to FY 2018-19 for Chhabra Thermal Power Project Unit-3 and 4 08/03/2019
91 - Suo-Motu Determination of generic tariff Biomass based power plants for FY 2018-19 08/03/2019
92 1404/18 Ajmer Vidyut Vitran Nigam Ltd. Determination of pooled cost of power purchase for FY 2018-19 08/03/2019
93 1414/18 Jaipur Vidyut Vitran Nigam Ltd. Determination of pooled cost of power purchase for FY 2018-19 08/03/2019
94 1365/18 Sh. B.M. Sanadhya Review of Commission’s order dated 28.05.2018 07/03/2019
95 1402/18 Jodhpur Vidyut Vitran Nigam Ltd. Determination of pooled cost of power purchase for FY 2018-19 22/02/2019
96 1340/18 RVUNL Approval of final capital cost and ARR and Tariff for FY 2013-14 to FY 2018-19 for RGTPP Stage III (160 MW) 31/01/2019
97 1352/18 RVPN Review of Commission’s order dated 03.05.2018 24/01/2019
98 1439/18 RVUNL Determination of ARR and Provisional Tariff for FY 2018-19 for CSTPS Stage II (unit 5 and 6) 04/01/2019
99 1361/18 JVVNL Review of Commissions order dt. 28.05.2018 12/10/2018
100 1364/18 JVVNL Approval of Additional Investment Plan for FY 2018-19 05/10/2018
101 1357/18 RVUN Review of Commission’s Order dt. 18.05.2018 26/09/2018
102 1359/18 GLPL Review of Commission’s Order dt. 28.05.2018 26/09/2018
103 1285/17 1286/17 RWPL BLMCL I.A. No. 7 and 8 26/09/2018
104 1310/18 GLPL Determination of ARR and Tariff for FY 2018-19 and true up for FY 2014-15 to FY 2016-17 for GLTPP Units 1 and 2 28/05/2018
105 1294/17 1295/17 1296/17 Discoms Approval of ARR and Tariff for FY 18-19 28/05/2018
106 1291/17 1292/17 1293/17 Discoms Approval of true up of ARR for FY 2016-17 28/05/2018
107 1288/17 1289/17 1290/17 Discoms Approval of Investment Plan for FY 2018-19 28/05/2018
108 1195/17 1221/17 M/s Jindal Urban Waste Management Ltd. Determination of project specific tariff for Municipal Solid Waste to Energy plants. 18/05/2018
109 1316/18 RVUN Determination of ARR and tariff for FY 2018-19 and approval of True-up of ARR for FY 2016-17 18/05/2018
110 967/16 RWPL Determination of ARR and tariff for FY 2017-18. 18/05/2018
111 1285/17 1286/17 RWPL BLMCL Interim tariff for FY 2018-19 10/05/2018
112 1316/18 RVUN Interim tariff for FY 2018-19 03/05/2018
113 1310/18 GLPL Interim tariff for FY 2018-19 03/05/2018
114 1284/17 1309/17 RVPN Approval of Investment Plan and determination of ARR and tariff for recovery of Transmission and SLDC Charges for FY 2018-19 and True up of ARR for FY 2016-17 of RVPN. 03/05/2018
115 I.A. 09 of 2017 in 966/16 BLMCL Application seeking amendment in petition 966/16 filed for determination of transfer price of lignite from Kapurdi mine for FY 2017-18 05/04/2018
116 1080/17 GLPL Approval of truing up of Unit 1 from FY 2011-12 to FY 2013-14 and of Unit 2 from FY 2010-11 to FY 2013-14 and ARR and Tariff Determination for Unit-1and 2 for FY 2017-18 04/04/2018
117 1105/17 RVUN determination of provisional Capital Cost, Aggregate Revenue Requirement and provisional Tariff for Unit 5(1x660 MW) of Chhabra Thermal Power Project (2x660 MW) Stage-II for FY 2017-18 04/04/2018
