1
|
1744/2020
|
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
Review of Commission Order dated 12.05.2020 passed in the Petition No. 1515/19
|
18/01/2021
|
|
2
|
1587/2020
|
Rajasthan Vidyut Prasaran Nigam Ltd.
|
In the matter of approval of true up for FY 2018-19 and ARR and Tariff for FY 2020-21 of Transmission and SLDC
|
12/10/2020
|
|
3
|
1590/2019
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
Approval of True up of ARR for FY 2018-19 and Determination of ARR and Tariff for FY 2020-21 for RVUN power stations
|
11/09/2020
|
|
4
|
1579/2019
|
Rajasthan Vidyut Prasaran Nigam Ltd.
|
Approval of Additional Expenditure for FY 2018-19
|
11/09/2020
|
|
5
|
1586/19
|
Giral Lignite Power Limited
|
In the matter of APR for FY 2018-19 and approval of ARR and Tariff for FY 2020-21 for Giral Lignite Power Limited (GLPL) (Units 1-2)
|
17/08/2020
|
|
6
|
1591/19
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
Determination of ARR and Tariff for FY 2020-21 for Kalisindh Thermal Power Project (Units 1 and 2)
|
11/08/2020
|
|
7
|
1581/19
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
Approval of Additional Capitalization for up-gradation of C and I system of Stage I Unit 2 of Suratgarh Thermal Power Station
|
21/07/2020
|
|
8
|
1611/20
|
Rajasthan Vidyut Utpadan Nigam Ltd.
|
In-principle approval of additional capitalization for up-gradation of HMI servers of Gas Turbine and HMI workstation of Max DNA system of Dholpur Combined Cycle Power Plant
|
21/07/2020
|
|
9
|
593/16
|
Barmer Lignite Mining Company Ltd.
|
determination of transfer price of lignite from Kapurdi and Jalipa mines for FY 2011-12 to FY 2019-20
|
09/07/2020
|
|
10
|
1546/19
|
RVUNL
|
Approval of APR for FY 2013-14 to FY 2017-18 for Chhabra Thermal Power Project Units 3 and 4
|
27/05/2020
|
|
11
|
1515/2019
|
RVUNL
|
Determination of Final Capital Cost and ARR and Tariff for FY 2014-15 to FY 2019-20 for Kalisindh Thermal Power Project (Unit 1 and 2)
|
12/05/2020
|
|
12
|
-
|
Sou-motu
|
Tariff for sale of power from Wind and Biomass power projects
|
29/04/2020
|
|
13
|
I.A. No. 2 of 2020 in Petition No. 1583/19
|
M/s JSW Energy (Barmer) Ltd.
|
Interim tariff for FY 2020-21
|
23/04/2020
|
|
14
|
1590/19
|
RUVNL
|
Interim tariff for Chhabra Super Critical Thermal Power Plant Unit (5-6) for FY 2020-21
|
23/04/2020
|
|
15
|
1517/19
|
Giral Lignite Power Ltd.
|
Determination of ARR and Tariff for GLPL Unit 1 and 2 for FY 2019-20
|
25/02/2020
|
|
16
|
-
|
Suo-Motu
|
Determination of pre-fixed levellised tariff for sale of power from power projects set up under Component-A and C of the PM KUSUM Scheme of GoI to the State Discoms.
|
11/02/2020
|
|
17
|
1541/19, 1542/19, 1543/19
|
JVVNL AVVNL JdVVNL
|
Approval of ARR and Tariff Petition of Discoms for FY 2019-20.
|
06/02/2020
|
|
18
|
1539/19
|
RVPN
|
Approval of true up of ARR for FY 2017-18 and ARR and Tariff for FY 2020 of Transmission and SLDC
|
31/01/2020
|
|
19
|
-
|
Suo-Motu
|
Determination of generic tariff for Biomass, Biogas and Biomass Gasifier based power plants for FY 2019-20 and revised variable charges of the Biomass power plants.
|
15/01/2020
|
|
20
|
1594/19
|
RUVNL
|
Adoption of tariff for 6800 MW solar power under Section 63 of the Act.
|
08/01/2020
|
|
21
|
1516/19
|
RVUN
|
Approval of ARR and provisional Tariff for Chhabra Super Critical Thermal Power Plant Units 5 and 6 for FY 2020
|
06/01/2020
|
|
22
|
1415/2018 1421/2018 1418/2018
|
JVVNL AVVNL JdVVNL
|
Approval of True-up of ARR for FY 2017-18
|
31/12/2019
|
|
23
|
1417/2018 1423/2018 1420/18
|
JVVNL AVVNL JdVVNL
|
Approval of Investment Plan for FY 2019-20
|
31/12/2019
|
|
24
|
1549/19
|
Rajasthan Urja Vikas Nigam Ltd.
|
Adoption of tariff for 750 MW solar power under Section 63 of the Act.
|
20/12/2019
|
|
25
|
1514/19
|
RVUNL
|
In the matter of approval of ARR and determination of tariff for FY 2020 for Power Stations of Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
|
18/12/2019
|
|
26
|
1485/19
|
RVUNL
|
Approval of APR for FY 2013-14 to FY 2017-18 for RGTPP Stage-III (160 MW)
|
21/10/2019
|
|
27
|
1458/19
|
RVUNL
|
Seeking in principle approval of additional capitalization at Kota Super Thermal Power Station (Unit 1 to 7)
|
22/08/2019
|
|
28
|
1441/2018
|
RVUNL
|
True up of ARR for FY 2017-18
|
05/08/2019
|
|
29
|
1442/2018
|
Giral Lignite Power Ltd.
|
True-up of ARR for Units 1 and 2 for FY 2017-18
|
30/07/2019
|
|
30
|
1439/2018
|
RVUNL
|
Approval of provisional Capital Cost, ARR and Tariff for Chhabra Super Critical Tharmal Power Plant Unit 5 and 6 for FY 2018-19
|
30/07/2019
|
|
31
|
1478/19
|
RVUNL
|
Review of Commission’s order dated 08.03.2019 issued in the matter of determination of final capital cost, ARR and Tariff for CTPP Unit 3 and 4 for FY 13-14 to 18-19
|
03/07/2019
|
|
32
|
966/16 (I.A. No. 13 of 2018)
|
M/s Barmer Lignite Mining Company Ltd.
