1
|
2248/2024
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.
|
In the matter of Review of the Commissions Order dated 23.07.2024 passed in Petition No. 2193/24
|
18/11/2024
|
|
2
|
2238/2024
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Petition for In-principle approval before incurring the additional capital expenditure under the Colony head, within the original scope of work after the cut-off date for SSCTPP Unit 7 and 8
|
30/10/2024
|
|
3
|
2261/2024
|
Discoms
|
Petition for approval of pre-fixed Levelized Tariff for solar power capacity of 1,000 MW available for implementation under component-A of PM-KUSUM scheme in Rajasthan Discoms.
|
28/10/2024
|
|
4
|
2242/2024
|
Ajmer Vidyut Vitran Nigam Limited
|
Petition for approval of levelized tariff discovered through Transparent Competitive Bidding carried out by AVVNL for Solar Power Projects under Component-C (Feeder Level Solarization) of PM-KUSUM Scheme under TN-DSM-11 to 14.
|
26/07/2024
|
|
5
|
2241/2024
|
Jaipur Vidyut Vitran Nigam Limited.
|
Petition for approval of levelized tariff discovered through transparent competitive bidding carried out by JVVNL for solar power projects with aggregate capacity of 116.33 MW under Component-C (Feeder Level Solarization) of PM-KUSUM Scheme vide TN-06, TN-09 and TN-10.
|
26/07/2024
|
|
6
|
2192/2024
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.
|
In the matter of approval of Investment Plan for Rajasthan Rajya Vidyut Prasaran Nigam Limited and SLDC for the FY 2024-25.
|
26/07/2024
|
|
7
|
2206/2024, 2207/2024, 2208/2024, 2236/2024
|
Discoms
|
In the matter of approval of True up for FY 2022-23 and Aggregate Revenue Requirement, Tariff and Investment Plan for FY 2024-25 of Discoms and Petition for approval of recovery of Fuel Surcharge over and above ceiling limit
|
26/07/2024
|
|
8
|
2183/2023
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd
|
Truing up of ARR of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2024-25
|
23/07/2024
|
|
9
|
2193/2024
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.
|
In the matter of approval of true up for FY 2022-23 and Annual Revenue requirement and Tariff for FY 2024-25 of RVPN
|
23/07/2024
|
|
10
|
2196/2024
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
In the matter of Annual Performance Review (APR) for FY 2020-21 to FY 2022-23 and Determination of Annual Revenue Requirement (ARR) and Tariff for FY 2024-25 for Suratgarh Super Critical Thermal Power Plant (SSCTPP) (Units 7 and 8) of RVUN
|
22/07/2024
|
|
11
|
2182/2023
|
Rajasthan State Load Despatch Centre of RVPN.
|
In the matter of approval of true up for FY 2022-23 and Annual Revenue requirement and SLDC Charges for FY 2024-25 of State Load Despatch Centre
|
19/07/2024
|
|
12
|
2223/2024
|
Jaipur Vidyut Vitran Nigam Limited
|
Petition for approval of levelized tariff discovered through transparent competitive bidding carried out by JVVNL for solar power projects with aggregate capacity of 316.47 MW under Component-C (Feeder Level Solarization) of PM-KUSUM Scheme
|
04/06/2024
|
|
13
|
2233/2024
|
Jodhpur Vidyut Vitran Nigam Limited.
|
Review Petition filed under Section 94(1)(f) of the Electricity Act, 2003 for Review read with Regulation of RERC (Transaction Of Business) Regulations, 2021 for review in the Order dated 01.05.2024.
|
04/06/2024
|
|
14
|
2219/2024
|
Ajmer Vidyut Vitran Nigam Ltd
|
Petition filed under section 63 (Determination of Tariff by Bidding Process) of the Electricity Act 2003, read with Regulation 19 and 21 Of RERC (Transaction of Business), Regulations, 2021, for approval of Levelized Tariff Discovered through Transparent Competitive Bidding carried out by AVVNL For solar power projects under Component-C (Feeder Level Solarization) of PM-KUSUM Scheme Under TN-DSM-07
|
31/05/2024
|
|
15
|
2213/2024
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Petition for adoption of Tariff for 900 MW Solar Power Project
|
15/05/2024
|
|
16
|
2226/2024
|
Jodhpur Vidyut Vitran Nigam Ltd.
|
Petition for approval of the levelized tariff of 1111 nos. of Solar PV plants with total aggregated capacity of 2929.8 MW of Solar PV Plant for period of 25 years under Component C (feeder level solarization) of PM-KUSUM scheme
|
01/05/2024
|
|
17
|
2209/2024
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd
|
Petition for Adoption of Tariff discovered through tariff-based competitive bidding under Scheme for flexibility in Generation and Scheduling of Thermal/ Hydro Power Stations through bundling with RE for setting up of 810 MW Intra State connected Solar PV Power projects in Rajasthan.
|
01/05/2024
|
|
18
|
2121/2023, 2129/2023, 2176/2023, 2174/2023, 2175/2023 and 2178/2023
|
Discoms
|
Petitions for review of Commissions Order dated 14.07.2022 and 31.03.2023.
|
18/04/2024
|
|
19
|
608/2016 and 609/2016
|
M/s Barmer Lignite Mining Company Limited
|
In the matter of proceedings under section 142 of the Electricity Act 2003 for noncompliance of the order of the Commission dated 21.04.2023 and also to decide the mode to proceed further for deciding the transfer price of lignite.
|
06/03/2024
|
|
20
|
2191/2024
|
Suo motu
|
In the matter of Determination of generic tariff for sale of electricity to Distribution Licensee from Biomass, Biogas and Biomass Gasifier based power plants getting commissioned in the State during FY 2023-24 and FY 2024-25
|
13/02/2024
|
|
21
|
2195/2024
|
Ajmer Vidyut Vitran Nigam Ltd
|
PETITION FILED UNDER SECTION 63 (DETERMINATION OF TARIFF BY BIDDING PROCESS) OF THE ELECTRICITY ACT 2003, READ WITH REGULATION 19 AND 21 OF RERC (TRANSACTION OF BUSINESS), REGULATIONS, 2021, FOR APPROVAL OF LEVELIZED TARIFF DISCOVERED THROUGH TRANSPARENT COMPETITIVE BIDDING CARRIED OUT BY AVVNL FOR SOLAR POWER PROJECTS UNDER COMPONENT-C(FEEDER LEVEL SOLARIZATION) OF PM-KUSUM SCHEME UNDER TN-DSM-06
|
06/02/2024
|
|
22
|
2170/2023
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
In the matter of Petition filed by Rajasthan Rajya Vidyut Utpadan Nigam Ltd. for review of Commissions Order dated 16.08.2023 passed in the Petition No. 2070/2022.
|
20/12/2023
|
|
23
|
2151/2023
|
Rajasthan Rajya Vidyut Prasaran Nigam Limited
|
In the matter of Petition filed by M/s Rajasthan Rajya Vidyut Prasaran Nigam Limited for Review of the Commissions Order dated 08.06.2023 passed in Petition No. 2075/23
|
07/12/2023
|
|
24
|
2142/2023
|
Shree Cement Ltd.
|
In the matter of Petitions filed for Review of the Commissions Order dated 08.06.2023 passed in Petition No. 2075/23.
|
06/12/2023
|
|
25
|
2148/2023
|
Hindustan Zinc Ltd.
|
In the matter of Petitions filed for Review of the Commissions Order dated 08.06.2023 passed in Petition No. 2075/23.
|
06/12/2023
|
|
26
|
2136/2023
|
Rajasthan State Load Despatch Centre of RVPN
|
In the matter of Petition filed by Rajasthan State Load Despatch Centre for Review of the Commissions Order dated 03.05.2023 passed in Petition No. 2065/22.
|
11/10/2023
|
|
27
|
2121/2023
|
Jaipur Vidyut Vitran Nigam Ltd
|
Review of Commissions Order dated 14.07.2022 passed in the Petition No. 1991/2022 in the matter of true up for FY 2020-21 of JVVNL
|
10/10/2023
|
|
28
|
2129/2023
|
Ajmer Vidyut Vitran Nigam Ltd.
|
Review of Commissions Order dated 14.07.2022 passed in the Petition No. 1993/2022 in the matter of true up for FY 2020-21 of AVVNL
|
10/10/2023
|
|
29
|
2154/2023
|
Ajmer Vidyut Vitran Nigam Limited.
|
Petition for approval of Levelized Tariff Discovered Through Transparent Competitive Bidding Carried out by AVVNL for Solar Power Projects under Component-C (Feeder Level Solarization) of PM-KUSUM Scheme.