118 1100/17 M/s Rajasthan State Ganganagar Sugar Mills Ltd Determination of tariff for Baggase based co-generation power plant. 25/01/2018
119 1287/17 JVVNL Determination of pooled cost of power purchase for FY 2017-18 24/01/2018
120 1273/17 AVVNL Determination of pooled cost of power purchase for FY 2017-18 24/01/2018
121 1272/17 JdVVNL Determination of pooled cost of power purchase for FY 2017-18 24/01/2018
122 - Suo-Motu determination of generic tariff for biomass, biogas and biomass gasifier based power plants 28/11/2017
123 1076/17, 1077/17 and 1078/17 JVVNL, AVVNL and JdVVNL Approval of ARR and Tariff Petitions for FY 2016-17 and 2017-18 02/11/2017
124 - Suo-Motu Determination of benchmark capital cost for Solar PV and Thermal power projects applicable during FY 2017-18 and generic levelisied tariff 09/10/2017
125 986,987,990,991,999,1000/17 JVVNL, AVVNL, JdVVNL True-up of ARR for FY 2014-15 and 2015-16 05/10/2017
126 992-993, 988-989, 1001-1002/16 JVVNL, AVVNL and JdVVNL Approval of Investment Plan for FY 2016-17 and 2017-18 06/09/2017
127 1222/17 RWPL Review of Commission’s Order dated 19.06.2017 04/09/2017
128 - Suo-Motu Generic tariff for sale of electricity from wind power plants getting commissioned during FY 2017-18 10/07/2017
129 1035/17 RVUN Determination of ARR and tariff For FY 2017-18 and approval of True-up of ARR for FY 2014-15 and 2015-16 20/06/2017
130 816/16 RWPL Determination of ARR and Tariff for FY 2014-15, FY 2015-16 and FY 2016-17 19/06/2017
131 1059/17 and 1079/17 RVPN Approval of Investment Plan and determination of ARR and tariff for FY 2017-18 and True up of ARR for FY 2015-16 26/05/2017
132 1106/17 JVVNL Determination of pooled cost of power purchase for FY 2016-17 17/05/2017
133 1060/17 JdVVNL Determination of pooled cost of power purchase for FY 2016-17 17/05/2017
134 1082/17 AVVNL Determination of pooled cost of power purchase for FY 2016-17 17/05/2017
135 966/16 967/16 RWPL BLMCL Interim tariff for FY 2017-18 27/04/2017
136 1035/17 RVUN Interim tariff for FY 2017-18 07/04/2017
137 1079/17 RVPN Interim tariff for FY 2017-18 07/04/2017
138 1080/17 GLPL Interim tariff for FY 2017-18 07/04/2017
139 593/16 (IA No. 2) BLMCL Seeking approval for award of work of developing and operating Kapurdi and Jalipa Mine to the lowest qualified bidder for selection of MDO 06/04/2017
140 876/16 M/s Rajasthan Textile Mills Association Review of Commission order dt. 24.08.2016 02/03/2017
141 959/16 RVUN Review of Commission’s order dt. 17.10.16 09/12/2016
142 760/16 GLPL ARR and Tariff for FY 2014-15, FY 2015-16 and FY 2016-17 for GLPL Unit 1 and 2. 07/12/2016
143 817/16 Discoms Determination of Cross Subsidy Surcharge for FY 2016-17 01/12/2016
144 590/16 592/16 RVPN Approval of Investment Plan, determination of ARR and tariff for FY 2016-17 and True up of ARR for FY 2014-15 27/10/2016
