1
|
Petition filed for approval of True-up of ARR for FY 2017-18 and determination of ARR and tariff for FY 2019-20 for RVPN and SLDC
|
13/09/2019
|
13/09/2019
|
|
2
|
Draft order for determination of pre-fixed levelised tariff and rate of purchase of excess electricity by Discoms under PM KUSUM Scheme
|
23/09/2019
|
13/09/2019
|
|
3
|
Petition filed by RVUN for approval of True-up of ARR for FY 2013-14 to 2017-18 for CTPP Unit 3 and 4
|
11/10/2019
|
13/09/2019
|
|
4
|
Draft RERC Supply Code Regulations 2019
|
13/12/2019
|
25/10/2019
|
|
5
|
Draft RERC (Electricity Supply Code and Connected Matters) Regulations, 2019
|
13/12/2019
|
03/12/2019
|
|
6
|
Petition filed by RVUN for approval of Additional Capitalisation for STPS Unit 2
|
03/02/2020
|
03/01/2020
|
|
7
|
Draft order for determination of generic tariff Biomass based power plants getting commissioned during FY 2019-20
|
30/12/2019
|
12/12/2019
|
|
8
|
Petition filed by M/s JSW Energy (Barmer) Limited for determination of Tariff for its Lignite based Thermal Generating Station for F.Y. 2020-21
|
19/01/2020
|
19/12/2019
|
|
9
|
Petition filed by RVUN for determination of ARR and Tariff for Kalisindh Thermal Power Plant Unit 1 and 2 for FY 2020-21
|
03/02/2020
|
03/01/2020
|
|
10
|
Application filed by KEC Bikaner Sikar Transmission Pvt. Ltd. for amendment in Transmission License
|
04/02/2020
|
07/01/2020
|
|
11
|
Petition filed by RVPN for approval of True up of ARR for FY 2019 and determination of Transmission tariff and SLDC Charges for FY 2021
|
05/02/2020
|
13/01/2020
|
|
12
|
Petition filed by RVPN for approval of Additional Capital Expenditure for FY 2019
|
05/02/2020
|
13/01/2020
|
|
13
|
Draft RERC (Service) (Sixth amendment) Regulations, 2020
|
03/02/2020
|
16/01/2020
|
|
14
|
Petition filed by RVUNL for approval of provisional capital cost, ARR and Tariff for FY 20 and FY 21 for SSTPS Unit 7 and 9
|
13/03/2020
|
14/02/2020
|
|
15
|
Draft RERC RE Generic Tariff Order FY 2020-21 and FY 2021-22
|
22/02/2021
|
28/01/2021
|
|
16
|
Petition filed by RVPN for approval of Investment Plan for FY 2023-24
|
17/02/2023
|
16/01/2023
|
|
17
|
Draft RERC (Terms and Conditions for Determination of Tariff) (1st Amendment) Regulations, 2019
|
10/01/2020
|
23/12/2019
|
|
18
|
Petition filed by RVUNL for in-principal approval of additional capitalisation for Dholpur Combined Cycle Power Plant
|
13/03/2020
|
17/02/2020
|
|
19
|
concept paper on Regulatory Framework for Promoting Electric Vehicles and their impact on the Grid and draft order.
|
29/06/2020
|
08/06/2020
|
|
20
|
Petition filed by JVVNL for approval of True-up of ARR for FY 2018-19
|
15/07/2020
|
24/06/2020
|
|
21
|
Petition filed by AVVNL for approval of True-up of ARR for FY 2018-19
|
06/08/2020
|
14/07/2020
|
|
22
|
Draft RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020
|
24/08/2020
|
23/07/2020
|
|
23
|
Petition for approval of True up of ARR for FY 2018-19 filed by Jodhpur Vidyut Vitran Nigam Ltd.
