                                                            1   
                                                         | 
                                                        
                                                            Petition filed for approval of True-up of ARR for FY 2017-18 and determination of ARR and tariff for FY 2019-20 for RVPN and SLDC
                                                         | 
                                                        
                                                            13/09/2019
                                                         | 
                                                          
                                                            13/09/2019
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            2   
                                                         | 
                                                        
                                                            Draft order for determination of pre-fixed levelised tariff and rate of purchase of excess electricity by Discoms under PM KUSUM Scheme
                                                         | 
                                                        
                                                            23/09/2019
                                                         | 
                                                          
                                                            13/09/2019
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            3   
                                                         | 
                                                        
                                                            Petition filed by RVUN for approval of True-up of ARR for FY 2013-14 to 2017-18 for CTPP Unit 3 and 4
                                                         | 
                                                        
                                                            11/10/2019
                                                         | 
                                                          
                                                            13/09/2019
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            4   
                                                         | 
                                                        
                                                            Draft RERC Supply Code Regulations 2019
                                                         | 
                                                        
                                                            13/12/2019
                                                         | 
                                                          
                                                            25/10/2019
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            5   
                                                         | 
                                                        
                                                            Draft RERC (Electricity Supply Code and Connected Matters) Regulations, 2019
                                                         | 
                                                        
                                                            13/12/2019
                                                         | 
                                                          
                                                            03/12/2019
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            6   
                                                         | 
                                                        
                                                            Petition filed by RVUN for approval of Additional Capitalisation for STPS Unit 2
                                                         | 
                                                        
                                                            03/02/2020
                                                         | 
                                                          
                                                            03/01/2020
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            7   
                                                         | 
                                                        
                                                            Draft order for determination of generic tariff Biomass based power plants getting commissioned during FY 2019-20 
                                                         | 
                                                        
                                                            30/12/2019
                                                         | 
                                                          
                                                            12/12/2019
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            8   
                                                         | 
                                                        
                                                            Petition filed by M/s JSW Energy (Barmer) Limited for determination of Tariff for its Lignite based Thermal Generating Station for F.Y. 2020-21 
                                                         | 
                                                        
                                                            19/01/2020
                                                         | 
                                                          
                                                            19/12/2019
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            9   
                                                         | 
                                                        
                                                            Petition filed by RVUN for determination of ARR and Tariff for Kalisindh Thermal Power Plant Unit 1 and 2 for FY 2020-21
                                                         | 
                                                        
                                                            03/02/2020
                                                         | 
                                                          
                                                            03/01/2020
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            10   
                                                         | 
                                                        
                                                            Application filed by KEC Bikaner Sikar Transmission Pvt. Ltd. for amendment in Transmission License
                                                         | 
                                                        
                                                            04/02/2020
                                                         | 
                                                          
                                                            07/01/2020
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            11   
                                                         | 
                                                        
                                                            Petition filed by RVPN for approval of True up of ARR for FY 2019 and determination of Transmission tariff and SLDC Charges for FY 2021
                                                         | 
                                                        
                                                            05/02/2020
                                                         | 
                                                          
                                                            13/01/2020
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            12   
                                                         | 
                                                        
                                                            Petition filed by RVPN for approval of Additional Capital Expenditure for FY 2019
                                                         | 
                                                        
                                                            05/02/2020
                                                         | 
                                                          
                                                            13/01/2020
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            13   
                                                         | 
                                                        
                                                            Draft RERC (Service) (Sixth amendment) Regulations, 2020
                                                         | 
                                                        
                                                            03/02/2020
                                                         | 
                                                          
                                                            16/01/2020
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            14   
                                                         | 
                                                        
                                                            Petition filed by RVUNL for approval of provisional capital cost, ARR and Tariff for FY 20 and FY 21 for SSTPS Unit 7 and 9
                                                         | 
                                                        
                                                            13/03/2020
                                                         | 
                                                          
                                                            14/02/2020
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            15   
                                                         | 
                                                        
                                                            Draft RERC RE Generic Tariff Order FY 2020-21 and FY 2021-22
                                                         | 
                                                        
                                                            22/02/2021
                                                         | 
                                                          
                                                            28/01/2021
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            16   
                                                         | 
                                                        
                                                            Petition filed by RVPN for approval of Investment Plan for FY 2023-24
                                                         | 
                                                        
                                                            17/02/2023
                                                         | 
                                                          
                                                            16/01/2023
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            17   
                                                         | 
                                                        
                                                            Draft RERC (Terms and Conditions for Determination of Tariff) (1st Amendment) Regulations, 2019
                                                         | 
                                                        
                                                            10/01/2020
                                                         | 
                                                          
                                                            23/12/2019
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            18   
                                                         | 
                                                        
                                                            Petition filed by RVUNL for in-principal approval of additional capitalisation for Dholpur Combined Cycle Power Plant 
                                                         | 
                                                        
                                                            13/03/2020
                                                         | 
                                                          
                                                            17/02/2020
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            19   
                                                         | 
                                                        
                                                            concept paper on Regulatory Framework for Promoting Electric Vehicles and their impact on the Grid and draft order.
                                                         | 
                                                        
                                                            29/06/2020
                                                         | 
                                                          
                                                            08/06/2020
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            20   
                                                         | 
                                                        