|
21/09/2023
|
|
30
|
2155/2023
|
Jodhpur Vidyut Vitran Nigam Limited.
|
Petition for approval of Levelized Tariff Discovered Through Transparent Competitive Bidding carried out by JDVVNL for solar power projects under Component-C (Feeder Level Solarization) of PM-KUSUM Scheme
|
21/09/2023
|
|
31
|
2070/2022
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Determination of Final Capital Cost and Aggregate Revenue Requirement (ARR) and Tariff for FY 2020-21 to FY 2023-24 for Suratgarh Super Critical Thermal Power Plant (SSCTPP) (Units 7 and 8).
|
16/08/2023
|
|
32
|
2074/2023
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd
|
Approval of Investment Plan for Rajasthan Rajya Vidyut Prasaran Nigam Limited for the FY 2023 - 24
|
26/07/2023
|
|
33
|
2075/2023
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.
|
In the matter of approval of true up for FY 2021-22 and Annual Revenue requirement and Tariff for FY 2023-24
|
08/06/2023
|
|
34
|
2076/2023
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Petition for review of Commissions Order dated 02.12.2022 passed in the Petition No.2028/22 for Truing up of ARR for FY 2018-19 to FY 2020-21 for CSCTPP Units 5 and 6
|
30/05/2023
|
|
35
|
2096/2023
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.
|
Petition for Review of the Commission Order dated 01.12.2022 passed in Petition No.1978/22
|
25/05/2023
|
|
36
|
2069/2022
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Truing up of ARR of FY 2021-22 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24
|
12/05/2023
|
|
37
|
2065/2022
|
Rajasthan State Load Despatch Centre of RVPN
|
In the matter of approval of true up for FY 2021-22 and Annual Revenue requirement and SLDC Charges for FY 2023-24 of State Load Despatch Centre
|
03/05/2023
|
|
38
|
608/2016 and 609/2016
|
Barmer Lignite Mining Company Limited
|
IA No. 01- Application seeking directions for obtaining Laboratory figures of lignite, and seeking information about the actual payments made by Petitioner to the MDO towards mining expenses, besides the mining expenses incurred by the MDO (SWML) and IA No. 02- Application seeking confirmation of the principles governing determination of final transfer price of lignite in petition No. 608/2016 and 609/2016.
|
21/04/2023
|
|
39
|
2066/2022
|
Jaipur Vidyut Vitran Nigam Ltd.
|
In the matter of approval of True up for FY 2021-22 and Aggregate Revenue Requirement, Tariff and Investment Plan for FY 2023-24.
|
31/03/2023
|
|
40
|
2067/2022
|
Ajmer Vidyut Vitran Nigam Ltd.
|
In the matter of approval of True up for FY 2021-22 and Aggregate Revenue Requirement, Tariff and Investment Plan for FY 2023-24.
|
31/03/2023
|
|
41
|
2068/2022
|
Jodhpur Vidyut Vitran Nigam Ltd.
|
In the matter of approval of True up for FY 2021-22 and Aggregate Revenue Requirement, Tariff and Investment Plan for FY 2023-24.
|
31/03/2023
|
|
42
|
608/2016 and 609/2016
|
Barmer Lignite Mining Company Limited
|
Application seeking directions for listing and hearing petition Nos. 608 and 609 of 2016 along with petition no. 593 of 2016, 966 of 2016, 1285 of 2017, 1510 of 2019, 1473 and 1474 of 2019, 1584 of 2019, 1846 of 2020 and 1965 of 2021.
|
24/01/2023
|
|
43
|
2020/2022
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
In the matter of Petition filed by Rajasthan Rajya Vidyut Utpadan Nigam Ltd. for In-Principle Approval of additional capital expenditure before incurring additional capital expenditure after cut-off date for CSCTPP unit 5 and 6.
|
24/01/2023
|
|
44
|
2045/2022
|
Rajasthan Urja Vikas Nigam Ltd
|
To seek approval for procurement of 1200 MW power on long term basis i.e.25 years from solar power projects with committed power supply from Energy Storage Systems for at least six hours during the peak demand period
|
23/01/2023
|
|
45
|
2028/2022
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd
|
In the matter of Truing up of Aggregate Revenue Requirement for FY 2018-19 to FY 2020-21 for Chhabra Super Critical Thermal Power Project (CSCTPP) (Units 5 and 6)of Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
02/12/2022
|
|
46
|
1978/2022
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.
|
In the matter of approval of Investment Plan for Rajasthan Rajya Vidyut Prasaran Nigam Limited FY 2022-23.
|
01/12/2022
|
|
47
|
2032/2022
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Review of Commissions Order dated 23.06.2022 passed in the Petition No. 1985/2022 for determination of ARR and Tariff for CSCTPP unit 5and6 for FY 2022-23
|
09/11/2022
|
|
48
|
2031/2022
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Petition for review of Commissions Order dated 23.06.2022 passed in the Petition No. 1980/22 for True up for FY 2020-21 and ARR and tariff for FY 2022-23
|
09/11/2022
|
|
49
|
2041/2022
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.
|
Petition for Review of the Commissions Order dated 13.07.2022 passed in Petition No 1979/22
|
09/11/2022
|
|
50
|
2011/2022
|
Jaipur Vidyut Vitran Nigam Ltd
|
Aggregate Revenue Requirement, Tariff Petition and Investment Plan FY 2022-23
|
01/09/2022
|
|
51
|
2012/2022
|
Ajmer Vidyut Vitran Nigam Ltd.
|
Aggregate Revenue Requirement, Tariff Petition and Investment Plan FY 2022-23
|
01/09/2022
|
|
52
|
2013/2022
|
Jodhpur Vidyut Vitran Nigam Ltd.
|
Aggregate Revenue Requirement, Tariff Petition and Investment Plan FY 2022-23
|
01/09/2022
|
|
53
|
1991/2022
|
Jaipur Vidyut Vitran Nigam Ltd.
|
In the matter of approval of true up for FY 2020-21
|
14/07/2022
|
|
54
|
1993/2022
|
Ajmer Vidyut Vitran Nigam Ltd.
|
In the matter of approval of true up for FY 2020-21
|
14/07/2022
|
|
55
|
2001/2022
|
Jodhpur Vidyut Vitran Nigam Ltd.
|
In the matter of approval of true up for FY 2020-21
|
14/07/2022
|
|
56
|
1979/2022
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.
|
In the matter of approval of true up for FY 2020-21 and ARR and Tariff for FY 2022-23 of Transmission and SLDC
|
13/07/2022
|
|
57
|
1980/2022
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Determination of ARR for FY 2022-23 and true up for FY 2020-21
|
23/06/2022
|
|
58
|
1985/2022
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Determination of ARR and Tariff for FY 2022-23 for Chhabra Super Critical Thermal Power Project (CSCTPP) (Units 5 and 6)
|
23/06/2022
|
|
59
|
2014/2022
|
Suo Motu
|
Generic Tariff for Biomass, Biogas and Biomass Gasifier based power plants getting commissioned in the State during FY 2022-23
|
06/06/2022
|
|
60
|
1988/2022
|
Rajasthan Rajya Vidyut Prasaran Nigam Limited
|
Petition for review of Commissions Order dated 23.12.2021
|
24/05/2022
|
|
61
|
1972/2021
|
Rajasthan Rajya Vidyut Prasaran Nigam Limited
|
Petition for Review of the Commissions Order dated 22.11.2021
|
24/05/2022
|
|
62
|
1928/2021, 1940/2021, 1974/2021, 1955/2021, 1942/2021, 1975/2021
|
Discoms
|
Petition for review of order dated 27.01.2021 and 07.09.2021 for true-up of 18-19 and 19-20
|
24/05/2022
|
|
63
|
1990/2022
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Petition for review of Order dated 28.12.2021 issued by the Commission
|
23/05/2022
|
|
64
|
1981/2022
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Petition filed for Aggregate Revenue Requirement (ARR) and Tariff for FY 2022-23 for DCCPP (330MW)
|
28/04/2022
|
|
65
|
2009/2022
|
Suo Motu
|
Direction issued by the State Government u/s 108(1) of Electricity Act, 2003 with regard to consider the tariff for Tourism and Hospitality Sector in Industrial category instead of the present rate of Non Domestic tariff.