|
14/09/2020
|
24/08/2020
|
|
24
|
Draft RERC (Standards of Performance of Transmission Licensee) Regulations, 2020
|
27/11/2020
|
06/11/2020
|
|
25
|
Draft RERC (Standards of Performance of Distribution Licensees) Regulations, 2020
|
08/12/2020
|
17/11/2020
|
|
26
|
Draft RERC (Consumer Grievance Redressal Forum, Electricity Ombudsman and Consumer Advocacy) Regulations, 2020
|
08/12/2020
|
17/11/2020
|
|
27
|
Petition filed by RVPN for approval of Investment Plan for FY 2021-22
|
10/02/2021
|
01/01/2021
|
|
28
|
Draft Rajasthan Electricity Regulatory Commission (Transaction of Business) Regulations, 2021
|
05/02/2021
|
06/01/2021
|
|
29
|
Petition filed by Ajmer Vidyut Vitran Nigam Ltd. for determination of Multiyear Tariff and Investment Plan for FY 2020-2021 to 2023-2024
|
08/03/2021
|
29/01/2021
|
|
30
|
Petition for Approval of investment plan RVPN 2024-25
|
23/02/2024
|
18/01/2024
|
|
31
|
Draft RERC Service (Eighth Amendment) Regulation, 2024
|
16/12/2024
|
28/11/2024
|
|
32
|
Draft RERC (Renewable Energy Obligation) (Sixth Amendment) Regulations, 2019
|
15/01/2020
|
24/12/2019
|
|
33
|
Petition filed by RVUN for approval of True-up of ARR for FY 2019 and determination of ARR and Tariff for FY 2021
|
03/02/2020
|
03/01/2020
|
|
34
|
Petition filed by RVPN for approval of Investment plan for FY 2021
|
05/02/2020
|
13/01/2020
|
|
35
|
Petition filed by Jodhpur Vidyut Vitran Nigam Ltd. for determination of Multiyear Tariff and Investment Plan for FY 2020-2021 to 2023-2024
|
08/03/2021
|
29/01/2021
|
|
36
|
Petition filed by Jaipur Vidyut Vitran Nigam Ltd. for determination of Multiyear Tariff and Investment Plan for FY 2020-2021 to 2023-2024
|
08/03/2021
|
29/01/2021
|
|
37
|
Petition filed by Discoms for applicability of parallel operation charges on captive consumers of Rajasthan for FY 2019-20
|
08/03/2021
|
01/02/2021
|
|
38
|
Draft Order on installation of solar power systems at schools of the State Government
|
03/03/2021
|
10/02/2021
|
|
39
|
Petition filed by RVUNL for determination of Final Capital Cost and ARR and Tariff For FY 2018-19 to FY 2021-22 for Chhabra Supercritical Thermal Power Station unit 5 and 6
|
23/03/2021
|
18/02/2021
|
|
40
|
Petition filed by RVUNL for determination of ARR and Tariff for FY 2020-21 for Dholpur Combined Cycle Power Plant
|
23/03/2021
|
18/02/2021
|
|
41
|
Petition filed by RVUNL for approval of True-up of ARR for FY 2014-15 to FY 2019-20 for Kalisindh Thermal Power Plant Unit 1 and 2
|
23/03/2021
|
18/02/2021
|
|
42
|
Petition filed by RVPN for approval of True-up of ARR for FY 2019-20 and determination of ARR, transmission tariff and SLDC charges for FY 2021-22
|
31/03/2021
|
26/02/2021
|
|
43
|
Petition filed by RVUNL for determination of ARR and tariff For FY 2021-22 and approval of True-up of ARR for FY 2019-20
|
02/04/2021
|
02/03/2021
|
|
44
|
Petition filed by M/s JSW Energy (Barmer) Limited for determination of Tariff for FY 2021-22 for its Lignite based 1080 MW Thermal Generating Station.
|
22/01/2021
|
22/12/2020
|
|
45
|
Draft RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2020
|
28/01/2021
|
22/12/2020
|
|
46
|
Discussion Paper on Framework for Large Scale Integration of Renewable Energy using Energy Storage Systems and its impact on Tariffs
|
22/04/2021
|
12/03/2021
|
|
47
|
Petition filed by Ajmer Vidyut Vitran Nigam Ltd. for approval of True-up of ARR for FY 2019-20
|
28/05/2021
|
06/05/2021
|
|
48
|
Petition filed by Jodhpur Vidyut Vitran Nigam Ltd. for approval of True-up of ARR for FY 2019-20
|
28/05/2021
|
06/05/2021
|
|
49
|
Petition filed by Jaipur Vidyut Vitran Nigam Ltd. for approval of True-up of ARR for FY 2019-20
|
02/06/2021
|
07/05/2021
|
|
50
|
RERC (Renewable Energy Obligation) (Seventh Amendment) Regulations, 2021
|
23/09/2021
|
02/09/2021
|
|
51
|
In the matter of determination of project specific tariff of Municipal Solid Waste to Energy plant under Section 62 and 86 of the Electricity Act 2003
|
18/10/2021
|
29/09/2021
|
|
52
|
Draft Methodology for Estimation of Electricity Generated form Biomass in Biomass Co-fired coal based thermal Power Plants.