                                                            Petition filed by JVVNL for approval of True-up of ARR for FY 2018-19
                                                         | 
                                                        
                                                            15/07/2020
                                                         | 
                                                          
                                                            24/06/2020
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            21   
                                                         | 
                                                        
                                                            Petition filed by AVVNL for approval of True-up of ARR for FY 2018-19
                                                         | 
                                                        
                                                            06/08/2020
                                                         | 
                                                          
                                                            14/07/2020
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            22   
                                                         | 
                                                        
                                                            Draft RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020
                                                         | 
                                                        
                                                            24/08/2020
                                                         | 
                                                          
                                                            23/07/2020
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            23   
                                                         | 
                                                        
                                                            Petition for approval of True up of ARR for FY 2018-19 filed by Jodhpur Vidyut Vitran Nigam Ltd.
                                                         | 
                                                        
                                                            14/09/2020
                                                         | 
                                                          
                                                            24/08/2020
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            24   
                                                         | 
                                                        
                                                            Draft RERC (Standards of Performance of Transmission Licensee) Regulations, 2020 
                                                         | 
                                                        
                                                            27/11/2020
                                                         | 
                                                          
                                                            06/11/2020
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            25   
                                                         | 
                                                        
                                                            Draft RERC (Standards of Performance of Distribution Licensees) Regulations, 2020
                                                         | 
                                                        
                                                            08/12/2020
                                                         | 
                                                          
                                                            17/11/2020
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            26   
                                                         | 
                                                        
                                                            Draft RERC (Consumer Grievance Redressal Forum, Electricity Ombudsman and Consumer Advocacy) Regulations, 2020
                                                         | 
                                                        
                                                            08/12/2020
                                                         | 
                                                          
                                                            17/11/2020
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            27   
                                                         | 
                                                        
                                                            Petition filed by RVPN for approval of Investment Plan for FY 2021-22
                                                         | 
                                                        
                                                            10/02/2021
                                                         | 
                                                          
                                                            01/01/2021
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            28   
                                                         | 
                                                        
                                                            Draft Rajasthan Electricity Regulatory Commission (Transaction of Business) Regulations, 2021
                                                         | 
                                                        
                                                            05/02/2021
                                                         | 
                                                          
                                                            06/01/2021
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            29   
                                                         | 
                                                        
                                                            Petition filed by Ajmer Vidyut Vitran Nigam Ltd. for determination of Multiyear Tariff and Investment Plan for FY 2020-2021 to 2023-2024
                                                         | 
                                                        
                                                            08/03/2021
                                                         | 
                                                          
                                                            29/01/2021
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            30   
                                                         | 
                                                        
                                                            Petition for Approval of investment plan RVPN 2024-25
                                                         | 
                                                        
                                                            23/02/2024
                                                         | 
                                                          
                                                            18/01/2024
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            31   
                                                         | 
                                                        
                                                            Draft RERC Service (Eighth Amendment) Regulation, 2024
                                                         | 
                                                        
                                                            16/12/2024
                                                         | 
                                                          
                                                            28/11/2024
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            32   
                                                         | 
                                                        
                                                            Draft RERC (Renewable Energy Obligation) (Sixth Amendment) Regulations, 2019
                                                         | 
                                                        
                                                            15/01/2020
                                                         | 
                                                          
                                                            24/12/2019
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            33   
                                                         | 
                                                        
                                                            Petition filed by RVUN for approval of True-up of ARR for FY 2019 and determination of ARR and Tariff for FY 2021
                                                         | 
                                                        
                                                            03/02/2020
                                                         | 
                                                          
                                                            03/01/2020
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            34   
                                                         | 
                                                        
                                                            Petition filed by RVPN for approval of Investment plan for FY 2021
                                                         | 
                                                        
                                                            05/02/2020
                                                         | 
                                                          
                                                            13/01/2020
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            35   
                                                         | 
                                                        
                                                            Petition filed by Jodhpur Vidyut Vitran Nigam Ltd. for determination of Multiyear Tariff and Investment Plan for FY 2020-2021 to 2023-2024
                                                         | 
                                                        
                                                            08/03/2021
                                                         | 
                                                          
                                                            29/01/2021
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            36   
                                                         | 
                                                        
                                                            Petition filed by Jaipur Vidyut Vitran Nigam Ltd. for determination of Multiyear Tariff and Investment Plan for FY 2020-2021 to 2023-2024
                                                         | 
                                                        
                                                            08/03/2021
                                                         | 
                                                          
                                                            29/01/2021
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            37   
                                                         | 
                                                        
                                                            Petition filed by Discoms for applicability of parallel operation charges on captive consumers of Rajasthan for FY 2019-20
                                                         | 
                                                        
                                                            08/03/2021
                                                         | 
                                                          
                                                            01/02/2021
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            38   
                                                         | 
                                                        
                                                            Draft Order on installation of solar power systems at schools of the State Government
                                                         | 
                                                        
                                                            03/03/2021
                                                         | 
                                                          
                                                            10/02/2021
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            39   
                                                         | 
                                                        
                                                            Petition filed by RVUNL for determination of Final Capital Cost and ARR and Tariff For FY 2018-19 to FY 2021-22 for Chhabra Supercritical Thermal Power Station unit 5 and 6
                                                         | 
                                                        
                                                            23/03/2021
                                                         | 
                                                          
                                                            18/02/2021
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            40   
                                                         | 
                                                        