145 594/16 RVUN Tariff for FY16-17 and true up for FY13-14 17/10/2016
146 552/15,553/15, 554/15 JVVNL, AVVNL, Jd. VVNL Annual Revenue Requirement (ARR) Retail Supply Tariff of Discoms for FY 2015-16 and approval of true-up of ARR for FY 2013-14 and Investment Plan for FY 2015-16 22/09/2016
147 548/15 Discoms Determination of Additional Surcharge 24/08/2016
148 - Suo-Motu Determination of generic tariff for Biomass for FY 2016-17 23/08/2016
149 - Suo-Motu Determination of generic tariff for Solar for FY 2016-17 23/08/2016
150 701/16 RVUN Review of Tariff order dated 07.09.2015 08/08/2016
151 445/14 486/14 652/16 RWPL Determination of Tariff 04/08/2016
152 492/14 595/15 GLPL Tariff for FY 15-16 and 16-17 14/07/2016
153 245/11 BLMCL Determination of transfer price 29/06/2016
154 648/16 RVPN Adoption of tariff of 400 kV D/C Suratgarh-Bikaner Transmission Line Project through PPP mode availing VGF. 21/06/2016
155 - Suo-Motu Generic tariff of Wind Power Plants for FY 2016-17. 25/05/2016
156 244/11 383/13 and 423/13 RWPL Determination of tariff 19/05/2016
157 312/12 341/12 424/13 446/14 and 487/14 BLMCL Determination of transfer price 19/05/2016
158 548/15 Discoms Determination of Additional Surcharge 12/05/2016
159 625/16 and 626/16 JdVVNL Determination of pooled cost of power purchase for FY 2014-15 and 2015-16 01/04/2016
160 592/16 RVPN Interim tariff FY 2016-17 31/03/2016
161 594/16 RVUN Interim tariff FY 2016-17 31/03/2016
162 595/16 GLPL Interim tariff FY 2016-17 31/03/2016
163 584/15 AVVNL Determination of pooled cost of power purchase for FY 2014-15 and 2015-16 31/03/2016
164 606/16 and 607/16 JVVNL Determination of pooled cost of power purchase for FY 2014-15 and 2015-16 31/03/2016
165 593/16 652/16 RWPL BLMCL Adhoc tariff and transfer price for FY 2016 -17 31/03/2016
166 464/14 M/s Raj West Power Ltd. Determination of Final Tariff for FY 2009-10 to FY 2013-14 for Units 1 to 8 and true up for FY 2009-10 and FY 2010-11. 24/02/2016
167 486/14 487/14 RWPL BLMCL Adhoc tariff and transfer price for FY 2015 -16 25/01/2016
168 579/15 RVUN Provisional Tariff for Unit-2 KaTPP 21/01/2016
169 537/15 RVUN Determination of Capital Cost, ARR and Provisional Tariff for Unit 4 of CTPP for FY 2014-15 01/01/2016
170 - Suo-Motu Determination of Biomass fuel price for FY 2015-16 09/09/2015
171 491/14 RVUN Determination of ARR and tariff For FY 2015-16 and approval of True-up of ARR for FY 2012-13 07/09/2015
172 488/14 499/14 RVPN Investment Plan FY16, Tariff for FY16 and True up for FY13-14 14/08/2015
173 481/14 RVUN Determination of ARR and Tariff for Giral Unit-2 for FY 2010-11 (20 days) to 2013-14 12/08/2015
174 483/14 GLPL Determination of ARR and Tariff of Giral Unit-1 for FY 2011-12 to FY 2013-14 12/08/2015
175 - Suo-Motu Generic tariff for Biomass based power plants for FY 2015-16 08/07/2015
176 537/15 RVUN Interim tariff for CTPP Unit-4 for FY 2014-15 and FY 2015-16 24/06/2015