|
Determination of Transfer Price of Lignite for FY 2017-18 from Kapurdi and Jalipa mines
|
24/06/2019
|
|
33
|
1286/17
|
M/s JSW Energy (Barmer) Ltd.
|
Determination of ARR and tariff for FY 2018-19
|
13/06/2019
|
|
34
|
1286/17 (I.A. No. 1 of 2019)
|
M/s JSW Energy (Barmer) Ltd.
|
Interim tariff for FY 2019-20
|
01/05/2019
|
|
35
|
1439/18 (I.A. No. 3 of 2019)
|
RVUNL
|
Interim tariff for CTPP Unit 5 and 6 for FY 2019-20
|
01/05/2019
|
|
36
|
1334/18
|
RVUNL
|
Determination of final Capital cost and ARR for FY 2013-14 to FY 2018-19 for Chhabra Thermal Power Project Unit-3 and 4
|
08/03/2019
|
|
37
|
-
|
Suo-Motu
|
Determination of generic tariff Biomass based power plants for FY 2018-19
|
08/03/2019
|
|
38
|
1404/18
|
Ajmer Vidyut Vitran Nigam Ltd.
|
Determination of pooled cost of power purchase for FY 2018-19
|
08/03/2019
|
|
39
|
1414/18
|
Jaipur Vidyut Vitran Nigam Ltd.
|
Determination of pooled cost of power purchase for FY 2018-19
|
08/03/2019
|
|
40
|
1365/18
|
Sh. B.M. Sanadhya
|
Review of Commission’s order dated 28.05.2018
|
07/03/2019
|
|
41
|
1402/18
|
Jodhpur Vidyut Vitran Nigam Ltd.
|
Determination of pooled cost of power purchase for FY 2018-19
|
22/02/2019
|
|
42
|
1340/18
|
RVUNL
|
Approval of final capital cost and ARR and Tariff for FY 2013-14 to FY 2018-19 for RGTPP Stage III (160 MW)
|
31/01/2019
|
|
43
|
1352/18
|
RVPN
|
Review of Commission’s order dated 03.05.2018
|
24/01/2019
|
|
44
|
1439/18
|
RVUNL
|
Determination of ARR and Provisional Tariff for FY 2018-19 for CSTPS Stage II (unit 5 and 6)
|
04/01/2019
|
|
45
|
1361/18
|
JVVNL
|
Review of Commissions order dt. 28.05.2018
|
12/10/2018
|
|
46
|
1364/18
|
JVVNL
|
Approval of Additional Investment Plan for FY 2018-19
|
05/10/2018
|
|
47
|
1357/18
|
RVUN
|
Review of Commission’s Order dt. 18.05.2018
|
26/09/2018
|
|
48
|
1359/18
|
GLPL
|
Review of Commission’s Order dt. 28.05.2018
|
26/09/2018
|
|
49
|
1285/17 1286/17
|
RWPL BLMCL
|
I.A. No. 7 and 8
|
26/09/2018
|
|
50
|
1310/18
|
GLPL
|
Determination of ARR and Tariff for FY 2018-19 and true up for FY 2014-15 to FY 2016-17 for GLTPP Units 1 and 2
|
28/05/2018
|
|
51
|
1294/17 1295/17 1296/17
|
Discoms
|
Approval of ARR and Tariff for FY 18-19
|
28/05/2018
|
|
52
|
1291/17 1292/17 1293/17
|
Discoms
|
Approval of true up of ARR for FY 2016-17
|
28/05/2018
|
|
53
|
1288/17 1289/17 1290/17
|
Discoms
|
Approval of Investment Plan for FY 2018-19
|
28/05/2018
|
|
54
|
1195/17 1221/17
|
M/s Jindal Urban Waste Management Ltd.
|
Determination of project specific tariff for Municipal Solid Waste to Energy plants.
|
18/05/2018
|
|
55
|
1316/18
|
RVUN
|
Determination of ARR and tariff for FY 2018-19 and approval of True-up of ARR for FY 2016-17
|
18/05/2018
|
|
56
|
967/16
|
RWPL
|
Determination of ARR and tariff for FY 2017-18.
|
18/05/2018
|
|
57
|
1285/17 1286/17
|
RWPL BLMCL
|
Interim tariff for FY 2018-19
|
10/05/2018
|
|
58
|
1316/18
|
RVUN
|
Interim tariff for FY 2018-19
|
03/05/2018
|
|
59
|
1310/18
|
GLPL
|
Interim tariff for FY 2018-19
|
03/05/2018
|
|
60
|
1284/17 1309/17
|
RVPN
|
Approval of Investment Plan and determination of ARR and tariff for recovery of Transmission and SLDC Charges for FY 2018-19 and True up of ARR for FY 2016-17 of RVPN.
|
03/05/2018
|
|
61
|
I.A. 09 of 2017 in 966/16
|
BLMCL
|
Application seeking amendment in petition 966/16 filed for determination of transfer price of lignite from Kapurdi mine for FY 2017-18
|
05/04/2018
|
|
62
|
1080/17
|
GLPL
|
Approval of truing up of Unit 1 from FY 2011-12 to FY 2013-14 and of Unit 2 from FY 2010-11 to FY 2013-14 and ARR and Tariff Determination for Unit-1and 2 for FY 2017-18
|
04/04/2018
|
|
63
|
1105/17
|
RVUN
|
determination of provisional Capital Cost, Aggregate Revenue Requirement and provisional Tariff for Unit 5(1x660 MW) of Chhabra Thermal Power Project (2x660 MW) Stage-II for FY 2017-18
|
04/04/2018
|
|
64
|
1100/17
|
M/s Rajasthan State Ganganagar Sugar Mills Ltd
|
Determination of tariff for Baggase based co-generation power plant.