|
01/04/2022
|
|
66
|
1956/2021
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Review of Commissions Order dated 04.10.2021 passed in the Petition No. 1880/21
|
31/03/2022
|
|
67
|
1987/2022
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Review of Commissions Order dated 15.12.2021 passed in the Petition No. 1872/21
|
31/03/2022
|
|
68
|
1879/2021
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
Determination of Final Capital Cost and Aggregate Revenue Requirement (ARR) and Tariff for FY 2018-19 to FY 2021-22 for Chhabra Super Critical Thermal Power Project (CSCTPP) (Units 5 and 6)
|
28/12/2021
|
|
69
|
1875/2021
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.
|
Approval of true up for FY 2019-20 and Annual Revenue Requirement and Tariff for FY 2021-22 of Transmission and SLDC
|
23/12/2021
|
|
70
|
1872/2021
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
In the matter of Truing up of ARR FY 2019-20 and ARR and Tariff for FY 2021-22
|
15/12/2021
|
|
71
|
1841/2020, 1842/2020, 1843/2020, 1627/2020, 1625/2020, 1626/2020, 1596/2019, 1799/19
|
Discoms
|
In the matter of approval of Multi Year Aggregate Revenue Requirement, Tariff Petition and investment plan of Jaipur Vidyut Vitran Nigam Ltd. (JVVNL), Ajmer Vidyut Vitran Nigam Ltd. (AVVNL) and Jodhpur Vidyut Vitran Nigam Ltd. (JdVVNL) for FY 2020-21 to FY 2023-24.
|
24/11/2021
|
|
72
|
1878/2021
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
Determination of Annual Revenue Requirement (ARR) and Tariff for FY 2020-21 for Dholpur Combined Cycle Power Plant (DCCPP)
|
22/11/2021
|
|
73
|
1852/2020
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.
|
Approval of Investment Plan FY 2021-22
|
22/11/2021
|
|
74
|
1479/2019
|
M/s Rollz Material Handling Systems Pvt. Ltd.
|
In the matter of determination of project specific tariff of Municipal Solid Waste to Energy plant under Section 62 and 86 of the Electricity Act, 2003.
|
21/10/2021
|
|
75
|
1760/2020
|
Sh. Mohan Lal Prajapat
|
Petition filed for review of Commissions order dated 06.02.2020 passed in the matter of determination of ARR and tariff of JVVNL, AVVNL and JdVVNL for FY 2019 20
|
04/10/2021
|
|
76
|
1880/2021
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
Approval of true-up of ARR for FY 2014-15 to FY 2019-20 and determination of ARR and tariff for FY 2021-22 KaTPP Unit 1 and 2
|
04/10/2021
|
|
77
|
1844/2020, 1862/2020, 1847/2020
|
JVVNL AVVNL JdVVNL
|
Approval of true up for FY 2019-20
|
07/09/2021
|
|
78
|
1876/2021
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd
|
Review of Commission Order dated 12.10.2020
|
23/07/2021
|
|
79
|
1854/2020
|
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.
|
Review of Commission Order dated 08.10.2020
|
14/07/2021
|
|
80
|
593/2016
|
Barmer Lignite Mining Company Limited
|
In the matter of determination of transfer price of lignite from Kapurdi and Jalipa mines for FY 2012 to FY 2020
|
26/03/2021
|
|
81
|
1881/2021
|
Suo Motu
|
Determination of Generic Tariff for sale of electricity from Biomass, Biogas and Biomass Gasifier based power plants getting commissioned in the State during FY 2020-21 and FY 2021-22
|
23/03/2021
|
|
82
|
1818/2020
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
Review of Commission Order dated 11.09.2020
|
22/03/2021
|
|
83
|
1665/2020
|
Sh. D.P. Chirania and Ors.
|
In the matter of review of Commission order dated 06.02.2020
|
03/03/2021
|
|
84
|
1612/2020
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
Determination of Provisional Capital Cost,ARR and Provisional Tariff for Units 7and 8 of Suratgarh Super Critical Thermal Power Station for FY 2019-20 and FY 2020-21
|
03/02/2021
|
|
85
|
1599/2020
|
Jaipur Vidyut Vitran Nigam Ltd.
|
Approval of True-up of ARR for FY 2018-19
|
27/01/2021
|
|
86
|
1600/2020
|
Ajmer Vidyut Vitran Nigam Ltd.
|
Approval of True-up of ARR for FY 2018-19
|
27/01/2021
|
|
87
|
1613/2020
|
Jodhpur Vidyut Vitran Nigam Ltd.
|
Approval of True-up of ARR for FY 2018-19
|
27/01/2021
|
|
88
|
1744/2020
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Review of Commission Order dated 12.05.2020 passed in the Petition No. 1515/19
|
18/01/2021
|
|
89
|
1587/2020
|
Rajasthan Vidyut Prasaran Nigam Ltd.
|
In the matter of approval of true up for FY 2018-19 and ARR and Tariff for FY 2020-21 of Transmission and SLDC
|
12/10/2020
|
|
90
|
1590/2019
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
Approval of True up of ARR for FY 2018-19 and Determination of ARR and Tariff for FY 2020-21 for RVUN power stations
|
11/09/2020
|
|
91
|
1579/2019
|
Rajasthan Vidyut Prasaran Nigam Ltd.
|
Approval of Additional Expenditure for FY 2018-19
|
11/09/2020
|
|
92
|
1586/19
|
Giral Lignite Power Limited
|
In the matter of APR for FY 2018-19 and approval of ARR and Tariff for FY 2020-21 for Giral Lignite Power Limited (GLPL) (Units 1-2)
|
17/08/2020
|
|
93
|
1591/19
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
Determination of ARR and Tariff for FY 2020-21 for Kalisindh Thermal Power Project (Units 1 and 2)
|
11/08/2020
|
|
94
|
1581/19
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
Approval of Additional Capitalization for up-gradation of C and I system of Stage I Unit 2 of Suratgarh Thermal Power Station
|
21/07/2020
|
|
95
|
1611/20
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
In-principle approval of additional capitalization for up-gradation of HMI servers of Gas Turbine and HMI workstation of Max DNA system of Dholpur Combined Cycle Power Plant
|
21/07/2020
|
|
96
|
593/16
|
Barmer Lignite Mining Company Ltd.
|
determination of transfer price of lignite from Kapurdi and Jalipa mines for FY 2011-12 to FY 2019-20
|
09/07/2020
|
|
97
|
1546/19
|
RVUNL
|
Approval of APR for FY 2013-14 to FY 2017-18 for Chhabra Thermal Power Project Units 3 and 4
|
27/05/2020
|
|
98
|
1515/2019
|
RVUNL
|
Determination of Final Capital Cost and ARR and Tariff for FY 2014-15 to FY 2019-20 for Kalisindh Thermal Power Project (Unit 1 and 2)
|
12/05/2020
|
|
99
|
-
|
Sou-motu
|
Tariff for sale of power from Wind and Biomass power projects
|
29/04/2020
|
|
100
|
I.A. No. 2 of 2020 in Petition No. 1583/19
|
M/s JSW Energy (Barmer) Ltd.
|
Interim tariff for FY 2020-21
|
23/04/2020
|
|
101
|
1590/19
|
RUVNL
|
Interim tariff for Chhabra Super Critical Thermal Power Plant Unit (5-6) for FY 2020-21
|
23/04/2020
|
|
102
|
1517/19
|
Giral Lignite Power Ltd.
|
Determination of ARR and Tariff for GLPL Unit 1 and 2 for FY 2019-20
|
25/02/2020
|
|
103
|
-
|
Suo-Motu
|
Determination of pre-fixed levellised tariff for sale of power from power projects set up under Component-A and C of the PM KUSUM Scheme of GoI to the State Discoms.
|
11/02/2020
|
|
104
|
1541/19, 1542/19, 1543/19
|
JVVNL AVVNL JdVVNL
|
Approval of ARR and Tariff Petition of Discoms for FY 2019-20.
|
06/02/2020
|
|
105
|
1539/19
|
RVPN
|
Approval of true up of ARR for FY 2017-18 and ARR and Tariff for FY 2020 of Transmission and SLDC
|
31/01/2020
|
|
106
|
-
|
Suo-Motu
|
Determination of generic tariff for Biomass, Biogas and Biomass Gasifier based power plants for FY 2019-20 and revised variable charges of the Biomass power plants.
|
15/01/2020
|
|
107
|
1594/19
|
RUVNL
|
Adoption of tariff for 6800 MW solar power under Section 63 of the Act.
|
08/01/2020
|
|
108
|
1516/19
|
RVUN
|
Approval of ARR and provisional Tariff for Chhabra Super Critical Thermal Power Plant Units 5 and 6 for FY 2020
|
06/01/2020
|
|
109
|
1415/2018 1421/2018 1418/2018
|
JVVNL AVVNL JdVVNL
|
Approval of True-up of ARR for FY 2017-18
|
31/12/2019
|
|
110
|
1417/2018 1423/2018 1420/18
|
JVVNL AVVNL JdVVNL
|
Approval of Investment Plan for FY 2019-20
|
31/12/2019
|
|
111
|
1549/19
|
Rajasthan Urja Vikas Nigam Ltd.