                                                            Petition filed by RVUNL for determination of ARR and Tariff for FY 2020-21 for Dholpur Combined Cycle Power Plant
                                                         | 
                                                        
                                                            23/03/2021
                                                         | 
                                                          
                                                            18/02/2021
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            41   
                                                         | 
                                                        
                                                            Petition filed by RVUNL for approval of True-up of ARR for FY 2014-15 to FY 2019-20 for Kalisindh Thermal Power Plant Unit 1 and 2
                                                         | 
                                                        
                                                            23/03/2021
                                                         | 
                                                          
                                                            18/02/2021
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            42   
                                                         | 
                                                        
                                                            Petition filed by RVPN for approval of True-up of ARR for FY 2019-20 and determination of ARR, transmission tariff and SLDC charges for FY 2021-22 
                                                         | 
                                                        
                                                            31/03/2021
                                                         | 
                                                          
                                                            26/02/2021
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            43   
                                                         | 
                                                        
                                                            Petition filed by RVUNL for determination of ARR and tariff For FY 2021-22 and approval of True-up of ARR for FY 2019-20
                                                         | 
                                                        
                                                            02/04/2021
                                                         | 
                                                          
                                                            02/03/2021
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            44   
                                                         | 
                                                        
                                                            SLDC Petition for approval of True-Up for FY 2023-24 
                                                         | 
                                                        
                                                            27/02/2025
                                                         | 
                                                          
                                                            25/01/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            45   
                                                         | 
                                                        
                                                            RVUN Petition for ARR and Tariff 2025-26
                                                         | 
                                                        
                                                            10/05/2025
                                                         | 
                                                          
                                                            10/04/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            46   
                                                         | 
                                                        
                                                            SLDC ARR and Tariff FY 2025-26
                                                         | 
                                                        
                                                            19/05/2025
                                                         | 
                                                          
                                                            17/04/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            47   
                                                         | 
                                                        
                                                            Petition filed by M/s JSW Energy (Barmer) Limited for determination of Tariff for FY 2021-22 for its Lignite based 1080 MW Thermal Generating Station. 
                                                         | 
                                                        
                                                            22/01/2021
                                                         | 
                                                          
                                                            22/12/2020
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            48   
                                                         | 
                                                        
                                                            Draft RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2020
                                                         | 
                                                        
                                                            28/01/2021
                                                         | 
                                                          
                                                            22/12/2020
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            49   
                                                         | 
                                                        
                                                            Discussion Paper on Framework for Large Scale Integration of Renewable Energy using Energy Storage Systems and its impact on Tariffs
                                                         | 
                                                        
                                                            22/04/2021
                                                         | 
                                                          
                                                            12/03/2021
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            50   
                                                         | 
                                                        
                                                            Petition filed by Ajmer Vidyut Vitran Nigam Ltd. for approval of True-up of ARR for FY 2019-20
                                                         | 
                                                        
                                                            28/05/2021
                                                         | 
                                                          
                                                            06/05/2021
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            51   
                                                         | 
                                                        
                                                            Petition filed by Jodhpur Vidyut Vitran Nigam Ltd. for approval of True-up of ARR for FY 2019-20
                                                         | 
                                                        
                                                            28/05/2021
                                                         | 
                                                          
                                                            06/05/2021
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            52   
                                                         | 
                                                        
                                                            Petition filed by Jaipur Vidyut Vitran Nigam Ltd. for approval of True-up of ARR for FY 2019-20
                                                         | 
                                                        
                                                            02/06/2021
                                                         | 
                                                          
                                                            07/05/2021
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            53   
                                                         | 
                                                        
                                                            RERC (Renewable Energy Obligation) (Seventh Amendment) Regulations, 2021
                                                         | 
                                                        
                                                            23/09/2021
                                                         | 
                                                          
                                                            02/09/2021
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            54   
                                                         | 
                                                        
                                                            In the matter of determination of project specific tariff of Municipal Solid Waste to Energy plant under Section 62 and 86 of the Electricity Act 2003
                                                         | 
                                                        
                                                            18/10/2021
                                                         | 
                                                          
                                                            29/09/2021
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            55   
                                                         | 
                                                        
                                                            Draft Methodology for Estimation of Electricity Generated form Biomass in Biomass Co-fired coal based thermal Power Plants.
                                                         | 
                                                        
                                                            03/12/2021
                                                         | 
                                                          
                                                            03/11/2021
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            56   
                                                         | 
                                                        
                                                            In the matter of proposed amendments in the procedure for implementation of the frame work on forecasting and scheduling for renewable energy generating stations wind and solar
                                                         | 
                                                        
                                                            17/12/2021
                                                         | 
                                                          
                                                            26/11/2021
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            57   
                                                         | 
                                                        
                                                            Petition for determination of Tariff  for 1080 MW (8x135 MW)  Lignite based Thermal Generating Station  of M/s JSW Energy (Barmer) Limited for F.Y. 2022-23
                                                         | 
                                                        
                                                            05/03/2022
                                                         | 
                                                          
                                                            02/02/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            58   
                                                         | 
                                                        
                                                            Petition for Aggregate Revenue Requirement (ARR) and Tariff for FY 2022-23 for DCCPP (330MW) 
                                                         | 
                                                        