|
25/01/2018
|
|
65
|
1287/17
|
JVVNL
|
Determination of pooled cost of power purchase for FY 2017-18
|
24/01/2018
|
|
66
|
1273/17
|
AVVNL
|
Determination of pooled cost of power purchase for FY 2017-18
|
24/01/2018
|
|
67
|
1272/17
|
JdVVNL
|
Determination of pooled cost of power purchase for FY 2017-18
|
24/01/2018
|
|
68
|
-
|
Suo-Motu
|
determination of generic tariff for biomass, biogas and biomass gasifier based power plants
|
28/11/2017
|
|
69
|
1076/17, 1077/17 and 1078/17
|
JVVNL, AVVNL and JdVVNL
|
Approval of ARR and Tariff Petitions for FY 2016-17 and 2017-18
|
02/11/2017
|
|
70
|
-
|
Suo-Motu
|
Determination of benchmark capital cost for Solar PV and Thermal power projects applicable during FY 2017-18 and generic levelisied tariff
|
09/10/2017
|
|
71
|
986,987,990,991,999,1000/17
|
JVVNL, AVVNL, JdVVNL
|
True-up of ARR for FY 2014-15 and 2015-16
|
05/10/2017
|
|
72
|
992-993, 988-989, 1001-1002/16
|
JVVNL, AVVNL and JdVVNL
|
Approval of Investment Plan for FY 2016-17 and 2017-18
|
06/09/2017
|
|
73
|
1222/17
|
RWPL
|
Review of Commission’s Order dated 19.06.2017
|
04/09/2017
|
|
74
|
-
|
Suo-Motu
|
Generic tariff for sale of electricity from wind power plants getting commissioned during FY 2017-18
|
10/07/2017
|
|
75
|
1035/17
|
RVUN
|
Determination of ARR and tariff For FY 2017-18 and approval of True-up of ARR for FY 2014-15 and 2015-16
|
20/06/2017
|
|
76
|
816/16
|
RWPL
|
Determination of ARR and Tariff for FY 2014-15, FY 2015-16 and FY 2016-17
|
19/06/2017
|
|
77
|
1059/17 and 1079/17
|
RVPN
|
Approval of Investment Plan and determination of ARR and tariff for FY 2017-18 and True up of ARR for FY 2015-16
|
26/05/2017
|
|
78
|
1106/17
|
JVVNL
|
Determination of pooled cost of power purchase for FY 2016-17
|
17/05/2017
|
|
79
|
1060/17
|
JdVVNL
|
Determination of pooled cost of power purchase for FY 2016-17
|
17/05/2017
|
|
80
|
1082/17
|
AVVNL
|
Determination of pooled cost of power purchase for FY 2016-17
|
17/05/2017
|
|
81
|
966/16 967/16
|
RWPL BLMCL
|
Interim tariff for FY 2017-18
|
27/04/2017
|
|
82
|
1035/17
|
RVUN
|
Interim tariff for FY 2017-18
|
07/04/2017
|
|
83
|
1079/17
|
RVPN
|
Interim tariff for FY 2017-18
|
07/04/2017
|
|
84
|
1080/17
|
GLPL
|
Interim tariff for FY 2017-18
|
07/04/2017
|
|
85
|
593/16 (IA No. 2)
|
BLMCL
|
Seeking approval for award of work of developing and operating Kapurdi and Jalipa Mine to the lowest qualified bidder for selection of MDO
|
06/04/2017
|
|
86
|
876/16
|
M/s Rajasthan Textile Mills Association
|
Review of Commission order dt. 24.08.2016
|
02/03/2017
|
|
87
|
959/16
|
RVUN
|
Review of Commission’s order dt. 17.10.16
|
09/12/2016
|
|
88
|
760/16
|
GLPL
|
ARR and Tariff for FY 2014-15, FY 2015-16 and FY 2016-17 for GLPL Unit 1 and 2.
|
07/12/2016
|
|
89
|
817/16
|
Discoms
|
Determination of Cross Subsidy Surcharge for FY 2016-17
|
01/12/2016
|
|
90
|
590/16 592/16
|
RVPN
|
Approval of Investment Plan, determination of ARR and tariff for FY 2016-17 and True up of ARR for FY 2014-15
|
27/10/2016
|
|
91
|
594/16
|
RVUN
|
Tariff for FY16-17 and true up for FY13-14
|
17/10/2016
|
|
92
|
552/15,553/15, 554/15
|
JVVNL, AVVNL, Jd. VVNL
|
Annual Revenue Requirement (ARR) Retail Supply Tariff of Discoms for FY 2015-16 and approval of true-up of ARR for FY 2013-14 and Investment Plan for FY 2015-16
|
22/09/2016
|
|
93
|
548/15
|
Discoms
|
Determination of Additional Surcharge
|
24/08/2016
|
|
94
|
-
|
Suo-Motu
|
Determination of generic tariff for Biomass for FY 2016-17
|
23/08/2016
|
|
95
|
-
|
Suo-Motu
|
Determination of generic tariff for Solar for FY 2016-17
|
23/08/2016
|
|
96
|
701/16
|
RVUN
|
Review of Tariff order dated 07.09.2015
|
08/08/2016
|
|
97
|
445/14 486/14 652/16
|
RWPL
|
Determination of Tariff
|
04/08/2016
|
|
98
|
492/14 595/15
|
GLPL
|
Tariff for FY 15-16 and 16-17
|
14/07/2016
|
|
99
|
245/11
|
BLMCL
|
Determination of transfer price
|
29/06/2016
|
|
100
|
648/16
|
RVPN
|
Adoption of tariff of 400 kV D/C Suratgarh-Bikaner Transmission Line Project through PPP mode availing VGF.
|
21/06/2016
|
|
101
|
-
|
Suo-Motu
|
Generic tariff of Wind Power Plants for FY 2016-17.