|
Adoption of tariff for 750 MW solar power under Section 63 of the Act.
|
20/12/2019
|
|
112
|
1514/19
|
RVUNL
|
In the matter of approval of ARR and determination of tariff for FY 2020 for Power Stations of Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
18/12/2019
|
|
113
|
1485/19
|
RVUNL
|
Approval of APR for FY 2013-14 to FY 2017-18 for RGTPP Stage-III (160 MW)
|
21/10/2019
|
|
114
|
1458/19
|
RVUNL
|
Seeking in principle approval of additional capitalization at Kota Super Thermal Power Station (Unit 1 to 7)
|
22/08/2019
|
|
115
|
1441/2018
|
RVUNL
|
True up of ARR for FY 2017-18
|
05/08/2019
|
|
116
|
1442/2018
|
Giral Lignite Power Ltd.
|
True-up of ARR for Units 1 and 2 for FY 2017-18
|
30/07/2019
|
|
117
|
1439/2018
|
RVUNL
|
Approval of provisional Capital Cost, ARR and Tariff for Chhabra Super Critical Tharmal Power Plant Unit 5 and 6 for FY 2018-19
|
30/07/2019
|
|
118
|
1478/19
|
RVUNL
|
Review of Commission’s order dated 08.03.2019 issued in the matter of determination of final capital cost, ARR and Tariff for CTPP Unit 3 and 4 for FY 13-14 to 18-19
|
03/07/2019
|
|
119
|
966/16 (I.A. No. 13 of 2018)
|
M/s Barmer Lignite Mining Company Ltd.
|
Determination of Transfer Price of Lignite for FY 2017-18 from Kapurdi and Jalipa mines
|
24/06/2019
|
|
120
|
1286/17
|
M/s JSW Energy (Barmer) Ltd.
|
Determination of ARR and tariff for FY 2018-19
|
13/06/2019
|
|
121
|
1286/17 (I.A. No. 1 of 2019)
|
M/s JSW Energy (Barmer) Ltd.
|
Interim tariff for FY 2019-20
|
01/05/2019
|
|
122
|
1439/18 (I.A. No. 3 of 2019)
|
RVUNL
|
Interim tariff for CTPP Unit 5 and 6 for FY 2019-20
|
01/05/2019
|
|
123
|
1334/18
|
RVUNL
|
Determination of final Capital cost and ARR for FY 2013-14 to FY 2018-19 for Chhabra Thermal Power Project Unit-3 and 4
|
08/03/2019
|
|
124
|
-
|
Suo-Motu
|
Determination of generic tariff Biomass based power plants for FY 2018-19
|
08/03/2019
|
|
125
|
1404/18
|
Ajmer Vidyut Vitran Nigam Ltd.
|
Determination of pooled cost of power purchase for FY 2018-19
|
08/03/2019
|
|
126
|
1414/18
|
Jaipur Vidyut Vitran Nigam Ltd.
|
Determination of pooled cost of power purchase for FY 2018-19
|
08/03/2019
|
|
127
|
1365/18
|
Sh. B.M. Sanadhya
|
Review of Commission’s order dated 28.05.2018
|
07/03/2019
|
|
128
|
1402/18
|
Jodhpur Vidyut Vitran Nigam Ltd.
|
Determination of pooled cost of power purchase for FY 2018-19
|
22/02/2019
|
|
129
|
1340/18
|
RVUNL
|
Approval of final capital cost and ARR and Tariff for FY 2013-14 to FY 2018-19 for RGTPP Stage III (160 MW)
|
31/01/2019
|
|
130
|
1352/18
|
RVPN
|
Review of Commission’s order dated 03.05.2018
|
24/01/2019
|
|
131
|
1439/18
|
RVUNL
|
Determination of ARR and Provisional Tariff for FY 2018-19 for CSTPS Stage II (unit 5 and 6)
|
04/01/2019
|
|
132
|
1361/18
|
JVVNL
|
Review of Commissions order dt. 28.05.2018
|
12/10/2018
|
|
133
|
1364/18
|
JVVNL
|
Approval of Additional Investment Plan for FY 2018-19
|
05/10/2018
|
|
134
|
1357/18
|
RVUN
|
Review of Commission’s Order dt. 18.05.2018
|
26/09/2018
|
|
135
|
1359/18
|
GLPL
|
Review of Commission’s Order dt. 28.05.2018
|
26/09/2018
|
|
136
|
1285/17 1286/17
|
RWPL BLMCL
|
I.A. No. 7 and 8
|
26/09/2018
|
|
137
|
1310/18
|
GLPL
|
Determination of ARR and Tariff for FY 2018-19 and true up for FY 2014-15 to FY 2016-17 for GLTPP Units 1 and 2
|
28/05/2018
|
|
138
|
1294/17 1295/17 1296/17
|
Discoms
|
Approval of ARR and Tariff for FY 18-19
|
28/05/2018
|
|
139
|
1291/17 1292/17 1293/17
|
Discoms
|
Approval of true up of ARR for FY 2016-17
|
28/05/2018
|
|
140
|
1288/17 1289/17 1290/17
|
Discoms
|
Approval of Investment Plan for FY 2018-19
|
28/05/2018
|
|
141
|
1195/17 1221/17
|
M/s Jindal Urban Waste Management Ltd.
|
Determination of project specific tariff for Municipal Solid Waste to Energy plants.
|
18/05/2018
|
|
142
|
1316/18
|
RVUN
|
Determination of ARR and tariff for FY 2018-19 and approval of True-up of ARR for FY 2016-17
|
18/05/2018
|
|
143
|
967/16
|
RWPL
|
Determination of ARR and tariff for FY 2017-18.
|
18/05/2018
|
|
144
|
1285/17 1286/17
|
RWPL BLMCL
|
Interim tariff for FY 2018-19
|
10/05/2018
|
|
145
|
1316/18
|
RVUN
|
Interim tariff for FY 2018-19
|
03/05/2018
|
|
146
|
1310/18
|
GLPL
|
Interim tariff for FY 2018-19
|
03/05/2018
|
|
147
|
1284/17 1309/17
|
RVPN
|
Approval of Investment Plan and determination of ARR and tariff for recovery of Transmission and SLDC Charges for FY 2018-19 and True up of ARR for FY 2016-17 of RVPN.
|
03/05/2018
|
|
148
|
I.A. 09 of 2017 in 966/16
|
BLMCL
|
Application seeking amendment in petition 966/16 filed for determination of transfer price of lignite from Kapurdi mine for FY 2017-18
|
05/04/2018
|
|
149
|
1080/17
|
GLPL
|
Approval of truing up of Unit 1 from FY 2011-12 to FY 2013-14 and of Unit 2 from FY 2010-11 to FY 2013-14 and ARR and Tariff Determination for Unit-1and 2 for FY 2017-18
|
04/04/2018
|
|
150
|
1105/17
|
RVUN
|
determination of provisional Capital Cost, Aggregate Revenue Requirement and provisional Tariff for Unit 5(1x660 MW) of Chhabra Thermal Power Project (2x660 MW) Stage-II for FY 2017-18
|
04/04/2018
|
|
151
|
1100/17
|
M/s Rajasthan State Ganganagar Sugar Mills Ltd
|
Determination of tariff for Baggase based co-generation power plant.