                                                            06/03/2022
                                                         | 
                                                          
                                                            03/02/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            59   
                                                         | 
                                                        
                                                            Petition for Aggregate Revenue Requirement (ARR) and Tariff for FY 2022-23 for CSCTPP Unit 5 and 6 ARR
                                                         | 
                                                        
                                                            06/03/2022
                                                         | 
                                                          
                                                            03/02/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            60   
                                                         | 
                                                        
                                                            Petition for ARR and Tariff for FY 22-23 and true up for FY 20-21 
                                                         | 
                                                        
                                                            06/03/2022
                                                         | 
                                                          
                                                            03/02/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            61   
                                                         | 
                                                        
                                                            Petition for approval of investment plan for FY 2022-23
                                                         | 
                                                        
                                                            07/03/2022
                                                         | 
                                                          
                                                            04/02/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            62   
                                                         | 
                                                        
                                                            Petition for ARR and Transmission Tariff and SLDC charges for FY 2022-23 and true up of 2020-21
                                                         | 
                                                        
                                                            07/03/2022
                                                         | 
                                                          
                                                            04/02/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            63   
                                                         | 
                                                        
                                                            Draft Biomass Generic Tariff Order FT 2022-23
                                                         | 
                                                        
                                                            26/04/2022
                                                         | 
                                                          
                                                            04/04/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            64   
                                                         | 
                                                        
                                                            Petition filed by AVVNL for approval of ARR, Tariff and Investment plan for FY 2022-23
                                                         | 
                                                        
                                                            11/05/2022
                                                         | 
                                                          
                                                            11/04/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            65   
                                                         | 
                                                        
                                                            Petition filed by JdVVNL for approval of ARR, Tariff and Investment plan for FY 2022-23
                                                         | 
                                                        
                                                            13/05/2022
                                                         | 
                                                          
                                                            13/04/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            66   
                                                         | 
                                                        
                                                            Petition filed by JVVNL for true up for FY 2020-21
                                                         | 
                                                        
                                                            23/05/2022
                                                         | 
                                                          
                                                            30/04/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            67   
                                                         | 
                                                        
                                                            Petition filed by AVVNL for true up for FY 2020-21
                                                         | 
                                                        
                                                            25/05/2022
                                                         | 
                                                          
                                                            30/04/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            68   
                                                         | 
                                                        
                                                            Petition filed by JdVVNL for true up for FY 2020-21
                                                         | 
                                                        
                                                            27/05/2022
                                                         | 
                                                          
                                                            08/05/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            69   
                                                         | 
                                                        
                                                            Petition filed to seek approval for procurement of 1200 MW power on long term basis for 25 years from solar power projects with committed power supply from Energy Storage Systems for at least six hours during the peak demand period (English and Hindi Version)
                                                         | 
                                                        
                                                            09/11/2022
                                                         | 
                                                          
                                                            28/10/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            70   
                                                         | 
                                                        
                                                            Repeal of RERC (Metering) Regulations 2007 and amendments thereof and draft RERC (Metering) Practice Directions, 2021
                                                         | 
                                                        
                                                            24/03/2021
                                                         | 
                                                          
                                                            04/03/2021
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            71   
                                                         | 
                                                        
                                                            Petition for approval of 294 MW RTC long-term power purchase and approval of deviations in the Model Bidding documents
                                                         | 
                                                        
                                                            30/06/2022
                                                         | 
                                                          
                                                            10/06/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            72   
                                                         | 
                                                        
                                                            Petition filed to seek approval for procurement of 1200 MW power on long term basis for 25 years from solar power projects with committed power supply from Energy Storage Systems for at least six hours during the peak demand period (English and Hindi Version)
                                                         | 
                                                        
                                                            09/11/2022
                                                         | 
                                                          
                                                            04/11/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            73   
                                                         | 
                                                        
                                                            Petition for In-Principle Approval of additional capital expenditure within the original scope of work after cut-off date for Chhabra Super Critical Thermal Power Plant (CSCTPP) 
                                                         | 
                                                        
                                                            28/11/2022
                                                         | 
                                                          
                                                            07/11/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            74   
                                                         | 
                                                        
                                                            Draft RERC( Terms and Conditions of determination of Tariff) (2nd amendment) Regulations, 2022
                                                         | 
                                                        
                                                            05/01/2023
                                                         | 
                                                          
                                                            14/12/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            75   
                                                         | 
                                                        
                                                            Petition for determination of Final Capital Cost and Aggregate Revenue Requirement (ARR) and Tariff for FY 20-21 to FY 23-24 for SSCTPP Unit 7-8 of RVUN.
                                                         | 
                                                        
                                                            25/01/2023
                                                         | 
                                                          
                                                            26/12/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            76   
                                                         | 
                                                        
                                                            RVUN petition for ARR for 2023-24 and True Up for 2021-2022
                                                         | 
                                                        
                                                            25/01/2023
                                                         | 
                                                          
                                                            26/12/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            77   
                                                         | 
                                                        
                                                            Petition for determination of Transfer Price of Lignite from Kapurdi and Jalipa Mine for F.Y. 2022-23
                                                         | 
                                                        
                                                            20/01/2023
                                                         | 
                                                          
                                                            20/12/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            78   
                                                         | 
                                                        
                                                            Draft RERC (Renewable Purchase Obligation) Regulations, 2023
                                                         | 
                                                        