|
25/05/2016
|
|
102
|
244/11 383/13 and 423/13
|
RWPL
|
Determination of tariff
|
19/05/2016
|
|
103
|
312/12 341/12 424/13 446/14 and 487/14
|
BLMCL
|
Determination of transfer price
|
19/05/2016
|
|
104
|
548/15
|
Discoms
|
Determination of Additional Surcharge
|
12/05/2016
|
|
105
|
625/16 and 626/16
|
JdVVNL
|
Determination of pooled cost of power purchase for FY 2014-15 and 2015-16
|
01/04/2016
|
|
106
|
592/16
|
RVPN
|
Interim tariff FY 2016-17
|
31/03/2016
|
|
107
|
594/16
|
RVUN
|
Interim tariff FY 2016-17
|
31/03/2016
|
|
108
|
595/16
|
GLPL
|
Interim tariff FY 2016-17
|
31/03/2016
|
|
109
|
584/15
|
AVVNL
|
Determination of pooled cost of power purchase for FY 2014-15 and 2015-16
|
31/03/2016
|
|
110
|
606/16 and 607/16
|
JVVNL
|
Determination of pooled cost of power purchase for FY 2014-15 and 2015-16
|
31/03/2016
|
|
111
|
593/16 652/16
|
RWPL BLMCL
|
Adhoc tariff and transfer price for FY 2016 -17
|
31/03/2016
|
|
112
|
464/14
|
M/s Raj West Power Ltd.
|
Determination of Final Tariff for FY 2009-10 to FY 2013-14 for Units 1 to 8 and true up for FY 2009-10 and FY 2010-11.
|
24/02/2016
|
|
113
|
486/14 487/14
|
RWPL BLMCL
|
Adhoc tariff and transfer price for FY 2015 -16
|
25/01/2016
|
|
114
|
579/15
|
RVUN
|
Provisional Tariff for Unit-2 KaTPP
|
21/01/2016
|
|
115
|
537/15
|
RVUN
|
Determination of Capital Cost, ARR and Provisional Tariff for Unit 4 of CTPP for FY 2014-15
|
01/01/2016
|
|
116
|
-
|
Suo-Motu
|
Determination of Biomass fuel price for FY 2015-16
|
09/09/2015
|
|
117
|
491/14
|
RVUN
|
Determination of ARR and tariff For FY 2015-16 and approval of True-up of ARR for FY 2012-13
|
07/09/2015
|
|
118
|
488/14 499/14
|
RVPN
|
Investment Plan FY16, Tariff for FY16 and True up for FY13-14
|
14/08/2015
|
|
119
|
481/14
|
RVUN
|
Determination of ARR and Tariff for Giral Unit-2 for FY 2010-11 (20 days) to 2013-14
|
12/08/2015
|
|
120
|
483/14
|
GLPL
|
Determination of ARR and Tariff of Giral Unit-1 for FY 2011-12 to FY 2013-14
|
12/08/2015
|
|
121
|
-
|
Suo-Motu
|
Generic tariff for Biomass based power plants for FY 2015-16
|
08/07/2015
|
|
122
|
537/15
|
RVUN
|
Interim tariff for CTPP Unit-4 for FY 2014-15 and FY 2015-16
|
24/06/2015
|
|
123
|
486/14 487/14
|
RWPL BLMCL
|
I.A. No. 2 modification of the interim tariff
|
19/06/2015
|
|
124
|
-
|
Suo-Motu
|
Determination of generic tariff for Solar Power Projects for FY 2015-16
|
19/06/2015
|
|
125
|
452/14
|
RVUN
|
determination of ARR and provisional Tariff for FY 2014-15 for RGTPP Stage III
|
18/06/2015
|
|
126
|
451/14
|
RVUN
|
determination of ARR and provisional Tariff for FY 2013-14 for RGTPP Stage III (1X110 MW GT)
|
17/06/2015
|
|
127
|
-
|
Suo-Motu
|
Determination of generic tariff for Wind Power Plants for FY 2015-16
|
29/05/2015
|
|
128
|
450/14
|
RVUN
|
Determination of ARR and Provisional Tariff for Unit # 3 of CTPP for FY 2013-14
|
22/05/2015
|
|
129
|
462/14
|
RVUN
|
determination of ARR and provisional Tariff for FY 2014-15 for Kalisindh Unit-1
|
14/05/2015
|
|
130
|
-
|
Suo-Motu
|
Interim Tariff of Biomass plants for FY15-16
|
05/05/2015
|
|
131
|
486/14 487/14
|
RWPL BLMCL
|
Interim tariff for FY 2015-16
|
31/03/2015
|
|
132
|
491/14
|
RVUN
|
Interim tariff for FY 15-16
|
31/03/2015
|
|
133
|
492/14
|
GLPL
|
Interim tariff for FY 15-16
|
31/03/2015
|
|
134
|
499/14
|
RVPN
|
Interim tariff for FY 2015-16
|
31/03/2015
|
|
135
|
456 457 458 442 444 447/14
|
JVVNL AVVNL Jd VVNL
|
Retail Supply Tariff ARR and Investment Plan of Discoms for FY 2014-15
|
20/02/2015
|
|
136
|
479/14
|
RVUN
|
Review of Order dated 09.10.2014
|
21/01/2015
|
|
137
|
470/14
|
RVUN
|
Modification in original scope of works of Additional Capitalization for KTPS
|
13/11/2014
|
|
138
|