|
25/01/2018
|
|
152
|
1287/17
|
JVVNL
|
Determination of pooled cost of power purchase for FY 2017-18
|
24/01/2018
|
|
153
|
1273/17
|
AVVNL
|
Determination of pooled cost of power purchase for FY 2017-18
|
24/01/2018
|
|
154
|
1272/17
|
JdVVNL
|
Determination of pooled cost of power purchase for FY 2017-18
|
24/01/2018
|
|
155
|
-
|
Suo-Motu
|
determination of generic tariff for biomass, biogas and biomass gasifier based power plants
|
28/11/2017
|
|
156
|
1076/17, 1077/17 and 1078/17
|
JVVNL, AVVNL and JdVVNL
|
Approval of ARR and Tariff Petitions for FY 2016-17 and 2017-18
|
02/11/2017
|
|
157
|
-
|
Suo-Motu
|
Determination of benchmark capital cost for Solar PV and Thermal power projects applicable during FY 2017-18 and generic levelisied tariff
|
09/10/2017
|
|
158
|
986,987,990,991,999,1000/17
|
JVVNL, AVVNL, JdVVNL
|
True-up of ARR for FY 2014-15 and 2015-16
|
05/10/2017
|
|
159
|
992-993, 988-989, 1001-1002/16
|
JVVNL, AVVNL and JdVVNL
|
Approval of Investment Plan for FY 2016-17 and 2017-18
|
06/09/2017
|
|
160
|
1222/17
|
RWPL
|
Review of Commission’s Order dated 19.06.2017
|
04/09/2017
|
|
161
|
-
|
Suo-Motu
|
Generic tariff for sale of electricity from wind power plants getting commissioned during FY 2017-18
|
10/07/2017
|
|
162
|
1035/17
|
RVUN
|
Determination of ARR and tariff For FY 2017-18 and approval of True-up of ARR for FY 2014-15 and 2015-16
|
20/06/2017
|
|
163
|
816/16
|
RWPL
|
Determination of ARR and Tariff for FY 2014-15, FY 2015-16 and FY 2016-17
|
19/06/2017
|
|
164
|
1059/17 and 1079/17
|
RVPN
|
Approval of Investment Plan and determination of ARR and tariff for FY 2017-18 and True up of ARR for FY 2015-16
|
26/05/2017
|
|
165
|
1106/17
|
JVVNL
|
Determination of pooled cost of power purchase for FY 2016-17
|
17/05/2017
|
|
166
|
1060/17
|
JdVVNL
|
Determination of pooled cost of power purchase for FY 2016-17
|
17/05/2017
|
|
167
|
1082/17
|
AVVNL
|
Determination of pooled cost of power purchase for FY 2016-17
|
17/05/2017
|
|
168
|
966/16 967/16
|
RWPL BLMCL
|
Interim tariff for FY 2017-18
|
27/04/2017
|
|
169
|
1035/17
|
RVUN
|
Interim tariff for FY 2017-18
|
07/04/2017
|
|
170
|
1079/17
|
RVPN
|
Interim tariff for FY 2017-18
|
07/04/2017
|
|
171
|
1080/17
|
GLPL
|
Interim tariff for FY 2017-18
|
07/04/2017
|
|
172
|
593/16 (IA No. 2)
|
BLMCL
|
Seeking approval for award of work of developing and operating Kapurdi and Jalipa Mine to the lowest qualified bidder for selection of MDO
|
06/04/2017
|
|
173
|
876/16
|
M/s Rajasthan Textile Mills Association
|
Review of Commission order dt. 24.08.2016
|
02/03/2017
|
|
174
|
959/16
|
RVUN
|
Review of Commission’s order dt. 17.10.16
|
09/12/2016
|
|
175
|
760/16
|
GLPL
|
ARR and Tariff for FY 2014-15, FY 2015-16 and FY 2016-17 for GLPL Unit 1 and 2.
|
07/12/2016
|
|
176
|
817/16
|
Discoms
|
Determination of Cross Subsidy Surcharge for FY 2016-17
|
01/12/2016
|
|
177
|
590/16 592/16
|
RVPN
|
Approval of Investment Plan, determination of ARR and tariff for FY 2016-17 and True up of ARR for FY 2014-15
|
27/10/2016
|
|
178
|
594/16
|
RVUN
|
Tariff for FY16-17 and true up for FY13-14
|
17/10/2016
|
|
179
|
552/15,553/15, 554/15
|
JVVNL, AVVNL, Jd. VVNL
|
Annual Revenue Requirement (ARR) Retail Supply Tariff of Discoms for FY 2015-16 and approval of true-up of ARR for FY 2013-14 and Investment Plan for FY 2015-16
|
22/09/2016
|
|
180
|
548/15
|
Discoms
|
Determination of Additional Surcharge
|
24/08/2016
|
|
181
|
-
|
Suo-Motu
|
Determination of generic tariff for Biomass for FY 2016-17
|
23/08/2016
|
|
182
|
-
|
Suo-Motu
|
Determination of generic tariff for Solar for FY 2016-17
|
23/08/2016
|
|
183
|
701/16
|
RVUN
|
Review of Tariff order dated 07.09.2015
|
08/08/2016
|
|
184
|
445/14 486/14 652/16
|
RWPL
|
Determination of Tariff
|
04/08/2016
|
|
185
|
492/14 595/15
|
GLPL
|
Tariff for FY 15-16 and 16-17
|
14/07/2016
|
|
186
|
245/11
|
BLMCL
|
Determination of transfer price
|
29/06/2016
|
|
187
|
648/16
|
RVPN
|
Adoption of tariff of 400 kV D/C Suratgarh-Bikaner Transmission Line Project through PPP mode availing VGF.
|
21/06/2016
|
|
188
|
-
|
Suo-Motu
|
Generic tariff of Wind Power Plants for FY 2016-17.
|
25/05/2016
|
|
189
|
244/11 383/13 and 423/13
|
RWPL
|
Determination of tariff
|
19/05/2016
|
|
190
|
312/12 341/12 424/13 446/14 and 487/14
|
BLMCL
|
Determination of transfer price
|
19/05/2016
|
|
191
|
548/15
|
Discoms
|
Determination of Additional Surcharge
|
12/05/2016
|
|
192
|
625/16 and 626/16
|
JdVVNL
|
Determination of pooled cost of power purchase for FY 2014-15 and 2015-16
|
01/04/2016
|
|
193
|
592/16
|
RVPN
|
Interim tariff FY 2016-17
|
31/03/2016
|
|
194
|
594/16
|
RVUN
|
Interim tariff FY 2016-17
|
31/03/2016
|
|
195
|
595/16
|
GLPL
|
Interim tariff FY 2016-17
|
31/03/2016
|
|
196
|
584/15
|
AVVNL
|
Determination of pooled cost of power purchase for FY 2014-15 and 2015-16
|
31/03/2016
|
|
197
|
606/16 and 607/16
|
JVVNL
|
Determination of pooled cost of power purchase for FY 2014-15 and 2015-16
|
31/03/2016
|
|
198
|
593/16 652/16
|
RWPL BLMCL
|
Adhoc tariff and transfer price for FY 2016 -17
|
31/03/2016
|
|
199
|
464/14
|
M/s Raj West Power Ltd.
|
Determination of Final Tariff for FY 2009-10 to FY 2013-14 for Units 1 to 8 and true up for FY 2009-10 and FY 2010-11.