                                                            31/01/2023
                                                         | 
                                                          
                                                            07/01/2023
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            79   
                                                         | 
                                                        
                                                            Petition filed by RVPN for approval of ARR and Determination of Transmission Tariff for FY 2023-24 alongwith Truing-Up for FY 2021-22
                                                         | 
                                                        
                                                            17/02/2023
                                                         | 
                                                          
                                                            16/01/2023
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            80   
                                                         | 
                                                        
                                                            Petition filed by JVVNL for ARR, Tariff and Investment Plan for FY 2023-24 and True Up for FY 2021-22
                                                         | 
                                                        
                                                            30/01/2023
                                                         | 
                                                          
                                                            29/01/2023
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            81   
                                                         | 
                                                        
                                                            Petition filed by AVVNL for ARR, Tariff and Investment Plan for FY 2023-24 and True Up for FY 2021-22
                                                         | 
                                                        
                                                            30/01/2023
                                                         | 
                                                          
                                                            29/01/2023
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            82   
                                                         | 
                                                        
                                                            Petition filed by JVVNL for approval of ARR, Tariff and Investment plan for FY 2022-23
                                                         | 
                                                        
                                                            11/05/2022
                                                         | 
                                                          
                                                            08/04/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            83   
                                                         | 
                                                        
                                                            Petition for determination of Transfer Price of Lignite from Kapurdi and Jalipa Mine for F.Y. 2023-24
                                                         | 
                                                        
                                                            20/01/2023
                                                         | 
                                                          
                                                            20/12/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            84   
                                                         | 
                                                        
                                                            Petition of SLDC for approval of Annual Revenue Requirement / Tariff for FY 2023-24 along with Truing-Up of ARR for FY 2021-22
                                                         | 
                                                        
                                                            15/01/2023
                                                         | 
                                                          
                                                            20/12/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            85   
                                                         | 
                                                        
                                                            Petition filed by JdVVNL for ARR, Tariff and Investment Plan for FY 2023-24 and True Up for FY 2021-22
                                                         | 
                                                        
                                                            30/01/2023
                                                         | 
                                                          
                                                            29/01/2023
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            86   
                                                         | 
                                                        
                                                            Petition filed by RUVNL seeking approval for procurement of 160 MW RTC power for 5 years on the basis of the Model Bidding documents.
                                                         | 
                                                        
                                                            19/03/2023
                                                         | 
                                                          
                                                            02/03/2023
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            87   
                                                         | 
                                                        
                                                            Draft RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (First Amendment) Regulations, 2023
                                                         | 
                                                        
                                                            26/05/2023
                                                         | 
                                                          
                                                            02/05/2023
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            88   
                                                         | 
                                                        
                                                            In-Principal approval of Additional Capitalization for up-gradation of DCS HMI System and network switches along with PADO System at KalisindhThermal Power Station of RVUN
                                                         | 
                                                        
                                                            06/09/2023
                                                         | 
                                                          
                                                            28/08/2023
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            89   
                                                         | 
                                                        
                                                            Draft RERC (Service) Seventh Amendment Regulation, 2023
                                                         | 
                                                        
                                                            27/09/2023
                                                         | 
                                                          
                                                            06/09/2023
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            90   
                                                         | 
                                                        
                                                            Draft RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Second Amendment) Regulations, 2023
                                                         | 
                                                        
                                                            16/10/2023
                                                         | 
                                                          
                                                            22/09/2023
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            91   
                                                         | 
                                                        
                                                            Draft Rajasthan Electricity Regulatory Commission (Rajasthan Electricity Grid Code) Regulations, 2023
                                                         | 
                                                        
                                                            12/01/2024
                                                         | 
                                                          
                                                            08/12/2023
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            92   
                                                         | 
                                                        
                                                            Grant of Transmission License for Sangod Transmission Service Limited
                                                         | 
                                                        
                                                            16/01/2024
                                                         | 
                                                          
                                                            22/12/2023
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            93   
                                                         | 
                                                        
                                                            RVUN Petition for Aggregate Revenue Requirement (ARR) and Tariff for FY 2024-25 and Annual Performance Review (APR) for FY 2022-23
                                                         | 
                                                        
                                                            22/01/2024
                                                         | 
                                                          
                                                            22/12/2023
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            94   
                                                         | 
                                                        
                                                            Draft RERC(Electricity Supply Code and Connected Matters) (First Amendment) Regulations, 2022
                                                         | 
                                                        
                                                            11/07/2022
                                                         | 
                                                          
                                                            10/06/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            95   
                                                         | 
                                                        
                                                            Truing up of ARR for FY 20218-19 to FY 2020-21 for Chhabra Super Critical Thermal Power Plant (CSCTPP) Units 5 and 6
                                                         | 
                                                        
                                                            12/08/2022
                                                         | 
                                                          
                                                            13/07/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            96   
                                                         | 
                                                        
                                                            Petition seeking approval for selection of developers for procurement and approval of bidding documents for ISTS connected energy storage solution of 1000 MW/6000MWh 
                                                         | 
                                                        
                                                            18/12/2023
                                                         | 
                                                          
                                                            11/12/2023
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            97   
                                                         | 
                                                        
                                                            Petition for Approval of ARR (2024-25) and True-Up (2022-23) of SLDC
                                                         | 
                                                        