460/14
|
GLPL
|
determination of ARR and provisional tariff for Giral Unit-I for FY 2014-15
|
12/11/2014
|
|
139
|
453/14
|
RVPN
|
Review of order dt. 09.01.14
|
31/10/2014
|
|
140
|
459/14
|
RVUN
|
Tariff for FY15 and True up for FY12
|
09/10/2014
|
|
141
|
437/14 463/14
|
RVPN
|
Investment Plan FY15, Tariff for FY15 and True up for FY12, FY13
|
09/10/2014
|
|
142
|
244/11
|
RWPL
|
Tariff for FY12 (23 days)
|
18/09/2014
|
|
143
|
-
|
Suo-motu
|
Generic tariff for Solar PV and Solar thermal power projects for FY 2014-15
|
22/08/2014
|
|
144
|
448/14
|
RVUN
|
Review of Commission’s Order dated 24.2.2014
|
20/08/2014
|
|
145
|
-
|
Suo-Motu
|
Generic tariff for Biomass Power Plants for FY15
|
23/07/2014
|
|
146
|
382/13
|
RVUN
|
True up for FY11
|
23/07/2014
|
|
147
|
35312
|
GLPL
|
Provisional determination of tariff for Giral Unit-I for FY 2013-14
|
22/07/2014
|
|
148
|
352/12
|
RVUN
|
determination of tariff for FY 2013-14 for GLPL Unit-II
|
21/07/2014
|
|
149
|
427/13
|
JdVVNL
|
Pooled cost of power purchase for FY 13
|
21/07/2014
|
|
150
|
432/13
|
JVVNL
|
Pooled power purchase cost for FY 14
|
21/07/2014
|
|
151
|
439/14
|
JdVVNL
|
Pooled power purchase cost for FY 14
|
21/07/2014
|
|
152
|
-
|
Suo-Motu
|
Generic tariff for Wind Power Plants for FY15
|
16/07/2014
|
|
153
|
391/13 406/13
|
JVVNL
|
True-up of ARR for FY 11 and FY 12
|
15/07/2014
|
|
154
|
394/13
|
AVVNL
|
True-up of ARR for FY 11 and FY 12
|
15/07/2014
|
|
155
|
389/13 397/13
|
JdVVNL
|
True-up of ARR for FY 11 and FY 12
|
15/07/2014
|
|
156
|
450/14 452/14 462/14
|
RVUN
|
Interim tariff for FY 15 for Chhabra Unit-I, RGTPP (1X160MW) and Kalisindh Unit-I
|
04/07/2014
|
|
157
|
463/14
|
RVPN
|
Interim tariff FY 15
|
25/06/2014
|
|
158
|
459/14 460/14
|
RVUN, GLPL
|
Interim tariff FY 15
|
25/06/2014
|
|
159
|
445/14 446/14
|
RWPL BLMCL
|
Interim tariff for FY15
|
30/05/2014
|
|
160
|
426/13
|
AVVNL
|
Pooled power purchase cost for FY 14
|
29/04/2014
|
|
161
|
-
|
Suo-Motu
|
Interim tariff for FY15
|
31/03/2014
|
|
162
|
252/11 331/12
|
GLPL
|
Tariff for GLPL Unit-I for FY 12 and FY 13
|
24/02/2014
|
|
163
|
352/12
|
RVUN
|
Tariff for FY14
|
24/02/2014
|
|
164
|
257/11 323/12
|
RVUN
|
Tariff for GLPL Unit-II for FY 11 FY 12 and FY 13
|
24/02/2014
|
|
165
|
456/14 457/14 458/14 442/14 444/14 447/14
|
Discoms
|
Determination of ARR and Retail Supply Tariff of Discoms for FY 2014-15 along with true-up of ARR for FY 2012-13 and Approval of Investment Plan for FY 2014-15.
|
20/02/2014
|
|
166
|
374/13, 387/13, 390/13
|
JVVNL, AVVNL, JdVVNL
|
Approval of Investment Plan for FY 2013-14
|
12/02/2014
|
|
167
|
428/13
|
JdVVNL
|
determination of provisional pooled cost of power purchase for FY 2013-14.
|
12/02/2014
|
|
168
|
420/13
|
Discoms
|
Determination of Addl. Surcharge
|
23/01/2014
|
|
169
|
429/13
|
RVPN
|
Adoption of tariff, for lignite based Gurha Thermal Power Plant (70MW)
|
22/01/2014
|
|
170
|
373/13
|
RVPN
|
Tariff for FY14
|
09/01/2014
|
|
171
|
353/12
|
GLPL
|
CoD Order for Giral Unit 1
|
23/12/2013
|
|
172
|
352/12
|
RVUNL
|
CoD Order for Giral Unit 2
|
23/12/2013
|
|
173
|
370/13
|
RVPN
|
Investment Plan for FY14
|
11/12/2013
|
|
174
|
413/13
|
RVUN
|
Review of order 06.06.13
|
10/12/2013
|
|
175
|
395/13
|
JdVVNL
|
Pooled power purchase cost FY12
|
10/12/2013
|
|
176
|
271/11, 304/12
|
JVVNL
|
True up of FY09 , FY10
|
04/12/2013
|
|
177
|
262/11
|
AVVNL
|
True up of FY08,FY09,FY10
|
04/12/2013
|
|
178
|
269/11,274/11
|
JdVVNL
|
True up of FY09, FY10
|
04/12/2013
|
|
179
|
423/13, 424/13
|
Raj WestPower and BLMCL
|
Adhoc Tariff and transfer price for FY14
|
11/10/2013
|
|
180
|
-
|
Suo-Motu
|
Generic Tariff for Biomass Power Projects
|
08/10/2013
|
|
181
|
-
|
Suo-Motu