|
24/02/2016
|
|
200
|
486/14 487/14
|
RWPL BLMCL
|
Adhoc tariff and transfer price for FY 2015 -16
|
25/01/2016
|
|
201
|
579/15
|
RVUN
|
Provisional Tariff for Unit-2 KaTPP
|
21/01/2016
|
|
202
|
537/15
|
RVUN
|
Determination of Capital Cost, ARR and Provisional Tariff for Unit 4 of CTPP for FY 2014-15
|
01/01/2016
|
|
203
|
-
|
Suo-Motu
|
Determination of Biomass fuel price for FY 2015-16
|
09/09/2015
|
|
204
|
491/14
|
RVUN
|
Determination of ARR and tariff For FY 2015-16 and approval of True-up of ARR for FY 2012-13
|
07/09/2015
|
|
205
|
488/14 499/14
|
RVPN
|
Investment Plan FY16, Tariff for FY16 and True up for FY13-14
|
14/08/2015
|
|
206
|
481/14
|
RVUN
|
Determination of ARR and Tariff for Giral Unit-2 for FY 2010-11 (20 days) to 2013-14
|
12/08/2015
|
|
207
|
483/14
|
GLPL
|
Determination of ARR and Tariff of Giral Unit-1 for FY 2011-12 to FY 2013-14
|
12/08/2015
|
|
208
|
-
|
Suo-Motu
|
Generic tariff for Biomass based power plants for FY 2015-16
|
08/07/2015
|
|
209
|
537/15
|
RVUN
|
Interim tariff for CTPP Unit-4 for FY 2014-15 and FY 2015-16
|
24/06/2015
|
|
210
|
486/14 487/14
|
RWPL BLMCL
|
I.A. No. 2 modification of the interim tariff
|
19/06/2015
|
|
211
|
-
|
Suo-Motu
|
Determination of generic tariff for Solar Power Projects for FY 2015-16
|
19/06/2015
|
|
212
|
452/14
|
RVUN
|
determination of ARR and provisional Tariff for FY 2014-15 for RGTPP Stage III
|
18/06/2015
|
|
213
|
451/14
|
RVUN
|
determination of ARR and provisional Tariff for FY 2013-14 for RGTPP Stage III (1X110 MW GT)
|
17/06/2015
|
|
214
|
-
|
Suo-Motu
|
Determination of generic tariff for Wind Power Plants for FY 2015-16
|
29/05/2015
|
|
215
|
450/14
|
RVUN
|
Determination of ARR and Provisional Tariff for Unit # 3 of CTPP for FY 2013-14
|
22/05/2015
|
|
216
|
462/14
|
RVUN
|
determination of ARR and provisional Tariff for FY 2014-15 for Kalisindh Unit-1
|
14/05/2015
|
|
217
|
-
|
Suo-Motu
|
Interim Tariff of Biomass plants for FY15-16
|
05/05/2015
|
|
218
|
486/14 487/14
|
RWPL BLMCL
|
Interim tariff for FY 2015-16
|
31/03/2015
|
|
219
|
491/14
|
RVUN
|
Interim tariff for FY 15-16
|
31/03/2015
|
|
220
|
492/14
|
GLPL
|
Interim tariff for FY 15-16
|
31/03/2015
|
|
221
|
499/14
|
RVPN
|
Interim tariff for FY 2015-16
|
31/03/2015
|
|
222
|
456 457 458 442 444 447/14
|
JVVNL AVVNL Jd VVNL
|
Retail Supply Tariff ARR and Investment Plan of Discoms for FY 2014-15
|
20/02/2015
|
|
223
|
479/14
|
RVUN
|
Review of Order dated 09.10.2014
|
21/01/2015
|
|
224
|
470/14
|
RVUN
|
Modification in original scope of works of Additional Capitalization for KTPS
|
13/11/2014
|
|
225
|
460/14
|
GLPL
|
determination of ARR and provisional tariff for Giral Unit-I for FY 2014-15
|
12/11/2014
|
|
226
|
453/14
|
RVPN
|
Review of order dt. 09.01.14
|
31/10/2014
|
|
227
|
459/14
|
RVUN
|
Tariff for FY15 and True up for FY12
|
09/10/2014
|
|
228
|
437/14 463/14
|
RVPN
|
Investment Plan FY15, Tariff for FY15 and True up for FY12, FY13
|
09/10/2014
|
|
229
|
244/11
|
RWPL
|
Tariff for FY12 (23 days)
|
18/09/2014
|
|
230
|
-
|
Suo-motu
|
Generic tariff for Solar PV and Solar thermal power projects for FY 2014-15
|
22/08/2014
|
|
231
|
448/14
|
RVUN
|
Review of Commission’s Order dated 24.2.2014
|
20/08/2014
|
|
232
|
-
|
Suo-Motu
|
Generic tariff for Biomass Power Plants for FY15
|
23/07/2014
|
|
233
|
382/13
|
RVUN
|
True up for FY11
|
23/07/2014
|
|
234
|
35312
|
GLPL
|
Provisional determination of tariff for Giral Unit-I for FY 2013-14
|
22/07/2014
|
|
235
|
352/12
|
RVUN
|
determination of tariff for FY 2013-14 for GLPL Unit-II
|
21/07/2014
|
|
236
|
427/13
|
JdVVNL
|
Pooled cost of power purchase for FY 13
|
21/07/2014
|
|
237
|
432/13
|
JVVNL
|
Pooled power purchase cost for FY 14
|
21/07/2014
|
|
238
|
439/14
|
JdVVNL
|
Pooled power purchase cost for FY 14
|
21/07/2014
|
|
239
|
-
|
Suo-Motu
|
Generic tariff for Wind Power Plants for FY15
|
16/07/2014
|
|
240
|
391/13 406/13
|
JVVNL
|
True-up of ARR for FY 11 and FY 12
|
15/07/2014
|
|
241
|
394/13
|
AVVNL
|
True-up of ARR for FY 11 and FY 12
|
15/07/2014
|
|
242
|
389/13 397/13
|
JdVVNL
|
True-up of ARR for FY 11 and FY 12
|
15/07/2014
|
|
243
|
450/14 452/14 462/14
|
RVUN
|
Interim tariff for FY 15 for Chhabra Unit-I, RGTPP (1X160MW) and Kalisindh Unit-I
|
04/07/2014
|
|
244
|
463/14
|
RVPN
|
Interim tariff FY 15
|
25/06/2014
|
|
245
|
459/14 460/14
|
RVUN, GLPL
|
Interim tariff FY 15
|
25/06/2014
|
|
246
|
445/14 446/14
|
RWPL BLMCL
|
Interim tariff for FY15
|
30/05/2014
|
|
247
|
426/13
|
AVVNL
|
Pooled power purchase cost for FY 14
|
29/04/2014
|
|
248
|
-
|
Suo-Motu
|
Interim tariff for FY15
|
31/03/2014
|
|
249
|
252/11 331/12
|
GLPL
|
Tariff for GLPL Unit-I for FY 12 and FY 13
|
24/02/2014
|
|
250
|
352/12
|
RVUN
|
Tariff for FY14
|
24/02/2014
|
|
251
|
257/11 323/12
|
RVUN
|
Tariff for GLPL Unit-II for FY 11 FY 12 and FY 13
|
24/02/2014
|
|
252
|
456/14 457/14 458/14 442/14 444/14 447/14
|
Discoms
|
Determination of ARR and Retail Supply Tariff of Discoms for FY 2014-15 along with true-up of ARR for FY 2012-13 and Approval of Investment Plan for FY 2014-15.
|
20/02/2014
|
|
253
|
374/13, 387/13, 390/13
|
JVVNL, AVVNL, JdVVNL
|
Approval of Investment Plan for FY 2013-14
|
12/02/2014
|
|
254
|
428/13
|
JdVVNL
|
determination of provisional pooled cost of power purchase for FY 2013-14.
|
12/02/2014
|
|
255
|
420/13
|
Discoms
|
Determination of Addl. Surcharge
|
23/01/2014
|
|
256
|
429/13
|
RVPN
|
Adoption of tariff, for lignite based Gurha Thermal Power Plant (70MW)
|
22/01/2014
|
|
257
|
373/13
|
RVPN
|
Tariff for FY14
|
09/01/2014
|
|
258
|
353/12
|
GLPL
|
CoD Order for Giral Unit 1
|
23/12/2013
|
|
259
|
352/12
|
RVUNL
|
CoD Order for Giral Unit 2
|
23/12/2013
|
|
260
|
370/13
|
RVPN
|
Investment Plan for FY14
|
11/12/2013
|
|
261
|
413/13
|
RVUN
|
Review of order 06.06.13
|
10/12/2013
|
|
262
|
395/13
|
JdVVNL
|
Pooled power purchase cost FY12
|
10/12/2013
|
|
263
|
271/11, 304/12
|
JVVNL
|
True up of FY09 , FY10
|
04/12/2013
|
|
264
|
262/11
|
AVVNL
|
True up of FY08,FY09,FY10
|
04/12/2013
|
|
265
|
269/11,274/11
|
JdVVNL
|
True up of FY09, FY10
|
04/12/2013
|
|
266
|
423/13, 424/13
|
Raj WestPower and BLMCL
|
Adhoc Tariff and transfer price for FY14
|
11/10/2013
|
|
267
|
-
|
Suo-Motu
|
Generic Tariff for Biomass Power Projects
|
08/10/2013
|
|
268
|
-
|
Suo-Motu
|