177 486/14 487/14 RWPL BLMCL I.A. No. 2 modification of the interim tariff 19/06/2015
178 - Suo-Motu Determination of generic tariff for Solar Power Projects for FY 2015-16 19/06/2015
179 452/14 RVUN determination of ARR and provisional Tariff for FY 2014-15 for RGTPP Stage III 18/06/2015
180 451/14 RVUN determination of ARR and provisional Tariff for FY 2013-14 for RGTPP Stage III (1X110 MW GT) 17/06/2015
181 - Suo-Motu Determination of generic tariff for Wind Power Plants for FY 2015-16 29/05/2015
182 450/14 RVUN Determination of ARR and Provisional Tariff for Unit # 3 of CTPP for FY 2013-14 22/05/2015
183 462/14 RVUN determination of ARR and provisional Tariff for FY 2014-15 for Kalisindh Unit-1 14/05/2015
184 - Suo-Motu Interim Tariff of Biomass plants for FY15-16 05/05/2015
185 486/14 487/14 RWPL BLMCL Interim tariff for FY 2015-16 31/03/2015
186 491/14 RVUN Interim tariff for FY 15-16 31/03/2015
187 492/14 GLPL Interim tariff for FY 15-16 31/03/2015
188 499/14 RVPN Interim tariff for FY 2015-16 31/03/2015
189 456 457 458 442 444 447/14 JVVNL AVVNL Jd VVNL Retail Supply Tariff ARR and Investment Plan of Discoms for FY 2014-15 20/02/2015
190 479/14 RVUN Review of Order dated 09.10.2014 21/01/2015
191 470/14 RVUN Modification in original scope of works of Additional Capitalization for KTPS 13/11/2014
192 460/14 GLPL determination of ARR and provisional tariff for Giral Unit-I for FY 2014-15 12/11/2014
193 453/14 RVPN Review of order dt. 09.01.14 31/10/2014
194 459/14 RVUN Tariff for FY15 and True up for FY12 09/10/2014
195 437/14 463/14 RVPN Investment Plan FY15, Tariff for FY15 and True up for FY12, FY13 09/10/2014
196 244/11 RWPL Tariff for FY12 (23 days) 18/09/2014
197 - Suo-motu Generic tariff for Solar PV and Solar thermal power projects for FY 2014-15 22/08/2014
198 448/14 RVUN Review of Commission’s Order dated 24.2.2014 20/08/2014
199 - Suo-Motu Generic tariff for Biomass Power Plants for FY15 23/07/2014
200 382/13 RVUN True up for FY11 23/07/2014
201 35312 GLPL Provisional determination of tariff for Giral Unit-I for FY 2013-14 22/07/2014
202 352/12 RVUN determination of tariff for FY 2013-14 for GLPL Unit-II 21/07/2014
203 427/13 JdVVNL Pooled cost of power purchase for FY 13 21/07/2014
204 432/13 JVVNL Pooled power purchase cost for FY 14 21/07/2014
205 439/14 JdVVNL Pooled power purchase cost for FY 14 21/07/2014
206 - Suo-Motu Generic tariff for Wind Power Plants for FY15 16/07/2014
207 391/13 406/13 JVVNL True-up of ARR for FY 11 and FY 12 15/07/2014
208 394/13 AVVNL True-up of ARR for FY 11 and FY 12 15/07/2014
209 389/13 397/13 JdVVNL True-up of ARR for FY 11 and FY 12 15/07/2014
210 450/14 452/14 462/14 RVUN Interim tariff for FY 15 for Chhabra Unit-I, RGTPP (1X160MW) and Kalisindh Unit-I 04/07/2014
211 463/14 RVPN Interim tariff FY 15 25/06/2014
212 459/14 460/14 RVUN, GLPL Interim tariff FY 15 25/06/2014
213 445/14 446/14 RWPL BLMCL Interim tariff for FY15 30/05/2014