|
Generic Tariff for Solar Power Projects
|
04/09/2013
|
|
182
|
311, 312, 349, 341/12
|
Raj WestPower and BLMCL
|
Provisional Tariff and transfer price for FY12-13
|
30/08/2013
|
|
183
|
352/12
|
RVUN
|
Adhoc tariff for FY 14
|
01/07/2013
|
|
184
|
311,312, 340 341/12(IA)
|
Raj WestPower and BLMCL
|
Interim tariff and transfer price for FY14
|
28/06/2013
|
|
185
|
353/12
|
GLPL
|
Interim tariff for FY14
|
28/06/2013
|
|
186
|
356,357 and 358/12
|
JVVNL, AVVNL Jd VVNL
|
Retail Supply Tariff for FY 2013-2014
|
06/06/2013
|
|
187
|
285/11,314/12
|
RVUN
|
Tariff for RVUN power stations for FY13
|
06/06/2013
|
|
188
|
-
|
Suo-Motu
|
Tariff for wind power plants for FY13-14
|
17/05/2013
|
|
189
|
311,312, 340 341/12(IA)
|
Raj WestPower and BLMCL
|
Interim tariff and transfer price for FY14
|
04/04/2013
|
|
190
|
352/12
|
RVUN
|
Adhoc tariff for FY 14
|
04/04/2013
|
|
191
|
373/13
|
RVPN
|
Adhoc transmission tariff for FY 14
|
02/04/2013
|
|
192
|
335,336,338/12
|
Discoms
|
pooled cost of power purchase for FY -13
|
11/01/2013
|
|
193
|
277/11, 315/12
|
RVPN
|
Transmission Tariff for FY13 and true up for FY10 , FY11
|
10/01/2013
|
|
194
|
342/12
|
Sh. D.P. Chirania
|
Review of order dt 08.08.12
|
24/12/2012
|
|
195
|
-
|
Suo - Motu
|
Generic Levellised Tariff for Biomass Power Plants FY-13
|
21/12/2012
|
|
196
|
-
|
Suo - Motu
|
Clarification of order 8.8.12
|
21/11/2012
|
|
197
|
316/12
|
Discoms
|
Introduction of Time of Day Tariff
|
08/11/2012
|
|
198
|
283/11
|
RVUN
|
Addl. Capitalization of STPS
|
31/10/2012
|
|
199
|
311,312, 340 341/12(IA)
|
Raj WestPower and BLMCL
|
Interim tariff and transfer price
|
15/10/2012
|
|
200
|
-
|
Suo- Motu
|
Generic Levellised Tariff for wind Power Plants FY-13
|
07/09/2012
|
|
201
|
278/11 279/11 and 280/11
|
JVVNL AVVNL and Jd VVNL
|
Retail Tariff for FY-12-13
|
08/08/2012
|
|
202
|
250/11
|
RVPN
|
Corrigendum-Approval of ARR and tariff for FY 2011-12
|
07/08/2012
|
|
203
|
331/12
|
GLPL
|
Interim tariff for Giral Unit -I
|
17/07/2012
|
|
204
|
255/11 and 256/11
|
ATSCL and MTSCL
|
Adoption of Transmission Charges
|
01/06/2012
|
|
205
|
323/12
|
RVUN
|
Interim tariff for Giral Unit -II
|
31/05/2012
|
|
206
|
-
|
Suo- Motu
|
Generic Levellised Tariff for Solar Power Plants
|
30/05/2012
|
|
207
|
258/11
|
RVUN
|
Review of order dt. 27.04.11 for true-up
|
10/05/2012
|
|
208
|
314/12
|
RVUN
|
Interim tariff for Chhabra TPS
|
03/04/2012
|
|
209
|
311/12 and 312/12
|
Raj WestPower Ltd. and BLMCL
|
Interim tariff and transfer price
|
02/04/2012
|
|
210
|
285/11
|
RVUN
|
Interim tariff
|
30/03/2012
|
|
211
|
315/12
|
RVPN
|
Interim transmission tariff
|
30/03/2012
|
|
212
|
250/11
|
RVPN
|
Approval of ARR and tariff for FY 2011-12
|
23/12/2011
|
|
213
|
-
|
Suo- Motu
|
Revised Tariff for Wind Plants FY-11,FY-12
|
14/12/2011
|
|
214
|
213/10
|
RVPN
|
Corrigendum of Tariff order FY-11
|
09/12/2011
|
|
215
|
-
|
Suo- Motu
|
Revised Tariff for Bio mass-09-10
|
09/12/2011
|
|
216
|
-
|
Suo- Motu
|
Revised Tariff for Bio mass-10-11
|
09/12/2011
|
|
217
|
-
|
Suo- Motu
|
Revised Tariff for Bio mass-11-12
|
09/12/2011
|
|
218
|
237/10
|
RVUN
|
Tariff for RVUN stations for FY12
|
30/11/2011
|
|
219
|
259/11, 261/11 and 266/11
|
AVVNL , JVVNL and Jd. VVNL
|
pooled cost of power purchase for FY -12
|
02/11/2011
|
|
220
|
244/11
|
Rajwest Power Ltd
|
Determination provisional tariff for unit 3,4
|
21/10/2011
|
|
221
|
244/11 and 245/11
|
Rajwest Power Ltd. and Barmer Lignite Mining Ltd.
|
Determination provisional tariff and transfer price
|
30/09/2011
|
|
222
|
238,239and 240/10
|
JVVNL, AVVNL, Jd VVNL
|
ARR and Tariff for FY12
|
08/09/2011
|
|
223
|
244/11 and 245/11
|
Rajwest Power Ltd. and Barmer Lignite Mining Ltd.