Generic Tariff for Solar Power Projects
|
04/09/2013
|
|
269
|
311, 312, 349, 341/12
|
Raj WestPower and BLMCL
|
Provisional Tariff and transfer price for FY12-13
|
30/08/2013
|
|
270
|
352/12
|
RVUN
|
Adhoc tariff for FY 14
|
01/07/2013
|
|
271
|
311,312, 340 341/12(IA)
|
Raj WestPower and BLMCL
|
Interim tariff and transfer price for FY14
|
28/06/2013
|
|
272
|
353/12
|
GLPL
|
Interim tariff for FY14
|
28/06/2013
|
|
273
|
356,357 and 358/12
|
JVVNL, AVVNL Jd VVNL
|
Retail Supply Tariff for FY 2013-2014
|
06/06/2013
|
|
274
|
285/11,314/12
|
RVUN
|
Tariff for RVUN power stations for FY13
|
06/06/2013
|
|
275
|
-
|
Suo-Motu
|
Tariff for wind power plants for FY13-14
|
17/05/2013
|
|
276
|
311,312, 340 341/12(IA)
|
Raj WestPower and BLMCL
|
Interim tariff and transfer price for FY14
|
04/04/2013
|
|
277
|
352/12
|
RVUN
|
Adhoc tariff for FY 14
|
04/04/2013
|
|
278
|
373/13
|
RVPN
|
Adhoc transmission tariff for FY 14
|
02/04/2013
|
|
279
|
335,336,338/12
|
Discoms
|
pooled cost of power purchase for FY -13
|
11/01/2013
|
|
280
|
277/11, 315/12
|
RVPN
|
Transmission Tariff for FY13 and true up for FY10 , FY11
|
10/01/2013
|
|
281
|
342/12
|
Sh. D.P. Chirania
|
Review of order dt 08.08.12
|
24/12/2012
|
|
282
|
-
|
Suo - Motu
|
Generic Levellised Tariff for Biomass Power Plants FY-13
|
21/12/2012
|
|
283
|
-
|
Suo - Motu
|
Clarification of order 8.8.12
|
21/11/2012
|
|
284
|
316/12
|
Discoms
|
Introduction of Time of Day Tariff
|
08/11/2012
|
|
285
|
283/11
|
RVUN
|
Addl. Capitalization of STPS
|
31/10/2012
|
|
286
|
311,312, 340 341/12(IA)
|
Raj WestPower and BLMCL
|
Interim tariff and transfer price
|
15/10/2012
|
|
287
|
-
|
Suo- Motu
|
Generic Levellised Tariff for wind Power Plants FY-13
|
07/09/2012
|
|
288
|
278/11 279/11 and 280/11
|
JVVNL AVVNL and Jd VVNL
|
Retail Tariff for FY-12-13
|
08/08/2012
|
|
289
|
250/11
|
RVPN
|
Corrigendum-Approval of ARR and tariff for FY 2011-12
|
07/08/2012
|
|
290
|
331/12
|
GLPL
|
Interim tariff for Giral Unit -I
|
17/07/2012
|
|
291
|
255/11 and 256/11
|
ATSCL and MTSCL
|
Adoption of Transmission Charges
|
01/06/2012
|
|
292
|
323/12
|
RVUN
|
Interim tariff for Giral Unit -II
|
31/05/2012
|
|
293
|
-
|
Suo- Motu
|
Generic Levellised Tariff for Solar Power Plants
|
30/05/2012
|
|
294
|
258/11
|
RVUN
|
Review of order dt. 27.04.11 for true-up
|
10/05/2012
|
|
295
|
314/12
|
RVUN
|
Interim tariff for Chhabra TPS
|
03/04/2012
|
|
296
|
311/12 and 312/12
|
Raj WestPower Ltd. and BLMCL
|
Interim tariff and transfer price
|
02/04/2012
|
|
297
|
285/11
|
RVUN
|
Interim tariff
|
30/03/2012
|
|
298
|
315/12
|
RVPN
|
Interim transmission tariff
|
30/03/2012
|
|
299
|
250/11
|
RVPN
|
Approval of ARR and tariff for FY 2011-12
|
23/12/2011
|
|
300
|
-
|
Suo- Motu
|
Revised Tariff for Wind Plants FY-11,FY-12
|
14/12/2011
|
|
301
|
213/10
|
RVPN
|
Corrigendum of Tariff order FY-11
|
09/12/2011
|
|
302
|
-
|
Suo- Motu
|
Revised Tariff for Bio mass-09-10
|
09/12/2011
|
|
303
|
-
|
Suo- Motu
|
Revised Tariff for Bio mass-10-11
|
09/12/2011
|
|
304
|
-
|
Suo- Motu
|
Revised Tariff for Bio mass-11-12
|
09/12/2011
|
|
305
|
237/10
|
RVUN
|
Tariff for RVUN stations for FY12
|
30/11/2011
|
|
306
|
259/11, 261/11 and 266/11
|
AVVNL , JVVNL and Jd. VVNL
|
pooled cost of power purchase for FY -12
|
02/11/2011
|
|
307
|
244/11
|
Rajwest Power Ltd
|
Determination provisional tariff for unit 3,4
|
21/10/2011
|
|
308
|
244/11 and 245/11
|
Rajwest Power Ltd. and Barmer Lignite Mining Ltd.
|
Determination provisional tariff and transfer price
|
30/09/2011
|
|
309
|
238,239and 240/10
|
JVVNL, AVVNL, Jd VVNL
|
ARR and Tariff for FY12
|
08/09/2011
|
|
310
|
244/11 and 245/11
|
Rajwest Power Ltd. and Barmer Lignite Mining Ltd.
|
Determination provisional tariff and transfer price
|
17/08/2011
|
|
311
|
242/11
|
Rajasthan Renewable Energy Corporation
|
Tariff for 1 MW solar power plant
|
17/08/2011
|
|
312
|
215/10
|
RVUN
|
Tariff for Chhabra TPS Unit-I for FY 11 and FY 12
|
13/06/2011
|
|
313
|
212/10
|
RVUN
|
Truing up of RVUN power stations for FY05-08
|
27/04/2011
|
|
314
|
-
|
Sou-motu
|
Wheeling charges and Surcharge-FY12
|
31/03/2011
|
|
315
|
209/09
|
RVUN
|
Tariff for RVUN stations for FY11
|
16/11/2010
|
|
316
|
-
|
Suo-Motu
|
Amendment in Generic tariff for Solar Power Plants
|
29/09/2010
|
|
317
|
213/10
|
RVPN
|
Transmission Tariff for FY11
|
16/09/2010
|
|
318
|
217/10
|
RVPN
|
Adoption of tariff in case I bid
|
31/05/2010
|
|
319
|
207/10
|
RVUN
|
Tariff for KTPS(VII) & STPS (VI) Units
|
27/05/2010
|
|
320
|
-
|
Suo-motu
|
Generic tariff for Solar Power Plants
|
25/05/2010
|
|
321
|
210/09
|
M/s Raj westpower
|
Review of order dt. 13.11.09
|
17/05/2010
|
|
322
|
180/09
|
M/s JdVVNL
|
Multi Year-ARR- FY10-14 & Truing UP FY08
|
15/04/2010
|
|
323
|
181/09
|
M/s JVVNL
|
Multi Year-ARR- FY10-14 & Truing UP FY09
|
15/04/2010
|
|
324
|
185/09
|
M/s AVVNL
|
Multi Year-ARR- FY10-14 & Truing UP FY10
|
15/04/2010
|
|
325
|
-
|
RVPN
|
Interim tariff for FY11
|
31/03/2010
|
|
326
|
-
|
Suo-motu
|
Wheeling charges Surcharge-FY11
|
31/03/2010
|
|
327
|
-
|
Suo-motu
|
Determination of tariff for Bio-mass plantsfor FY11
|
31/03/2010
|
|
328
|
-
|
Suo-motu
|
Determination of tariff for wind for FY11
|
31/03/2010
|
|
329
|
209/09
|
RVUN
|
Intrim tariff for FY11
|
31/03/2010
|
|
330
|
215/10
|
RVUN
|
Provisional Tariff for Chhabra TPS (U-I)
|
11/03/2010
|
|
331
|
206/09
|
RVUN
|
Review of tariff order dated 31.8.09
|
21/01/2010
|
|
332
|
207/09(IA)
|
RVUN
|
Intrim Tariff for KTPS(U-6) & STPS (U-7)
|
16/12/2009
|
|
333
|
184/09
|
M/s Raj WestPower Ltd.
|
Provisional Tariff for first two units of 135 MW each of Raj WestPower Limited
|
13/11/2009
|
|
334
|
179/09
|
M/s RVUN
|
Multi Year-ARR- FY10-14 & Tariff FY-10
|
31/08/2009
|
|
335
|
184/09 (IA)
|
M/s Raj West Power Ltd.
|
Tariff for infirm power
|
28/08/2009
|
|
336
|
-
|
Suo-motto
|
Tariff for biomass power plants
|
17/08/2009
|
|
337
|
201/09
|
M/s RVPN Ltd.
|
Approval of deviation in bidding guidelines
|
11/08/2009
|
|
338
|
186/09
|
M/s RVPN Ltd.
|
Multi Year-ARR- FY10-14 and Tariff FY-10
|
01/08/2009
|
|
339
|
167/08
|
M/s RVPN Ltd.
|
Truing up of ARR for FY-05, FY-06 and FY-07
|
01/08/2009
|
|
340
|
-
|
Suo-motto
|
Tariff for wind power Plants
|
16/07/2009
|
|
341
|
-
|
Suo-motto
|
Wheeling charges & Surcharge-FY10
|
31/03/2009
|
|
342
|
186/09(IA)
|
M/s RVPN Ltd.