|
03/12/2021
|
03/11/2021
|
|
53
|
In the matter of proposed amendments in the procedure for implementation of the frame work on forecasting and scheduling for renewable energy generating stations wind and solar
|
17/12/2021
|
26/11/2021
|
|
54
|
Petition for determination of Tariff for 1080 MW (8x135 MW) Lignite based Thermal Generating Station of M/s JSW Energy (Barmer) Limited for F.Y. 2022-23
|
05/03/2022
|
02/02/2022
|
|
55
|
Petition for Aggregate Revenue Requirement (ARR) and Tariff for FY 2022-23 for DCCPP (330MW)
|
06/03/2022
|
03/02/2022
|
|
56
|
Petition for Aggregate Revenue Requirement (ARR) and Tariff for FY 2022-23 for CSCTPP Unit 5 and 6 ARR
|
06/03/2022
|
03/02/2022
|
|
57
|
Petition for ARR and Tariff for FY 22-23 and true up for FY 20-21
|
06/03/2022
|
03/02/2022
|
|
58
|
Petition for approval of investment plan for FY 2022-23
|
07/03/2022
|
04/02/2022
|
|
59
|
Petition for ARR and Transmission Tariff and SLDC charges for FY 2022-23 and true up of 2020-21
|
07/03/2022
|
04/02/2022
|
|
60
|
Draft Biomass Generic Tariff Order FT 2022-23
|
26/04/2022
|
04/04/2022
|
|
61
|
Petition filed by AVVNL for approval of ARR, Tariff and Investment plan for FY 2022-23
|
11/05/2022
|
11/04/2022
|
|
62
|
Petition filed by JdVVNL for approval of ARR, Tariff and Investment plan for FY 2022-23
|
13/05/2022
|
13/04/2022
|
|
63
|
Petition filed by JVVNL for true up for FY 2020-21
|
23/05/2022
|
30/04/2022
|
|
64
|
Petition filed by AVVNL for true up for FY 2020-21
|
25/05/2022
|
30/04/2022
|
|
65
|
Petition filed by JdVVNL for true up for FY 2020-21
|
27/05/2022
|
08/05/2022
|
|
66
|
Petition filed to seek approval for procurement of 1200 MW power on long term basis for 25 years from solar power projects with committed power supply from Energy Storage Systems for at least six hours during the peak demand period (English and Hindi Version)
|
09/11/2022
|
28/10/2022
|
|
67
|
Repeal of RERC (Metering) Regulations 2007 and amendments thereof and draft RERC (Metering) Practice Directions, 2021
|
24/03/2021
|
04/03/2021
|
|
68
|
Petition for approval of 294 MW RTC long-term power purchase and approval of deviations in the Model Bidding documents
|
30/06/2022
|
10/06/2022
|
|
69
|
Petition filed to seek approval for procurement of 1200 MW power on long term basis for 25 years from solar power projects with committed power supply from Energy Storage Systems for at least six hours during the peak demand period (English and Hindi Version)
|
09/11/2022
|
04/11/2022
|
|
70
|
Petition for In-Principle Approval of additional capital expenditure within the original scope of work after cut-off date for Chhabra Super Critical Thermal Power Plant (CSCTPP)
|
28/11/2022
|
07/11/2022
|
|
71
|
Draft RERC( Terms and Conditions of determination of Tariff) (2nd amendment) Regulations, 2022
|
05/01/2023
|
14/12/2022
|
|
72
|
Petition for determination of Final Capital Cost and Aggregate Revenue Requirement (ARR) and Tariff for FY 20-21 to FY 23-24 for SSCTPP Unit 7-8 of RVUN.