|
Determination provisional tariff and transfer price
|
17/08/2011
|
|
224
|
242/11
|
Rajasthan Renewable Energy Corporation
|
Tariff for 1 MW solar power plant
|
17/08/2011
|
|
225
|
215/10
|
RVUN
|
Tariff for Chhabra TPS Unit-I for FY 11 and FY 12
|
13/06/2011
|
|
226
|
212/10
|
RVUN
|
Truing up of RVUN power stations for FY05-08
|
27/04/2011
|
|
227
|
-
|
Sou-motu
|
Wheeling charges and Surcharge-FY12
|
31/03/2011
|
|
228
|
209/09
|
RVUN
|
Tariff for RVUN stations for FY11
|
16/11/2010
|
|
229
|
-
|
Suo-Motu
|
Amendment in Generic tariff for Solar Power Plants
|
29/09/2010
|
|
230
|
213/10
|
RVPN
|
Transmission Tariff for FY11
|
16/09/2010
|
|
231
|
217/10
|
RVPN
|
Adoption of tariff in case I bid
|
31/05/2010
|
|
232
|
207/10
|
RVUN
|
Tariff for KTPS(VII) & STPS (VI) Units
|
27/05/2010
|
|
233
|
-
|
Suo-motu
|
Generic tariff for Solar Power Plants
|
25/05/2010
|
|
234
|
210/09
|
M/s Raj westpower
|
Review of order dt. 13.11.09
|
17/05/2010
|
|
235
|
180/09
|
M/s JdVVNL
|
Multi Year-ARR- FY10-14 & Truing UP FY08
|
15/04/2010
|
|
236
|
181/09
|
M/s JVVNL
|
Multi Year-ARR- FY10-14 & Truing UP FY09
|
15/04/2010
|
|
237
|
185/09
|
M/s AVVNL
|
Multi Year-ARR- FY10-14 & Truing UP FY10
|
15/04/2010
|
|
238
|
-
|
RVPN
|
Interim tariff for FY11
|
31/03/2010
|
|
239
|
-
|
Suo-motu
|
Wheeling charges Surcharge-FY11
|
31/03/2010
|
|
240
|
-
|
Suo-motu
|
Determination of tariff for Bio-mass plantsfor FY11
|
31/03/2010
|
|
241
|
-
|
Suo-motu
|
Determination of tariff for wind for FY11
|
31/03/2010
|
|
242
|
209/09
|
RVUN
|
Intrim tariff for FY11
|
31/03/2010
|
|
243
|
215/10
|
RVUN
|
Provisional Tariff for Chhabra TPS (U-I)
|
11/03/2010
|
|
244
|
206/09
|
RVUN
|
Review of tariff order dated 31.8.09
|
21/01/2010
|
|
245
|
207/09(IA)
|
RVUN
|
Intrim Tariff for KTPS(U-6) & STPS (U-7)
|
16/12/2009
|
|
246
|
184/09
|
M/s Raj WestPower Ltd.
|
Provisional Tariff for first two units of 135 MW each of Raj WestPower Limited
|
13/11/2009
|
|
247
|
179/09
|
M/s RVUN
|
Multi Year-ARR- FY10-14 & Tariff FY-10
|
31/08/2009
|
|
248
|
184/09 (IA)
|
M/s Raj West Power Ltd.
|
Tariff for infirm power
|
28/08/2009
|
|
249
|
-
|
Suo-motto
|
Tariff for biomass power plants
|
17/08/2009
|
|
250
|
201/09
|
M/s RVPN Ltd.
|
Approval of deviation in bidding guidelines
|
11/08/2009
|
|
251
|
186/09
|
M/s RVPN Ltd.
|
Multi Year-ARR- FY10-14 and Tariff FY-10
|
01/08/2009
|
|
252
|
167/08
|
M/s RVPN Ltd.
|
Truing up of ARR for FY-05, FY-06 and FY-07
|
01/08/2009
|
|
253
|
-
|
Suo-motto
|
Tariff for wind power Plants
|
16/07/2009
|
|
254
|
-
|
Suo-motto
|
Wheeling charges & Surcharge-FY10
|
31/03/2009
|
|
255
|
186/09(IA)
|
M/s RVPN Ltd.
|
Intrim Tariff for FY-10
|
30/03/2009
|
|
256
|
179/09 (IA)
|
M/s RVUN
|
Intrim Tariff for FY-10
|
30/03/2009
|
|
257
|
129,137,139,140,141,142/07
|
M/s JVVNL M/s JdVVNL M/s AVVNL
|
Truing up of ARR for FY-06,07 and Correction of ARR for FY-09 of Discoms
|
11/09/2008
|
|
258
|
129,137,139,140,141,142/07
|
M/s JVVNL M/s JdVVNL M/s AVVNL
|
Truing up of ARR for FY-06 and 07 and Correction of ARR for FY-09 of Discoms
|
11/09/2008
|
|
259
|
165/08
|
M/s RVUN
|
Tariff for FY09
|
28/06/2008
|
|
260
|
-
|
Suo-motto
|
Tariff of Inadvertant Power fom CPP
|
16/04/2008
|
|
261
|
-
|
Suo-motto
|
Tariff for Solar Power Plants covered under GoI Policy
|
02/04/2008
|
|
262
|
143/07
|
M/s RVPN Ltd.
|
ARR for FY-09
|
31/03/2008
|
|
263
|
165/08 (IA)
|
M/s RVUN
|
Intrim Tariff for FY-09
|
29/03/2008
|
|
264
|
130/07
|
Suo-motto
|
Rationalization of Retail Tariffs for Vitran Nigams in Rajasthan
|
31/08/2007
|
|
265
|
-
|
Suo-motto
|
Wheeling charges and Surcharge-FY-08
|
22/08/2007
|
|
266
|
121/07
|
M/s JVVNL
|
MY ARR FY 09 of Jaipur, Ajmer and Jodhpur
|
31/03/2007
|
|
267
|
120/07
|
M/s AVVNL
|
MY ARR FY 09 of Jaipur, Ajmer and Jodhpur
|
31/03/2007
|
|
268
|
119/07
|
M/s JdVVNL
|
MY ARR FY 09 of Jaipur, Ajmer and Jodhpur
|
31/03/2007
|
|
269
|
118/07
|
M/s RVUN
|
Tariff for new generation projects of RVUN
|
21/03/2007
|
|
270
|
-
|
Sou-motu
|
Review of Tarriff for wind and biomass projects
|
14/03/2007
|
|
271
|
-
|
Suo-motto
|
Tarriff for wind and biomass projects
|
09/03/2007
|
|
272
|
112 & 117/ 06
|
M/s RVPN Ltd.