|
Intrim Tariff for FY-10
|
30/03/2009
|
|
343
|
179/09 (IA)
|
M/s RVUN
|
Intrim Tariff for FY-10
|
30/03/2009
|
|
344
|
129,137,139,140,141,142/07
|
M/s JVVNL M/s JdVVNL M/s AVVNL
|
Truing up of ARR for FY-06,07 and Correction of ARR for FY-09 of Discoms
|
11/09/2008
|
|
345
|
129,137,139,140,141,142/07
|
M/s JVVNL M/s JdVVNL M/s AVVNL
|
Truing up of ARR for FY-06 and 07 and Correction of ARR for FY-09 of Discoms
|
11/09/2008
|
|
346
|
165/08
|
M/s RVUN
|
Tariff for FY09
|
28/06/2008
|
|
347
|
-
|
Suo-motto
|
Tariff of Inadvertant Power fom CPP
|
16/04/2008
|
|
348
|
-
|
Suo-motto
|
Tariff for Solar Power Plants covered under GoI Policy
|
02/04/2008
|
|
349
|
143/07
|
M/s RVPN Ltd.
|
ARR for FY-09
|
31/03/2008
|
|
350
|
165/08 (IA)
|
M/s RVUN
|
Intrim Tariff for FY-09
|
29/03/2008
|
|
351
|
130/07
|
Suo-motto
|
Rationalization of Retail Tariffs for Vitran Nigams in Rajasthan
|
31/08/2007
|
|
352
|
-
|
Suo-motto
|
Wheeling charges and Surcharge-FY-08
|
22/08/2007
|
|
353
|
121/07
|
M/s JVVNL
|
MY ARR FY 09 of Jaipur, Ajmer and Jodhpur
|
31/03/2007
|
|
354
|
120/07
|
M/s AVVNL
|
MY ARR FY 09 of Jaipur, Ajmer and Jodhpur
|
31/03/2007
|
|
355
|
119/07
|
M/s JdVVNL
|
MY ARR FY 09 of Jaipur, Ajmer and Jodhpur
|
31/03/2007
|
|
356
|
118/07
|
M/s RVUN
|
Tariff for new generation projects of RVUN
|
21/03/2007
|
|
357
|
-
|
Sou-motu
|
Review of Tarriff for wind and biomass projects
|
14/03/2007
|
|
358
|
-
|
Suo-motto
|
Tarriff for wind and biomass projects
|
09/03/2007
|
|
359
|
112 & 117/ 06
|
M/s RVPN Ltd.
|
Multi Year-ARR & Tariff FY-07-09
|
07/03/2007
|
|
360
|
115/06
|
Suo-motto
|
Multi Year-ARR and Tariff FY-07-09 for RVUN
|
12/01/2007
|
|
361
|
107/06
|
Suo-motto
|
Truing up orders of JVVNL, AVVNL, JdVVNL from FY01- 05
|
09/01/2007
|
|
362
|
108/06
|
Suo-motto
|
Truing up orders of JVVNL, AVVNL, JdVVNL from FY01- 05
|
09/01/2007
|
|
363
|
109/06
|
Suo-motto
|
Truing up orders of JVVNL, AVVNL, JdVVNL from FY01- 05
|
09/01/2007
|
|
364
|
105/06
|
M/s Hindustan Zinc Limited
|
Tariff of power from CPP at Chanderiya FY-07
|
28/11/2006
|
|
365
|
46/05, 47/05, 51/05
|
JdVVNL, AVVNL , JVVNL
|
Determination of tariff for deemed licensees
|
23/11/2006
|
|
366
|
110/06
|
M/s RajWest Power
|
Corrigendum to Raj West Power
|
26/10/2006
|
|
367
|
110/06
|
M/s RajWest Power
|
In principle determination of Capital Cost, Transfer price of Lignite and Cost of generation from 1000 MW lignite based thermal power plant
|
19/10/2006
|
|
368
|
84/06
|
JdVVNL
|
Wheeling Surcharge 07
|
19/09/2006
|
|
369
|
85/06
|
JVVNL
|
Wheeling Surcharge 07
|
19/09/2006
|
|
370
|
86/06
|
AVVNL
|
Wheeling Surcharge 07
|
19/09/2006
|
|
371
|
71/05
|
M/s Jd VVNL
|
ARR for FY-07
|
21/07/2006
|
|
372
|
70/05
|
M/s A VVNL
|
ARR for FY-07
|
21/07/2006
|
|
373
|
72/05
|
M/s J VVNL
|
ARR for FY-07
|
21/07/2006
|
|
374
|
88/06
|
M/s RVUN
|
Tariff for generation Stations of RVUN for FY-07
|
17/07/2006
|
|
375
|
60/05
|
M/s RVPN Ltd.
|
Tariff for Transmission & SLDC FY-07
|
31/03/2006
|
|
376
|
__
|
M/s JdVVNL
|
ARR-06
|
22/09/2005
|
|
377
|
__
|
M/s AVVNL
|
ARR-06
|
22/09/2005
|
|
378
|
__
|
M/s JdVVNL
|
ARR-06
|
22/09/2005
|
|
379
|
__
|
M/s JVVNL
|
ARR-06
|
17/09/2005
|
|
380
|
44/05
|
M/s RVUNL
|
Tariff for generation Stations FY-06
|
09/06/2005
|
|
381
|
43/05
|
M/s RVPNL
|
Tariff for transmission of electricity and SLDC charges for FY-06
|
02/05/2005
|
|
382
|
40/04
|
M/s JVVNL
|
Wheeling Charges and Surcharge FY-06
|
21/02/2005
|
|
383
|
42/0
|
M/s JdVVNL
|
Wheeling Charges and Surcharge FY-06
|
21/02/2005
|
|
384
|
41/04
|
M/s AVVNL
|
Wheeling Charges and Surcharge FY-06
|
21/02/2005
|
|
385
|
40/04
|
M/s JVVNL
|
Wheeling Charges and Surcharge FY-06
|
21/02/2005
|
|
386
|
42/0
|
M/s JdVVNL
|
Wheeling Charges and Surcharge FY-06
|
21/02/2005
|
|
387
|
41/04
|
M/s AVVNL
|
Wheeling Charges and Surcharge FY-06
|
21/02/2005
|
|
388
|
36/04
|
M/s AVVNL
|
Tariff for Fy -05
|
17/12/2004
|
|
389
|
37/04
|
M/s JdVVNL
|
Tariff for Fy -05
|
17/12/2004
|
|
390
|
35/04
|
M/s JVVNL
|
Tariff for Fy -05
|
17/12/2004
|
|
391
|
31/04
|
M/s RVUNL
|
Tariff for generation Stations FY-05
|
07/10/2004
|
|
392
|
31/04
|
M/s RVUNL
|
Tariff for generation Stations FY-05
|
07/10/2004
|
|
393
|
26/03
|
M/s RVPNL
|
ARR and Tariff for transmission of electricity and SLDC charges for FY-05
|
17/04/2004
|
|
394
|
-
|
M/s JVVNL
|
ARR for FY-04 and 05
|
17/04/2004
|
|
395
|
-
|
M/s JdVVNL
|
ARR for FY-04 and 05
|
17/04/2004
|
|
396
|
-
|
M/s RVPNL
|
ARR for FY-04
|
31/07/2003
|
|
397
|
-
|
M/s JVVNL
|
ARR for FY-04
|
10/06/2003
|
|
398
|
-
|
M/s AVVNL
|
ARR for FY-04
|
10/06/2003
|
|
399
|
-
|
M/s JdVVNL
|
ARR for FY-04
|
10/06/2003
|
|
400
|
13/02
|
M/s RIICO and Jaipur Nagar Nigam
|
Review of tariff of PSL as per order dt. 24.3.02
|
04/05/2002
|
|
401
|
11/02
|
M/s RIICO and Jaipur Nagar Nigam
|
Review of tariff of PSL as per order dt. 24.3.01
|
04/05/2002
|
|
402
|
12/02
|
DRM (Electrical) Western Railway, Jaipur
|
Review of tariff orde dt. 24.3.01
|
01/04/2002
|
|
403
|
09/01
|
M/s Rajasthan Ginning and Pressing Industries Association, Sriganganagar
|
Review of tariff orde dt. 24.3.01
|
10/10/2001
|
|
404
|
05/00
|
M/s AVVNL
|
Tariff for retail supply of electricity FY-01
|
24/03/2001
|
|
405
|
07/00
|
M/s JdVVNL
|
Tariff for retail supply of electricity FY-01
|
24/03/2001
|
|
406
|
08/00
|
M/s RVPNL
|
Tariff for transmission of electricity FY-01
|
24/03/2001
|
|
407
|
06/00
|
M/s JVVNL
|
Tariff for retail supply of electricity FY-01
|
24/03/2001
|
|