                                                            05/02/2024
                                                         | 
                                                          
                                                            01/01/2024
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            98   
                                                         | 
                                                        
                                                            In the matter of Determination of generic tariff for sale of electricity to Distribution Licensee from Biomass, Biogas and Biomass Gasifier based power plants getting commissioned in the State during FY 2023-24 and FY 2024-25
                                                         | 
                                                        
                                                            22/01/2024
                                                         | 
                                                          
                                                            01/01/2024
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            99   
                                                         | 
                                                        
                                                            Determination of Tariff for F.Y. 2024-25 of 1080 MW (8 x 135 MW) Lignite based Thermal Power Generating Station of M/s JSW Energy (Barmer) Limited
                                                         | 
                                                        
                                                            03/02/2024
                                                         | 
                                                          
                                                            03/01/2024
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            100   
                                                         | 
                                                        
                                                            Determination of Transfer price of lignite for F.Y. 2024-25 from Kapurdi and Jalipa Lignite Mines of M/s. Barmer Lignite Mining Company Limited
                                                         | 
                                                        
                                                            03/02/2024
                                                         | 
                                                          
                                                            03/01/2024
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            101   
                                                         | 
                                                        
                                                            Petition filed by RVPN for ARR and Tariff for FY 2024-25 and true up for FY 2022-23
                                                         | 
                                                        
                                                            23/02/2024
                                                         | 
                                                          
                                                            18/01/2024
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            102   
                                                         | 
                                                        
                                                            Petition for Aggregate Revenue Requirement and Tariff for FY 2024 - 25 and True Up for FY 2020 - 21 to FY 2022 - 23 for SSTPS Unit 7 and 8 of Suratgarh
                                                         | 
                                                        
                                                            29/02/2024
                                                         | 
                                                          
                                                            10/02/2024
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            103   
                                                         | 
                                                        
                                                            Petition for Grant of Separate Transmission Licence to Thar Power Transmission Service Limited under Regulated Tariff Mechanism (RTM) route
                                                         | 
                                                        
                                                            01/05/2024
                                                         | 
                                                          
                                                            02/04/2024
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            104   
                                                         | 
                                                        
                                                            Petition for Determination of Tariff for F.Y. 2023-24 of 1080 MW (8 x 135 MW) Lignite based Thermal Power Generating Station of M/s JSW Energy (Barmer) Limited
                                                         | 
                                                        
                                                            20/01/2023
                                                         | 
                                                          
                                                            20/12/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            105   
                                                         | 
                                                        
                                                            Petition for determination of Transfer Price of Lignite from Kapurdi and Jalipa Mine for F.Y. 2021-22
                                                         | 
                                                        
                                                            20/01/2023
                                                         | 
                                                          
                                                            20/12/2022
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            106   
                                                         | 
                                                        
                                                            Petition for determination of Transfer Price of Lignite from Kapurdi and Jalipa Mine for F.Y. 2020-21
                                                         | 
                                                        
                                                            20/01/2023
                                                         | 
                                                          
                                                            20/12/2022
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            107   
                                                         | 
                                                        
                                                            PETITION FOR APPROVAL OF POWER PURCHASE FROM SHORT TERM SOURCES FOR RAJASTHAN DISCOMS
                                                         | 
                                                        
                                                            28/06/2023
                                                         | 
                                                          
                                                            06/06/2023
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            108   
                                                         | 
                                                        
                                                            Petition for In-principle approval of the Commission for installation of Sewage Treatment Plant at KSTPS.
                                                         | 
                                                        
                                                            05/10/2023
                                                         | 
                                                          
                                                            18/09/2023
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            109   
                                                         | 
                                                        
                                                            PETITION FOR APPROVAL OF TRUE UP FOR FY 2022-23 AND AGGREGATE REVENUE REQUIREMENT, TARIFF ANDINVESTMENT PLAN FOR FY 2024-25 Filed By JAIPUR VIDYUT VITRAN NIGAM LIMITED, JAIPUR
                                                         | 
                                                        
                                                            21/06/2024
                                                         | 
                                                          
                                                            31/05/2024
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            110   
                                                         | 
                                                        
                                                            Petition for approval of True-Up for FY 2022-23, ARR and Tariff and Investment Plan for FY 2024-25 in respect of AVVNL
                                                         | 
                                                        
                                                            21/06/2024
                                                         | 
                                                          
                                                            31/05/2024
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            111   
                                                         | 
                                                        
                                                            Petition for approval of True-Up for FY 2022-23, ARR and Tariff and Investment Plan for FY 2024-25 in respect of JdVVNL
                                                         | 
                                                        
                                                            25/06/2024
                                                         | 
                                                          
                                                            04/06/2024
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            112   
                                                         | 
                                                        
                                                            PETITION FOR APPROVAL OF PARALLEL OPERATION CHARGES ON CAPTIVE CONSUMERS OF RAJASTHAN FOR FY 24-25
                                                         | 
                                                        
                                                            17/09/2024
                                                         | 
                                                          
                                                            16/08/2024
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            113   
                                                         | 
                                                        