214 426/13 AVVNL Pooled power purchase cost for FY 14 29/04/2014
215 - Suo-Motu Interim tariff for FY15 31/03/2014
216 252/11 331/12 GLPL Tariff for GLPL Unit-I for FY 12 and FY 13 24/02/2014
217 352/12 RVUN Tariff for FY14 24/02/2014
218 257/11 323/12 RVUN Tariff for GLPL Unit-II for FY 11 FY 12 and FY 13 24/02/2014
219 456/14 457/14 458/14 442/14 444/14 447/14 Discoms Determination of ARR and Retail Supply Tariff of Discoms for FY 2014-15 along with true-up of ARR for FY 2012-13 and Approval of Investment Plan for FY 2014-15. 20/02/2014
220 374/13, 387/13, 390/13 JVVNL, AVVNL, JdVVNL Approval of Investment Plan for FY 2013-14 12/02/2014
221 428/13 JdVVNL determination of provisional pooled cost of power purchase for FY 2013-14. 12/02/2014
222 420/13 Discoms Determination of Addl. Surcharge 23/01/2014
223 429/13 RVPN Adoption of tariff, for lignite based Gurha Thermal Power Plant (70MW) 22/01/2014
224 373/13 RVPN Tariff for FY14 09/01/2014
225 353/12 GLPL CoD Order for Giral Unit 1 23/12/2013
226 352/12 RVUNL CoD Order for Giral Unit 2 23/12/2013
227 370/13 RVPN Investment Plan for FY14 11/12/2013
228 413/13 RVUN Review of order 06.06.13 10/12/2013
229 395/13 JdVVNL Pooled power purchase cost FY12 10/12/2013
230 271/11, 304/12 JVVNL True up of FY09 , FY10 04/12/2013
231 262/11 AVVNL True up of FY08,FY09,FY10 04/12/2013
232 269/11,274/11 JdVVNL True up of FY09, FY10 04/12/2013
233 423/13, 424/13 Raj WestPower and BLMCL Adhoc Tariff and transfer price for FY14 11/10/2013
234 - Suo-Motu Generic Tariff for Biomass Power Projects 08/10/2013
235 - Suo-Motu Generic Tariff for Solar Power Projects 04/09/2013
236 311, 312, 349, 341/12 Raj WestPower and BLMCL Provisional Tariff and transfer price for FY12-13 30/08/2013
237 352/12 RVUN Adhoc tariff for FY 14 01/07/2013
238 311,312, 340 341/12(IA) Raj WestPower and BLMCL Interim tariff and transfer price for FY14 28/06/2013
239 353/12 GLPL Interim tariff for FY14 28/06/2013
240 356,357 and 358/12 JVVNL, AVVNL Jd VVNL Retail Supply Tariff for FY 2013-2014 06/06/2013
241 285/11,314/12 RVUN Tariff for RVUN power stations for FY13 06/06/2013
242 - Suo-Motu Tariff for wind power plants for FY13-14 17/05/2013
243 311,312, 340 341/12(IA) Raj WestPower and BLMCL Interim tariff and transfer price for FY14 04/04/2013
244 352/12 RVUN Adhoc tariff for FY 14 04/04/2013
245 373/13 RVPN Adhoc transmission tariff for FY 14 02/04/2013
246 335,336,338/12 Discoms pooled cost of power purchase for FY -13 11/01/2013
247 277/11, 315/12 RVPN Transmission Tariff for FY13 and true up for FY10 , FY11 10/01/2013
248 342/12 Sh. D.P. Chirania Review of order dt 08.08.12 24/12/2012
249 - Suo - Motu Generic Levellised Tariff for Biomass Power Plants FY-13 21/12/2012
250 - Suo - Motu Clarification of order 8.8.12 21/11/2012
251 316/12 Discoms Introduction of Time of Day Tariff 08/11/2012
252 283/11 RVUN Addl. Capitalization of STPS 31/10/2012