|
25/01/2023
|
26/12/2022
|
|
73
|
RVUN petition for ARR for 2023-24 and True Up for 2021-2022
|
25/01/2023
|
26/12/2022
|
|
74
|
Petition for determination of Transfer Price of Lignite from Kapurdi and Jalipa Mine for F.Y. 2022-23
|
20/01/2023
|
20/12/2022
|
|
75
|
Draft RERC (Renewable Purchase Obligation) Regulations, 2023
|
31/01/2023
|
07/01/2023
|
|
76
|
Petition filed by RVPN for approval of ARR and Determination of Transmission Tariff for FY 2023-24 alongwith Truing-Up for FY 2021-22
|
17/02/2023
|
16/01/2023
|
|
77
|
Petition filed by JVVNL for ARR, Tariff and Investment Plan for FY 2023-24 and True Up for FY 2021-22
|
30/01/2023
|
29/01/2023
|
|
78
|
Petition filed by AVVNL for ARR, Tariff and Investment Plan for FY 2023-24 and True Up for FY 2021-22
|
30/01/2023
|
29/01/2023
|
|
79
|
Petition filed by JVVNL for approval of ARR, Tariff and Investment plan for FY 2022-23
|
11/05/2022
|
08/04/2022
|
|
80
|
Petition for determination of Transfer Price of Lignite from Kapurdi and Jalipa Mine for F.Y. 2023-24
|
20/01/2023
|
20/12/2022
|
|
81
|
Petition of SLDC for approval of Annual Revenue Requirement / Tariff for FY 2023-24 along with Truing-Up of ARR for FY 2021-22
|
15/01/2023
|
20/12/2022
|
|
82
|
Petition filed by JdVVNL for ARR, Tariff and Investment Plan for FY 2023-24 and True Up for FY 2021-22
|
30/01/2023
|
29/01/2023
|
|
83
|
Petition filed by RUVNL seeking approval for procurement of 160 MW RTC power for 5 years on the basis of the Model Bidding documents.
|
19/03/2023
|
02/03/2023
|
|
84
|
Draft RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (First Amendment) Regulations, 2023
|
26/05/2023
|
02/05/2023
|
|
85
|
In-Principal approval of Additional Capitalization for up-gradation of DCS HMI System and network switches along with PADO System at KalisindhThermal Power Station of RVUN
|
06/09/2023
|
28/08/2023
|
|
86
|
Draft RERC (Service) Seventh Amendment Regulation, 2023
|
27/09/2023
|
06/09/2023
|
|
87
|
Draft RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Second Amendment) Regulations, 2023
|
16/10/2023
|
22/09/2023
|
|
88
|
Draft Rajasthan Electricity Regulatory Commission (Rajasthan Electricity Grid Code) Regulations, 2023
|
12/01/2024
|
08/12/2023
|
|
89
|
Grant of Transmission License for Sangod Transmission Service Limited
|
16/01/2024
|
22/12/2023
|
|
90
|
RVUN Petition for Aggregate Revenue Requirement (ARR) and Tariff for FY 2024-25 and Annual Performance Review (APR) for FY 2022-23
|
22/01/2024
|
22/12/2023
|
|
91
|
Draft RERC(Electricity Supply Code and Connected Matters) (First Amendment) Regulations, 2022
|
11/07/2022
|
10/06/2022
|
|
92
|
Truing up of ARR for FY 20218-19 to FY 2020-21 for Chhabra Super Critical Thermal Power Plant (CSCTPP) Units 5 and 6
|
12/08/2022
|
13/07/2022
|
|
93
|
Petition seeking approval for selection of developers for procurement and approval of bidding documents for ISTS connected energy storage solution of 1000 MW/6000MWh
|
18/12/2023
|
11/12/2023
|
|
94
|
Petition for Approval of ARR (2024-25) and True-Up (2022-23) of SLDC
|
05/02/2024
|
01/01/2024
|
|
95
|
In the matter of Determination of generic tariff for sale of electricity to Distribution Licensee from Biomass, Biogas and Biomass Gasifier based power plants getting commissioned in the State during FY 2023-24 and FY 2024-25
|
22/01/2024
|
01/01/2024
|
|
96
|
Determination of Tariff for F.Y. 2024-25 of 1080 MW (8 x 135 MW) Lignite based Thermal Power Generating Station of M/s JSW Energy (Barmer) Limited
|
03/02/2024
|
03/01/2024
|
|
97
|
Determination of Transfer price of lignite for F.Y. 2024-25 from Kapurdi and Jalipa Lignite Mines of M/s. Barmer Lignite Mining Company Limited
|
03/02/2024
|
03/01/2024
|
|
98
|
Petition filed by RVPN for ARR and Tariff for FY 2024-25 and true up for FY 2022-23
|
23/02/2024
|
18/01/2024
|
|
99
|
Petition for Aggregate Revenue Requirement and Tariff for FY 2024 - 25 and True Up for FY 2020 - 21 to FY 2022 - 23 for SSTPS Unit 7 and 8 of Suratgarh
|
29/02/2024
|
10/02/2024
|
|
100
|
Petition for Grant of Separate Transmission Licence to Thar Power Transmission Service Limited under Regulated Tariff Mechanism (RTM) route
|
01/05/2024
|
02/04/2024
|
|
101
|
Petition for Determination of Tariff for F.Y. 2023-24 of 1080 MW (8 x 135 MW) Lignite based Thermal Power Generating Station of M/s JSW Energy (Barmer) Limited
|
20/01/2023
|
20/12/2022
|
|
102
|
Petition for determination of Transfer Price of Lignite from Kapurdi and Jalipa Mine for F.Y. 2021-22
|
20/01/2023
|
20/12/2022
|
|
103
|
Petition for determination of Transfer Price of Lignite from Kapurdi and Jalipa Mine for F.Y. 2020-21
|
20/01/2023
|
20/12/2022
|
|
104
|
PETITION FOR APPROVAL OF POWER PURCHASE FROM SHORT TERM SOURCES FOR RAJASTHAN DISCOMS
|
28/06/2023
|
06/06/2023
|
|
105
|
Petition for In-principle approval of the Commission for installation of Sewage Treatment Plant at KSTPS.