                                                            PETITION FILED UNDER SECTION 62 (DETERMINATION OF TARIFF) OF THE ELECTRICITY ACT 2003, READ WITH REGULATION 19 AND 21 OF RERC (TRANSACTION OF BUSINESS), REGULATIONS, 2021, FOR APPROVAL OF PRE-FIXED LEVELIZED TARIFFFOR SOLAR POWER CAPACITY OF 1,000 MW AVAILABLE FOR IMPLEMENTATION UNDER COMPONENT A OF PM-KUSUM SCHEME IN RAJASTHAN DISCOMS.
                                                         | 
                                                        
                                                            04/10/2024
                                                         | 
                                                          
                                                            27/09/2024
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            114   
                                                         | 
                                                        
                                                            Draft RERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024
                                                         | 
                                                        
                                                            18/10/2024
                                                         | 
                                                          
                                                            30/09/2024
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            115   
                                                         | 
                                                        
                                                            Draft RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources)(First Amendment) Regulations, 2023
                                                         | 
                                                        
                                                            26/05/2023
                                                         | 
                                                          
                                                            02/05/2023
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            116   
                                                         | 
                                                        
                                                            Petition for Grant of Separate Transmission Licence to Barmer Power Transmission Service Limited under Regulated Tariff Mechanism (RTM) route
                                                         | 
                                                        
                                                            01/05/2024
                                                         | 
                                                          
                                                            02/04/2024
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            117   
                                                         | 
                                                        
                                                            In-Principle Approval of additional capitalization of capital expenditure of original scope after cut-off date for SSCTPP Unit 7 and 8 of RVUN
                                                         | 
                                                        
                                                            06/12/2024
                                                         | 
                                                          
                                                            18/11/2024
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            118   
                                                         | 
                                                        
                                                            Petition for Annual Performance Review (APR) for FY 2023-24 in respect of Power Stations of RVUN
                                                         | 
                                                        
                                                            10/01/2025
                                                         | 
                                                          
                                                            26/12/2024
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            119   
                                                         | 
                                                        
                                                            Draft RERC (Terms and Conditions for Determination of Tariff) Regulations, 2025
                                                         | 
                                                        
                                                            23/12/2024
                                                         | 
                                                          
                                                            27/11/2024
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            120   
                                                         | 
                                                        
                                                            PETITION FOR APPROVAL OF PREFIXED LEVELIZED TARIFF FOR SOLAR POWER CAPACITY OF 5000 MW AVAILABLE FOR IMPLEMENTATION UNDER COMPONENT A OF PM-KUSUM SCHEME IN RAJASTHAN DISCOMS
                                                         | 
                                                        
                                                            28/02/2025
                                                         | 
                                                          
                                                            21/02/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            121   
                                                         | 
                                                        
                                                            Petition for Approval of investment plan RVPN 2025-26
                                                         | 
                                                        
                                                            24/02/2025
                                                         | 
                                                          
                                                            23/01/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            122   
                                                         | 
                                                        
                                                            Petition submitted by Ajmer Discom seeking approval of True-Up for FY 2023-24
                                                         | 
                                                        
                                                            02/04/2025
                                                         | 
                                                          
                                                            12/03/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            123   
                                                         | 
                                                        
                                                            JVVNL Petition for ARR Tariff and Investment Plan for FY 2025-26
                                                         | 
                                                        
                                                            19/05/2025
                                                         | 
                                                          
                                                            10/04/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            124   
                                                         | 
                                                        
                                                            JdVVNL petition for ARR, Tariff and Investment plan 2025-26
                                                         | 
                                                        
                                                            11/05/2025
                                                         | 
                                                          
                                                            12/04/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            125   
                                                         | 
                                                        
                                                            BLMCL Transfer Price Petition 2025-26
                                                         | 
                                                        
                                                            16/05/2025
                                                         | 
                                                          
                                                            16/04/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            126   
                                                         | 
                                                        
                                                            RVPN ARR and Tariff FY 2025-26
                                                         | 
                                                        
                                                            20/05/2025
                                                         | 
                                                          
                                                            18/04/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            127   
                                                         | 
                                                        
                                                            Draft Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) (3rd Amendment) Regulations, 2023
                                                         | 
                                                        
                                                            28/08/2023
                                                         | 
                                                          
                                                            06/08/2023
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            128   
                                                         | 
                                                        
                                                            Petition filed by Military Engineer Services for Distribution License
                                                         | 
                                                        
                                                            23/07/2024
                                                         | 
                                                          
                                                            26/06/2024
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            129   
                                                         | 
                                                        
                                                            Draft RERC(Green Energy Open Access) Regulations, 2024
                                                         | 
                                                        
                                                            28/10/2024
                                                         | 
                                                          
                                                            23/10/2024
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            130   
                                                         | 
                                                        
                                                            Petition under Section 86(1) (b) for approval of power procurement process of 3200 MW for long term with deviations in model bidding document for DBFOO
                                                         | 
                                                        
                                                            24/03/2025
                                                         | 
                                                          
                                                            10/03/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            131   
                                                         | 
                                                        
                                                            True up JVVNL 2023-24
                                                         | 
                                                        
                                                            15/04/2025
                                                         | 
                                                          
                                                            21/03/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            132   
                                                         | 
                                                        
                                                            True up Petition JdVVNL 2023-24
                                                         | 
                                                        
                                                            12/04/2025
                                                         | 
                                                          
                                                            24/03/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            133   
                                                         | 
                                                        
                                                            AVVNL petition for ARR Tariff and Investment plan FY 2025-26
                                                         | 
                                                        