253 311,312, 340 341/12(IA) Raj WestPower and BLMCL Interim tariff and transfer price 15/10/2012
254 - Suo- Motu Generic Levellised Tariff for wind Power Plants FY-13 07/09/2012
255 278/11 279/11 and 280/11 JVVNL AVVNL and Jd VVNL Retail Tariff for FY-12-13 08/08/2012
256 250/11 RVPN Corrigendum-Approval of ARR and tariff for FY 2011-12 07/08/2012
257 331/12 GLPL Interim tariff for Giral Unit -I 17/07/2012
258 255/11 and 256/11 ATSCL and MTSCL Adoption of Transmission Charges 01/06/2012
259 323/12 RVUN Interim tariff for Giral Unit -II 31/05/2012
260 - Suo- Motu Generic Levellised Tariff for Solar Power Plants 30/05/2012
261 258/11 RVUN Review of order dt. 27.04.11 for true-up 10/05/2012
262 314/12 RVUN Interim tariff for Chhabra TPS 03/04/2012
263 311/12 and 312/12 Raj WestPower Ltd. and BLMCL Interim tariff and transfer price 02/04/2012
264 285/11 RVUN Interim tariff 30/03/2012
265 315/12 RVPN Interim transmission tariff 30/03/2012
266 250/11 RVPN Approval of ARR and tariff for FY 2011-12 23/12/2011
267 - Suo- Motu Revised Tariff for Wind Plants FY-11,FY-12 14/12/2011
268 213/10 RVPN Corrigendum of Tariff order FY-11 09/12/2011
269 - Suo- Motu Revised Tariff for Bio mass-09-10 09/12/2011
270 - Suo- Motu Revised Tariff for Bio mass-10-11 09/12/2011
271 - Suo- Motu Revised Tariff for Bio mass-11-12 09/12/2011
272 237/10 RVUN Tariff for RVUN stations for FY12 30/11/2011
273 259/11, 261/11 and 266/11 AVVNL , JVVNL and Jd. VVNL pooled cost of power purchase for FY -12 02/11/2011
274 244/11 Rajwest Power Ltd Determination provisional tariff for unit 3,4 21/10/2011
275 244/11 and 245/11 Rajwest Power Ltd. and Barmer Lignite Mining Ltd. Determination provisional tariff and transfer price 30/09/2011
276 238,239and 240/10 JVVNL, AVVNL, Jd VVNL ARR and Tariff for FY12 08/09/2011
277 244/11 and 245/11 Rajwest Power Ltd. and Barmer Lignite Mining Ltd. Determination provisional tariff and transfer price 17/08/2011
278 242/11 Rajasthan Renewable Energy Corporation Tariff for 1 MW solar power plant 17/08/2011
279 215/10 RVUN Tariff for Chhabra TPS Unit-I for FY 11 and FY 12 13/06/2011
280 212/10 RVUN Truing up of RVUN power stations for FY05-08 27/04/2011
281 - Sou-motu Wheeling charges and Surcharge-FY12 31/03/2011
282 209/09 RVUN Tariff for RVUN stations for FY11 16/11/2010
283 - Suo-Motu Amendment in Generic tariff for Solar Power Plants 29/09/2010
284 213/10 RVPN Transmission Tariff for FY11 16/09/2010
285 217/10 RVPN Adoption of tariff in case I bid 31/05/2010
286 207/10 RVUN Tariff for KTPS(VII) & STPS (VI) Units 27/05/2010
287 - Suo-motu Generic tariff for Solar Power Plants  25/05/2010
288 210/09 M/s Raj westpower Review of order dt. 13.11.09 17/05/2010
289 180/09 M/s JdVVNL Multi Year-ARR- FY10-14 & Truing UP FY08 15/04/2010
290 181/09 M/s JVVNL Multi Year-ARR- FY10-14 & Truing UP FY09 15/04/2010
291 185/09 M/s AVVNL Multi Year-ARR- FY10-14 & Truing UP FY10 15/04/2010
292 - RVPN Interim tariff for FY11 31/03/2010