|
Multi Year-ARR & Tariff FY-07-09
|
07/03/2007
|
|
273
|
115/06
|
Suo-motto
|
Multi Year-ARR and Tariff FY-07-09 for RVUN
|
12/01/2007
|
|
274
|
107/06
|
Suo-motto
|
Truing up orders of JVVNL, AVVNL, JdVVNL from FY01- 05
|
09/01/2007
|
|
275
|
108/06
|
Suo-motto
|
Truing up orders of JVVNL, AVVNL, JdVVNL from FY01- 05
|
09/01/2007
|
|
276
|
109/06
|
Suo-motto
|
Truing up orders of JVVNL, AVVNL, JdVVNL from FY01- 05
|
09/01/2007
|
|
277
|
105/06
|
M/s Hindustan Zinc Limited
|
Tariff of power from CPP at Chanderiya FY-07
|
28/11/2006
|
|
278
|
46/05, 47/05, 51/05
|
JdVVNL, AVVNL , JVVNL
|
Determination of tariff for deemed licensees
|
23/11/2006
|
|
279
|
110/06
|
M/s RajWest Power
|
Corrigendum to Raj West Power
|
26/10/2006
|
|
280
|
110/06
|
M/s RajWest Power
|
In principle determination of Capital Cost, Transfer price of Lignite and Cost of generation from 1000 MW lignite based thermal power plant
|
19/10/2006
|
|
281
|
84/06
|
JdVVNL
|
Wheeling Surcharge 07
|
19/09/2006
|
|
282
|
85/06
|
JVVNL
|
Wheeling Surcharge 07
|
19/09/2006
|
|
283
|
86/06
|
AVVNL
|
Wheeling Surcharge 07
|
19/09/2006
|
|
284
|
71/05
|
M/s Jd VVNL
|
ARR for FY-07
|
21/07/2006
|
|
285
|
70/05
|
M/s A VVNL
|
ARR for FY-07
|
21/07/2006
|
|
286
|
72/05
|
M/s J VVNL
|
ARR for FY-07
|
21/07/2006
|
|
287
|
88/06
|
M/s RVUN
|
Tariff for generation Stations of RVUN for FY-07
|
17/07/2006
|
|
288
|
60/05
|
M/s RVPN Ltd.
|
Tariff for Transmission & SLDC FY-07
|
31/03/2006
|
|
289
|
__
|
M/s JdVVNL
|
ARR-06
|
22/09/2005
|
|
290
|
__
|
M/s AVVNL
|
ARR-06
|
22/09/2005
|
|
291
|
__
|
M/s JdVVNL
|
ARR-06
|
22/09/2005
|
|
292
|
__
|
M/s JVVNL
|
ARR-06
|
17/09/2005
|
|
293
|
44/05
|
M/s RVUNL
|
Tariff for generation Stations FY-06
|
09/06/2005
|
|
294
|
43/05
|
M/s RVPNL
|
Tariff for transmission of electricity and SLDC charges for FY-06
|
02/05/2005
|
|
295
|
40/04
|
M/s JVVNL
|
Wheeling Charges and Surcharge FY-06
|
21/02/2005
|
|
296
|
42/0
|
M/s JdVVNL
|
Wheeling Charges and Surcharge FY-06
|
21/02/2005
|
|
297
|
41/04
|
M/s AVVNL
|
Wheeling Charges and Surcharge FY-06
|
21/02/2005
|
|
298
|
40/04
|
M/s JVVNL
|
Wheeling Charges and Surcharge FY-06
|
21/02/2005
|
|
299
|
42/0
|
M/s JdVVNL
|
Wheeling Charges and Surcharge FY-06
|
21/02/2005
|
|
300
|
41/04
|
M/s AVVNL
|
Wheeling Charges and Surcharge FY-06
|
21/02/2005
|
|
301
|
36/04
|
M/s AVVNL
|
Tariff for Fy -05
|
17/12/2004
|
|
302
|
37/04
|
M/s JdVVNL
|
Tariff for Fy -05
|
17/12/2004
|
|
303
|
35/04
|
M/s JVVNL
|
Tariff for Fy -05
|
17/12/2004
|
|
304
|
31/04
|
M/s RVUNL
|
Tariff for generation Stations FY-05
|
07/10/2004
|
|
305
|
31/04
|
M/s RVUNL
|
Tariff for generation Stations FY-05
|
07/10/2004
|
|
306
|
26/03
|
M/s RVPNL
|
ARR and Tariff for transmission of electricity and SLDC charges for FY-05
|
17/04/2004
|
|
307
|
-
|
M/s JVVNL
|
ARR for FY-04 and 05
|
17/04/2004
|
|
308
|
-
|
M/s JdVVNL
|
ARR for FY-04 and 05
|
17/04/2004
|
|
309
|
-
|
M/s RVPNL
|
ARR for FY-04
|
31/07/2003
|
|
310
|
-
|
M/s JVVNL
|
ARR for FY-04
|
10/06/2003
|
|
311
|
-
|
M/s AVVNL
|
ARR for FY-04
|
10/06/2003
|
|
312
|
-
|
M/s JdVVNL
|
ARR for FY-04
|
10/06/2003
|
|
313
|
13/02
|
M/s RIICO and Jaipur Nagar Nigam
|
Review of tariff of PSL as per order dt. 24.3.02
|
04/05/2002
|
|
314
|
11/02
|
M/s RIICO and Jaipur Nagar Nigam
|
Review of tariff of PSL as per order dt. 24.3.01
|
04/05/2002
|
|
315
|
12/02
|
DRM (Electrical) Western Railway, Jaipur
|
Review of tariff orde dt. 24.3.01
|
01/04/2002
|
|
316
|
09/01
|
M/s Rajasthan Ginning and Pressing Industries Association, Sriganganagar
|
Review of tariff orde dt. 24.3.01
|
10/10/2001
|
|
317
|
05/00
|
M/s AVVNL
|
Tariff for retail supply of electricity FY-01
|
24/03/2001
|
|
318
|
07/00
|
M/s JdVVNL
|
Tariff for retail supply of electricity FY-01
|
24/03/2001
|
|
319
|
08/00
|
M/s RVPNL
|
Tariff for transmission of electricity FY-01
|
24/03/2001
|
|
320
|
06/00
|
M/s JVVNL
|
Tariff for retail supply of electricity FY-01
|
24/03/2001
|
|