                                                            13/05/2025
                                                         | 
                                                          
                                                            12/04/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            134   
                                                         | 
                                                        
                                                            JSW Energy Petition for ARR and Tariff for FY 2025-26
                                                         | 
                                                        
                                                            16/05/2025
                                                         | 
                                                          
                                                            16/04/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            135   
                                                         | 
                                                        
                                                            Petition for amendments in RERC Grid Interactive Distributed Renewable Energy Generating Systems Regulations, 2021 to enable introduction of Virtual Net Metering and Group Net Metering in Rajasthan
                                                         | 
                                                        
                                                            16/06/2025
                                                         | 
                                                          
                                                            27/05/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            136   
                                                         | 
                                                        
                                                            Draft procedure for Connectivity to the Intra State transmission system
                                                         | 
                                                        
                                                            14/07/2025
                                                         | 
                                                          
                                                            12/06/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            137   
                                                         | 
                                                        
                                                            In-Principle approval of Additional Capitalization for fulfilling the Cyber Security Guidelines prescribed by CEA for Power Station of RVUN
                                                         | 
                                                        
                                                            12/07/2025
                                                         | 
                                                          
                                                            18/06/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            138   
                                                         | 
                                                        
                                                            Petition for approval for procurement of 500 MW RTC power for 5 years from Power Stations set up on Finance, Own and Operate (FOO) basis
                                                         | 
                                                        
                                                            04/08/2025
                                                         | 
                                                          
                                                            07/07/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            139   
                                                         | 
                                                        
                                                            Interlocutory Application in the matter of petition for InPrinciple approval of additional capital expenditure within the original scope of work after the cut-off datefor SSCTPP Unit7 and 8
                                                         | 
                                                        
                                                            25/08/2025
                                                         | 
                                                          
                                                            05/08/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            140   
                                                         | 
                                                        
                                                            Petition filed by RVPN for approval of True-Up of ARR for FY 2023-24
                                                         | 
                                                        
                                                            17/02/2025
                                                         | 
                                                          
                                                            23/01/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            141   
                                                         | 
                                                        
                                                            Petition for Transfer or Revival of 250 MW GLTPP and for setting up 1100 MW lignite based thermal power asset under DBFOO 
                                                         | 
                                                        
                                                            02/08/2025
                                                         | 
                                                          
                                                            07/07/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            142   
                                                         | 
                                                        
                                                            Draft Procedure for Grant of Green Energy Open Access
                                                         | 
                                                        
                                                            29/09/2025
                                                         | 
                                                          
                                                            12/09/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            143   
                                                         | 
                                                        
                                                            Submission in the matter of Petition for ARR and Transmission Tariff and SLDC charges for FY 2022-23 and true up of 2020-21 bearing petition no RERC/1979/2022 in compliance of APTEL Judgment dated 05.08.2025 in APL No. 815 of 2023 
                                                         | 
                                                        
                                                            03/11/2025
                                                         | 
                                                          
                                                            10/10/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            144   
                                                         | 
                                                        
                                                            Additional submissions in Petition under Section 86(1) (b) for approval of power procurement process of 3200 MW for long term with deviations in model bidding document for DBFOO
                                                         | 
                                                        
                                                            04/08/2025
                                                         | 
                                                          
                                                            25/07/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            145   
                                                         | 
                                                        
                                                            Draft RERC (Electricity Supply Code and Connected Matters) (Second Amendment) Regulations, 2025
                                                         | 
                                                        
                                                            06/10/2025
                                                         | 
                                                          
                                                            15/09/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            146   
                                                         | 
                                                        
                                                            Petition for approval of 09 new schemes announced in the state budget speech on 19.02.2025 within the ceiling limit of Rs. 5073 crores approved Investment Plan 2025-26
                                                         | 
                                                        
                                                            28/10/2025
                                                         | 
                                                          
                                                            06/10/2025
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            147   
                                                         | 
                                                        
                                                            Petition and additional submissions for amendments in RERC Grid Interactive Distributed Renewable Energy Generating Systems Regulations, 2021 to enable introduction of Virtual Net Metering and Group Net Metering in Rajasthan
                                                         | 
                                                        
                                                            12/09/2025
                                                         | 
                                                          
                                                            01/09/2025
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            148   
                                                         | 
                                                        
                                                            Petition for Grant of Separate Transmission Licence to Hadoti Power Transmission Service Limited under Regulated Tariff Mechanism (RTM) route
                                                         | 
                                                        
                                                            01/05/2024
                                                         | 
                                                          
                                                            02/04/2024
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            149   
                                                         | 
                                                        
                                                            Draft RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024
                                                         | 
                                                        
                                                            22/07/2024
                                                         | 
                                                          
                                                            05/07/2024
                                                         | 
                                                        
                                                            
                                                                     
                                                                
                                                         | 
                                                    
                                                
                                                    
                                                        | 
                                                            150   
                                                         | 
                                                        
                                                            Petition for Aggregate Revenue Requirement (ARR) and Tariff for FY 2024-25 Dholpur Combined Cycle Power Plant (DCCPP), Dholpur
                                                         | 
                                                        
                                                            01/11/2024
                                                         | 
                                                          
                                                            14/10/2024
                                                         | 
                                                        
                                                           
                                                                     
                                                                
                                                         |