293 - Suo-motu Wheeling charges Surcharge-FY11 31/03/2010
294 - Suo-motu Determination of tariff for Bio-mass plantsfor FY11 31/03/2010
295 - Suo-motu Determination of tariff for wind for FY11 31/03/2010
296 209/09 RVUN Intrim tariff for FY11 31/03/2010
297 215/10 RVUN Provisional Tariff for Chhabra TPS (U-I) 11/03/2010
298 206/09 RVUN Review of tariff order dated 31.8.09 21/01/2010
299 207/09(IA) RVUN Intrim Tariff for KTPS(U-6) & STPS (U-7) 16/12/2009
300 184/09 M/s Raj WestPower Ltd. Provisional Tariff for first two units of 135 MW each of Raj WestPower Limited 13/11/2009
301 179/09 M/s RVUN  Multi Year-ARR- FY10-14 & Tariff FY-10 31/08/2009
302 184/09 (IA) M/s Raj West Power Ltd. Tariff for infirm power 28/08/2009
303 - Suo-motto Tariff  for biomass power plants 17/08/2009
304 201/09 M/s RVPN Ltd. Approval of deviation in bidding guidelines 11/08/2009
305 186/09 M/s RVPN Ltd. Multi Year-ARR- FY10-14 and Tariff FY-10 01/08/2009
306 167/08 M/s RVPN Ltd. Truing up of ARR for FY-05, FY-06 and FY-07 01/08/2009
307 - Suo-motto Tariff for wind power Plants 16/07/2009
308 - Suo-motto  Wheeling charges & Surcharge-FY10 31/03/2009
309 186/09(IA) M/s RVPN Ltd. Intrim Tariff for  FY-10 30/03/2009
310 179/09 (IA) M/s RVUN  Intrim Tariff for  FY-10 30/03/2009
311 129,137,139,140,141,142/07 M/s JVVNL M/s JdVVNL M/s AVVNL Truing up of ARR for FY-06,07 and Correction of ARR for FY-09 of Discoms 11/09/2008
312 129,137,139,140,141,142/07 M/s JVVNL M/s JdVVNL M/s AVVNL Truing up of ARR for FY-06 and 07 and Correction of ARR for FY-09 of Discoms 11/09/2008
313 165/08 M/s RVUN  Tariff  for FY09 28/06/2008
314 - Suo-motto Tariff of Inadvertant Power fom CPP 16/04/2008
315 - Suo-motto Tariff for Solar Power Plants covered under GoI Policy 02/04/2008
316 143/07 M/s RVPN Ltd.  ARR for  FY-09 31/03/2008
317 165/08 (IA) M/s RVUN  Intrim Tariff for  FY-09 29/03/2008
318 130/07 Suo-motto Rationalization of Retail Tariffs for Vitran Nigams in Rajasthan 31/08/2007
319 - Suo-motto  Wheeling charges and Surcharge-FY-08 22/08/2007
320 121/07 M/s JVVNL MY ARR FY 09 of Jaipur, Ajmer and Jodhpur 31/03/2007
321 120/07 M/s AVVNL MY ARR FY 09 of Jaipur, Ajmer and Jodhpur 31/03/2007
322 119/07 M/s JdVVNL MY ARR FY 09 of Jaipur, Ajmer and Jodhpur 31/03/2007
323 118/07 M/s RVUN  Tariff for new generation projects of RVUN 21/03/2007
324 - Sou-motu Review of Tarriff for wind and biomass projects 14/03/2007
325 - Suo-motto Tarriff for wind and biomass projects 09/03/2007
326 112 & 117/ 06 M/s RVPN Ltd. Multi Year-ARR  & Tariff FY-07-09 07/03/2007
327 115/06 Suo-motto Multi Year-ARR  and Tariff FY-07-09 for RVUN 12/01/2007
328 107/06 Suo-motto Truing up orders of JVVNL, AVVNL, JdVVNL from FY01- 05 09/01/2007
329 108/06 Suo-motto Truing up orders of JVVNL, AVVNL, JdVVNL from FY01- 05 09/01/2007
330 109/06 Suo-motto Truing up orders of JVVNL, AVVNL, JdVVNL from FY01- 05 09/01/2007
331 105/06 M/s Hindustan Zinc Limited Tariff of power from CPP at Chanderiya  FY-07 28/11/2006