|
05/10/2023
|
18/09/2023
|
|
106
|
PETITION FOR APPROVAL OF TRUE UP FOR FY 2022-23 AND AGGREGATE REVENUE REQUIREMENT, TARIFF ANDINVESTMENT PLAN FOR FY 2024-25 Filed By JAIPUR VIDYUT VITRAN NIGAM LIMITED, JAIPUR
|
21/06/2024
|
31/05/2024
|
|
107
|
Petition for approval of True-Up for FY 2022-23, ARR and Tariff and Investment Plan for FY 2024-25 in respect of AVVNL
|
21/06/2024
|
31/05/2024
|
|
108
|
Petition for approval of True-Up for FY 2022-23, ARR and Tariff and Investment Plan for FY 2024-25 in respect of JdVVNL
|
25/06/2024
|
04/06/2024
|
|
109
|
PETITION FOR APPROVAL OF PARALLEL OPERATION CHARGES ON CAPTIVE CONSUMERS OF RAJASTHAN FOR FY 24-25
|
17/09/2024
|
16/08/2024
|
|
110
|
PETITION FILED UNDER SECTION 62 (DETERMINATION OF TARIFF) OF THE ELECTRICITY ACT 2003, READ WITH REGULATION 19 AND 21 OF RERC (TRANSACTION OF BUSINESS), REGULATIONS, 2021, FOR APPROVAL OF PRE-FIXED LEVELIZED TARIFFFOR SOLAR POWER CAPACITY OF 1,000 MW AVAILABLE FOR IMPLEMENTATION UNDER COMPONENT A OF PM-KUSUM SCHEME IN RAJASTHAN DISCOMS.
|
04/10/2024
|
27/09/2024
|
|
111
|
Draft RERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024
|
18/10/2024
|
30/09/2024
|
|
112
|
Draft RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources)(First Amendment) Regulations, 2023
|
26/05/2023
|
02/05/2023
|
|
113
|
Petition for Grant of Separate Transmission Licence to Barmer Power Transmission Service Limited under Regulated Tariff Mechanism (RTM) route
|
01/05/2024
|
02/04/2024
|
|
114
|
In-Principle Approval of additional capitalization of capital expenditure of original scope after cut-off date for SSCTPP Unit 7 and 8 of RVUN
|
06/12/2024
|
18/11/2024
|
|
115
|
Draft Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) (3rd Amendment) Regulations, 2023
|
28/08/2023
|
06/08/2023
|
|
116
|
Petition filed by Military Engineer Services for Distribution License
|
23/07/2024
|
26/06/2024
|
|
117
|
Draft RERC(Green Energy Open Access) Regulations, 2024
|
28/10/2024
|
23/10/2024
|
|
118
|
Petition for Grant of Separate Transmission Licence to Hadoti Power Transmission Service Limited under Regulated Tariff Mechanism (RTM) route
|
01/05/2024
|
02/04/2024
|
|
119
|
Draft RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024
|
22/07/2024
|
05/07/2024
|
|
120
|
Petition for Aggregate Revenue Requirement (ARR) and Tariff for FY 2024-25 Dholpur Combined Cycle Power Plant (DCCPP), Dholpur
|
01/11/2024
|
14/10/2024
|
|