332 46/05, 47/05, 51/05 JdVVNL, AVVNL , JVVNL Determination of tariff for deemed licensees 23/11/2006
333  110/06 M/s RajWest Power Corrigendum to Raj West Power 26/10/2006
334  110/06 M/s RajWest Power In principle determination of Capital Cost, Transfer price of Lignite and Cost of generation from 1000 MW lignite based thermal power plant 19/10/2006
335 84/06 JdVVNL Wheeling Surcharge 07 19/09/2006
336 85/06 JVVNL Wheeling Surcharge 07 19/09/2006
337 86/06 AVVNL Wheeling Surcharge 07 19/09/2006
338 71/05 M/s Jd VVNL ARR for FY-07 21/07/2006
339 70/05 M/s A VVNL ARR for FY-07 21/07/2006
340 72/05 M/s J VVNL ARR for FY-07 21/07/2006
341 88/06 M/s RVUN  Tariff for generation Stations of RVUN for FY-07 17/07/2006
342 60/05 M/s RVPN Ltd. Tariff for Transmission & SLDC FY-07 31/03/2006
343 __ M/s JdVVNL ARR-06 22/09/2005
344 __ M/s AVVNL ARR-06 22/09/2005
345 __ M/s JdVVNL ARR-06 22/09/2005
346 __ M/s JVVNL ARR-06 17/09/2005
347 44/05 M/s RVUNL Tariff for generation Stations  FY-06 09/06/2005
348 43/05 M/s RVPNL Tariff for transmission of electricity and SLDC charges for FY-06 02/05/2005
349 40/04 M/s JVVNL Wheeling Charges and Surcharge FY-06 21/02/2005
350 42/0 M/s JdVVNL Wheeling Charges and Surcharge FY-06 21/02/2005
351 41/04 M/s AVVNL Wheeling Charges and Surcharge FY-06 21/02/2005
352 40/04 M/s JVVNL Wheeling Charges and Surcharge FY-06 21/02/2005
353 42/0 M/s JdVVNL Wheeling Charges and Surcharge FY-06 21/02/2005
354 41/04 M/s AVVNL Wheeling Charges and Surcharge FY-06 21/02/2005
355 36/04 M/s AVVNL Tariff for Fy -05 17/12/2004
356 37/04 M/s JdVVNL Tariff for Fy -05 17/12/2004
357 35/04 M/s JVVNL Tariff for Fy -05 17/12/2004
358 31/04 M/s RVUNL Tariff for generation Stations  FY-05 07/10/2004
359 31/04 M/s RVUNL Tariff for generation Stations  FY-05 07/10/2004
360 26/03 M/s RVPNL ARR and Tariff for transmission of electricity and SLDC charges for FY-05 17/04/2004
361 - M/s JVVNL ARR for FY-04 and 05 17/04/2004
362 - M/s JdVVNL ARR for FY-04 and 05 17/04/2004
363 - M/s RVPNL ARR for FY-04 31/07/2003
364 - M/s JVVNL ARR for FY-04 10/06/2003
365 - M/s AVVNL ARR for FY-04 10/06/2003
366 - M/s JdVVNL ARR for FY-04 10/06/2003
367 13/02 M/s RIICO and Jaipur Nagar Nigam Review of tariff of PSL as per order dt. 24.3.02 04/05/2002
368 11/02 M/s RIICO and Jaipur Nagar Nigam Review of tariff of PSL as per order dt. 24.3.01 04/05/2002
369 12/02 DRM (Electrical) Western Railway, Jaipur Review of tariff orde dt. 24.3.01 01/04/2002
370 09/01 M/s Rajasthan Ginning and Pressing Industries Association, Sriganganagar Review of tariff orde dt. 24.3.01 10/10/2001
371 05/00 M/s  AVVNL Tariff for retail supply of electricity FY-01 24/03/2001
372 07/00 M/s  JdVVNL Tariff for retail supply of electricity FY-01 24/03/2001
373 08/00 M/s RVPNL Tariff for transmission of electricity FY-01 24/03/2001
374 06/00 M/s  JVVNL Tariff for retail supply of electricity FY-01 24/03/2001